Extron electronic PVS 305SA manual Stage Two Install the Wall Plates and MLC 104 IP Plus

Page 19

Stage Two — Install the Wall Plates and MLC 104 IP Plus

Stage 2

This stage involves installing the devices shown below.

PVT CV D and PVT RGB D Plus PoleVault A/V Source Input Wall Plates*

PVT CV D

PVT RGB D Plus

 

VIDEO IN

 

Audio and

 

 

 

 

AUDIO IN

 

Video input

 

 

Connectors

L

 

R

 

 

 

 

 

 

IR OUT

 

 

 

S G

 

 

 

 

 

IR Output

VIDEO IN

AUDIO IN

L

R

IR OUT

S

G

Audio and

Video input

Connectors

IR Input

Connector

(at rear)

IR Output

AUDIO

IN

OUT

COMPUTER IN

MONITOR OUT

S

G

IR OUT

 

Line Out

Audio Output

Port

Local Monitor Output Port

 

Line Out

G R

Audio Input

L

Connector

 

 

(at rear)

 

G S

RGB A RGB B

IR Input

OUT OUT

Connector

 

 

(at rear)

Decora

Mounting

Faceplate

Screws (2)

Audio and Video

Audio and Video

Output Port (at rear)

Output Ports (2** at rear)

** Each RGB Wall Plate needs 2 Output Cables, A and B.

Where it goes: Installs in a wall near input source location.

What it does: Transmits an input source’s composite or RGB video signal, and audio signals to the switcher.

* Wall plates included may differ slightly from those shown in this manual.

MLC 104 IP Plus MediaLink Controller

Mounting screws (4)

Captive screw connectors for:

Display/RS-232/IR

Comm. Link

Digital I/O,

MLS/RS-232

Power

DISPLAY

ON

OFF

VOLUME

CONFIG

VCR

DVD

PC

1

2

3

4

RS-

 

Tx

 

 

 

 

Rx

 

 

RUN

DISPLAY

GROUND

 

 

100

IR OUT

 

 

 

232/IR

 

 

 

 

A+12V OUT

 

 

 

BGROUND

 

 

 

COMM

 

CM

 

 

Ethernet

CD

IR IN

 

 

LINK

 

SCP

 

 

port

E

LAN

 

 

 

 

 

1

TWEEKER TO REMOVE

 

I/O

 

2

 

 

 

3

 

 

DIGITAL

 

PRESSTAB WITH

 

 

GROUND

 

RS-

 

Rx

 

 

 

 

MLS BA Tx

 

232

GROUND

 

12V

 

GROUND

 

 

 

POWER

 

 

 

 

 

+12V IN

 

 

 

MLC 104 IP PLUS

Right Side

 

Rear View

 

 

 

 

 

 

 

 

Location of

MAC address

00-05-A6-01-6B-F5

Where it goes: Installs in a wall at a location convenient to user.

What it does: Provides remote control of switcher and projector.

PoleVault Systems Installation • Installation — Stage 2

2-8

Image 19
Contents PoleVault Systems Installation GuideSicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisIntroduction PoleVault Systems Installation IntroductionFCC Class B Notice Introduction, contd PoleVault System installation and wiring overviewRoom Typical classroom installationPoleVault Systems Installation Introduction Planning Room layoutADA overhead and side clearance requirements Example classroom installationIntroduction Planning, cont’d Location of the screen and projectorCabling obstacles Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Location of source devicesInventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d Introduction Inventory Overview, cont’d Optional installation hardwareItems not included Installation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation Slotted Pipe Supplied with PCM Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage PCM 340 Projector Drop Ceiling Mount1a Mark the screen location Installation Stage One, cont’dInstall projector to verify location Mark screen locationHorizontal offset 2f Slide and lock the projector onto the adjuster plateVerify the image location 2e Attach the bracket to the projector 4b Take measurements with the PCM 340 on the T-frame Preliminary safety hardware installation 5a Mark structural ceiling for lag eye bolt installation Cut the ceiling tile7c Hand tighten the turnbuckles Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7a Attach turnbuckles at the cornersInstall the Screen Install the electrical box if required8a Install Raco box and plaster ring This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IP PlusMLC 104 IP Plus MediaLink Controller RS-232 or to an IR emitter Installation Stage Two, cont’dCables IR/RS-232 communications cable control cable1c Insert the mud ring Install the mud rings1d Features for mud ring installation MLC 104 IP Plus mud ringPull the cables at the input locations Signal Cable Label color2c Pull the cables at each location MLC 104 IP Plus controller Install wall platesWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher Appropriate 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with An RS-232 cable or IR emitter cable, as4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusFF 120 Flat Field Ceiling Speakers Stage Three Install the FF 120 Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’dInstall the speaker on the drop ceiling 2h Attach safety cableTo terminate the cable, strip the end of the cable 0.2 inch Terminate the speaker cable for the PVS switcherPole captive screw connector Stereo or dual mono output using parallel speaker wiringPMK 550 Pole Mount Kit Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PVS 305SA PoleVault SwitcherPoleVault Systems Installation Installation Stage 4 Install the PMK 550 base plate2b Gather the cables, pass them down the pipe Installation Stage Four, cont’dPull the cables at the switcher location Switcher and projector cable overviewConnect the cables as follows to the PVS 305SA Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus 4a Connect the cables to the switcher4d Cable the projector 4b Reattach UPB bracket and 4c projectorConfigure the switcher MLS Switcher Configuration program Stage Five Configure the Switcher and the SystemGlobal configurator software Configure the system Global Configurator Installation Stage Five, cont’d3c Check that an image is present, adjust as needed Loosen all pivot screws and adjust the vertical angleTest the system 3d Test the MLC configuration Final installationAdjust the configuration as necessary Where installed, if necessary, adjust the sensitivityPlug VoiceLift cable into PVS 305SA Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Attach the Z bracket to the ceiling tile and the back plateUL-compliant junction box and cover Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor Priority Page Sensor Kit included partsTypical paging system with the PVS 305SA switcher Testing and Adjustment Procedure4 Sensitivity knob adjustment Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateExtron PCM Reference Information, cont’dPoleVault Systems Installation Basic SIS Commands SIS CommandsPVS 305SA specific symbol definitions SIS Command/Response Table Ascii TelnetExtron USA West