Extron electronic PVS 305SA manual Extron USA West

Page 46

Outline of installation steps

Stage One — Install the Screen and Projector.

cMark the screen location (page 2-3).

cInstall projector to verify location (page 2-3).

cVerify the image location (page 2-4).

cCut the ceiling tile (page 2-5).

cPreliminary safety hardware installation (page 2-5).

cFinish projector drop ceiling mount installation (page 2-6).

cSecure the projector drop ceiling mount to the ceiling (page 2-6).

cInstall the electrical box (if required) (page 2-7).

cInstall the screen (page 2-7).

Stage Two — Install the A/V Source Input Wall Plates and MLC 104 IP Plus.

cInstall the mud rings (page 2-10).

cPull cables (at the input locations) (page 2-11).

cInstall the wall plates (page 2-12).

cInstall the MediaLink Controller (page 2-13).

Stage Three — Install the FF 120 Speakers.

cCut the ceiling tile (page 2-17).

cInstall the speaker on the drop ceiling (page 2-17 ).

cTerminate the speaker cable for the PVS switcher (page 2-18).

Stage Four — Install the PMK 550 and the PVS 305SA.

cInstall the PMK 550 base plate (page 2-20).

cPull the cables (at the switcher location) (page 2-21).

cFinish installing the pole mount kit (page 2-22).

Stage Five — Configure the switcher and the system.

cConfigure the switcher — MLS Switcher Configuration program (page 2-24).

cConfigure the system — Global Configurator (page 2-25).

cTest the system (page 2-26).

cFinal installation (page 2-27)

Extron USA - West

Headquarters

+800.633.9876

Inside USA / Canada Only

+1.714.491.1500 +1.714.491.1517 FAX

Extron USA - East

+800.633.9876

Inside USA / Canada Only

+1.919.863.1794 +1.919.863.1797 FAX

Extron Europe

+800.3987.6673

Inside Europe Only

+31.33.453.4040 +31.33.453.4050 FAX

Extron Asia

+800.7339.8766

Inside Asia Only

+65.6383.4400 +65.6383.4664 FAX

Extron Japan

+81.3.3511.7655 +81.3.3511.7656 FAX

Extron China

+400.883.1568

Inside China Only

+86.21.3760.1568 +86.21.3760.1566 FAX

Extron Middle East

+971.4.2991800 +971.4.2991880 FAX

© 2009 Extron Electronics. All rights reserved.

Image 46
Contents Installation Guide PoleVault SystemsConsignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschIntroduction PoleVault Systems Installation IntroductionFCC Class B Notice PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsLocation of source devices Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Cabling obstaclesInventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d Introduction Inventory Overview, cont’d Optional installation hardwareItems not included Installation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation PCM 340 Projector Drop Ceiling Mount Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage Slotted Pipe Supplied with PCMMark screen location Installation Stage One, cont’dInstall projector to verify location 1a Mark the screen location2e Attach the bracket to the projector 2f Slide and lock the projector onto the adjuster plateVerify the image location Horizontal offsetCut the ceiling tile Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation 4b Take measurements with the PCM 340 on the T-frame7a Attach turnbuckles at the corners Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7c Hand tighten the turnbucklesInstall the Screen Install the electrical box if required8a Install Raco box and plaster ring This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IP PlusMLC 104 IP Plus MediaLink Controller IR/RS-232 communications cable control cable Installation Stage Two, cont’dCables RS-232 or to an IR emitterMLC 104 IP Plus mud ring Install the mud rings1d Features for mud ring installation 1c Insert the mud ringPull the cables at the input locations Signal Cable Label color2c Pull the cables at each location Install wall plates MLC 104 IP Plus controllerWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling Speakers2h Attach safety cable Installation Stage Three, cont’dInstall the speaker on the drop ceiling Cut ceiling tileStereo or dual mono output using parallel speaker wiring Terminate the speaker cable for the PVS switcherPole captive screw connector To terminate the cable, strip the end of the cable 0.2 inchPVS 305SA PoleVault Switcher Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Switcher and projector cable overview Installation Stage Four, cont’dPull the cables at the switcher location 2b Gather the cables, pass them down the pipe4a Connect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorConfigure the switcher MLS Switcher Configuration program Stage Five Configure the Switcher and the SystemGlobal configurator software Installation Stage Five, cont’d Configure the system Global Configurator3c Check that an image is present, adjust as needed Loosen all pivot screws and adjust the vertical angleTest the system Where installed, if necessary, adjust the sensitivity Final installationAdjust the configuration as necessary 3d Test the MLC configurationAttach the Z bracket to the ceiling tile and the back plate Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Plug VoiceLift cable into PVS 305SAPriority Page Sensor Kit included parts Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor UL-compliant junction box and coverTypical paging system with the PVS 305SA switcher Testing and Adjustment Procedure4 Sensitivity knob adjustment PoleVault Systems Installation Reference Information Reference Information Wall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Command/Response Table Ascii Telnet SIS CommandsPVS 305SA specific symbol definitions PoleVault Systems Installation Basic SIS CommandsExtron USA West