Extron electronic PVS 305SA Pull the cables at the input locations, Signal Cable Label color

Page 22

Installation — Stage Two, cont’d

2. Pull the cables (at the input locations)

The following cables need to be installed:

CAT 5 cables for signal transmission from the A/V wall plates to the PVS 305SA

NFor PVT RGB D and PVT RGB D Plus wall plates, two CAT 5 signal cables for each input are needed.

Maximum distance from the PVS 305SA to the Wall plates is 100 feet.

The optimum distance is between 50 and 75 feet. Minimum distance is 15 feet.

The CAT 5 cables supplied are terminated to the TIA 568A standard. Other CAT 5 cables can be used if they are TIA 568A or 568B standards and terminated to the same standard at both ends.

CAT 5 cables (not included) for MLC network connection

PoleVault switcher communication cable from the MediaLink controller (MLC PW/RS-232/VC, 50’, part # 26-626-50)

Projector communication cables from the MediaLink controller (IR Serial Comm, 50’, part # 26-621-50)

a.Drill cable pathways through any obstructions (e.g., wall caps, fire-breaks, or horizontal studs).

b.Label the CAT 5 signal cables at both ends with the supplied labels.

c.Pull the cabling through the wall from the ceiling space down to the location of the transmitters and other wall devices, and out through the openings.

TSecure cables with cable clamps to provide strain relief.

Trim back the outer foil shield to the point where the cable exits the cable clamp, and insulate exposed cable shields with heat shrink to reduce the chance of short circuits.

Both braided and foil shields should be connected to an equipment ground at the other end of the cable.

NOTE Fasten the colored section to the cable first, then wrap the clear section around it.

RGB #1A

2b Use the supplied labels for clear cable identification during installation.

Signal Cable

Label color

 

 

RGB 1A (Input 1 RGB)

Orange

 

 

RGB 1 B (Input 1 RGB)

Orange

 

 

RGB 2A (Input 2 RGB)

Yellow

 

 

RGB 2B (Input 2 RGB)

Yellow

 

 

RGB 3A (Input 3 RGB)

Magenta

 

 

RGB 3B (Input 3 RGB)

Magenta

 

 

RGB 4A (Input 4 RGB)

Light Green

 

 

RGB 4B (Input 4 RGB)

Light Green

 

 

Video 3 (Input 3 Composite Vid)

Dark Green

 

 

Video 4 (Input 1 Composite Vid)

Red

 

 

2c Pull the cables at each location.

2-11 PoleVault Systems Installation • Installation — Stage 2

Image 22
Contents Installation Guide PoleVault SystemsConsignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschIntroduction PoleVault Systems Installation IntroductionFCC Class B Notice PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsLocation of source devices Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Cabling obstaclesInventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d Introduction Inventory Overview, cont’d Optional installation hardwareItems not included Installation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation PCM 340 Projector Drop Ceiling Mount Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage Slotted Pipe Supplied with PCMMark screen location Installation Stage One, cont’dInstall projector to verify location 1a Mark the screen location2e Attach the bracket to the projector 2f Slide and lock the projector onto the adjuster plateVerify the image location Horizontal offsetCut the ceiling tile Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation 4b Take measurements with the PCM 340 on the T-frame7a Attach turnbuckles at the corners Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7c Hand tighten the turnbucklesInstall the Screen Install the electrical box if required8a Install Raco box and plaster ring This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IP Plus MLC 104 IP Plus MediaLink Controller IR/RS-232 communications cable control cable Installation Stage Two, cont’dCables RS-232 or to an IR emitterMLC 104 IP Plus mud ring Install the mud rings1d Features for mud ring installation 1c Insert the mud ringPull the cables at the input locations Signal Cable Label color2c Pull the cables at each location Install wall plates MLC 104 IP Plus controllerWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling Speakers2h Attach safety cable Installation Stage Three, cont’dInstall the speaker on the drop ceiling Cut ceiling tileStereo or dual mono output using parallel speaker wiring Terminate the speaker cable for the PVS switcherPole captive screw connector To terminate the cable, strip the end of the cable 0.2 inchPVS 305SA PoleVault Switcher Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Switcher and projector cable overview Installation Stage Four, cont’dPull the cables at the switcher location 2b Gather the cables, pass them down the pipe4a Connect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorConfigure the switcher MLS Switcher Configuration program Stage Five Configure the Switcher and the SystemGlobal configurator software Installation Stage Five, cont’d Configure the system Global Configurator3c Check that an image is present, adjust as needed Loosen all pivot screws and adjust the vertical angleTest the system Where installed, if necessary, adjust the sensitivity Final installationAdjust the configuration as necessary 3d Test the MLC configurationAttach the Z bracket to the ceiling tile and the back plate Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Plug VoiceLift cable into PVS 305SAPriority Page Sensor Kit included parts Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor UL-compliant junction box and coverTypical paging system with the PVS 305SA switcher Testing and Adjustment Procedure4 Sensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Command/Response Table Ascii Telnet SIS CommandsPVS 305SA specific symbol definitions PoleVault Systems Installation Basic SIS CommandsExtron USA West