Extron electronic PVS 305SA manual Installation Stage Four, cont’d

Page 32

Installation — Stage Four, cont’d

2.Pull the cables (at the switcher location)

a.Gather all the cables from the speakers, A/V wall plates, MLC 104 IP Plus controller, and any installed optional devices that have been run to the switcher location, and pull them down through the ceiling hole and the pipe. These cables are:

the MLC power/RS-232 cable

the CAT 5 input cables from the wall plates

the speaker cables

the MLC to projector (IR/RS-232 projector control) cable

any optional device cables (e.g. Aux audio input Priority Page Sensor Kit, VoiceLift etc.)

b.Pull the cables out of the pipe slot towards the switcher, ready for connection. Leave the IR/RS-232 projector control cable to hang out of the bottom of the pipe.

c.Connect the output video signal cables (VGA and RCA) to the switcher and pull the loose ends down the pipe so that they hang out the pipe with the IR/RS-232 projector control cable. These cables connect to the projector later.

NDo not thread any high voltage power cabling, such as power supply or projector power cords, through the projector pipe. This violates National Electrical Code.

2b Gather the cables, pass them down the pipe.

Cables from A/V wall plates, MLC 104 IP Plus, and FF 120 speakers.

Optional accessory cables from the VoiceLift and

Page Sensor may also be included.

1

1

1

4

2

3

3

Cables to PVS 305SA

1 A/V wall plate cables, CAT 5

2 MLC 104 IP Plus switcher control cable

3 FF 120 speaker cables

1

1

Power

Supply

 

6

3

5

 

2

 

PoleVault

Switcher

Projector

Pole

Cable Access

Slot

 

Cables to Projector

4 5 6

4

IR/RS-232 projector control cable

To Projector

5

VGA cable

 

 

6

Video RCA cable

NNot all cables that may need to be installed are shown here.

Switcher and projector cable overview

2-21 PoleVault Systems Installation • Installation — Stage 4

Image 32
Contents Installation Guide PoleVault SystemsPrecautions Safety Instructions EnglishConsignes de Sécurité Français Sicherheitsanleitungen DeutschFCC Class B Notice PoleVault Systems Installation IntroductionIntroduction PoleVault System installation and wiring overview Introduction, contdTypical classroom installation PoleVault Systems Installation Introduction PlanningRoom layout RoomExample classroom installation Introduction Planning, cont’dLocation of the screen and projector ADA overhead and side clearance requirementsExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesLocation of source devices Cabling obstaclesIncluded items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, cont’d Items not included Optional installation hardwareIntroduction Inventory Overview, cont’d Installation tools PoleVault Systems Installation Installation Installation OverviewOutline of installation steps Stage One Install the Screen and Projector PoleVault Systems Installation Installation StagePCM 340 Projector Drop Ceiling Mount Slotted Pipe Supplied with PCMInstallation Stage One, cont’d Install projector to verify locationMark screen location 1a Mark the screen location2f Slide and lock the projector onto the adjuster plate Verify the image location2e Attach the bracket to the projector Horizontal offsetPreliminary safety hardware installation 5a Mark structural ceiling for lag eye bolt installationCut the ceiling tile 4b Take measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount installation Secure the Projector Drop Ceiling Mount to the ceiling7a Attach turnbuckles at the corners 7c Hand tighten the turnbuckles8a Install Raco box and plaster ring Install the electrical box if requiredInstall the Screen MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IP PlusThis stage involves installing the devices shown below Installation Stage Two, cont’d CablesIR/RS-232 communications cable control cable RS-232 or to an IR emitterInstall the mud rings 1d Features for mud ring installationMLC 104 IP Plus mud ring 1c Insert the mud ring2c Pull the cables at each location Signal Cable Label colorPull the cables at the input locations Install wall plates MLC 104 IP Plus controller4a Connecting the MLC to the switcher Install MediaLink ControllerWire stripping lengths 4c Connect to the LAN using a CAT 5 cable Connect the MLC to the projector withAn RS-232 cable or IR emitter cable, as AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling SpeakersInstallation Stage Three, cont’d Install the speaker on the drop ceiling2h Attach safety cable Cut ceiling tile Terminate the speaker cable for the PVS switcher Pole captive screw connector Stereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable 0.2 inchStage Four Install the PMK 550 and the PVS 305SA This stage covers installing the devices shown belowPVS 305SA PoleVault Switcher PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Installation Stage Four, cont’d Pull the cables at the switcher locationSwitcher and projector cable overview 2b Gather the cables, pass them down the pipeFinish installing the Pole Mount kit BControl/power cable from the MLC 104 IP Plus4a Connect the cables to the switcher Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorGlobal configurator software Stage Five Configure the Switcher and the SystemConfigure the switcher MLS Switcher Configuration program Installation Stage Five, cont’d Configure the system Global ConfiguratorTest the system Loosen all pivot screws and adjust the vertical angle3c Check that an image is present, adjust as needed Final installation Adjust the configuration as necessaryWhere installed, if necessary, adjust the sensitivity 3d Test the MLC configurationOptional Accessory Installation VoiceLift System Align the arrows on the housing rim and the dome tabAttach the Z bracket to the ceiling tile and the back plate Plug VoiceLift cable into PVS 305SAOptional Accessory Installation Priority Page Sensor Kit Open the sensor and loop a wire around the sensorPriority Page Sensor Kit included parts UL-compliant junction box and cover4 Sensitivity knob adjustment Testing and Adjustment ProcedureTypical paging system with the PVS 305SA switcher PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Commands PVS 305SA specific symbol definitionsSIS Command/Response Table Ascii Telnet PoleVault Systems Installation Basic SIS CommandsExtron USA West