Extron electronic PVS 305SA manual Optional Accessory Installation VoiceLift System

Page 39

Optional Accessory Installation — VoiceLift System

The Extron VoiceLift system is an easy-to-use, low-power, voice amplification system that ensures the speaker’s voice

can be clearly heard at a comfortable level throughout the classroom. Speech is picked up by the pendant microphone

worn by the teacher and is transmitted wirelessly via a base station receiver and the PVS 305SA to the installed ceiling

speakers.

For detailed installation information, refer to the VoiceLift Installation Instructions, supplied with the device.

VoiceLift System included parts:

VLP 102 pendant microphone

VLR 102 Receiver

Wall charger

Installation Procedure

WAll structural steps, anchoring, and electrical installation should be performed by qualified personnel in accordance with local and national building codes, fire and safety codes, and local and national electrical codes.

1. Determine the optimal receiver location and mark and drill a 2.5 inch hole in the ceiling tile where it is to be installed.

2. Insert the ceiling bracket screw through the back plate (attached to the housing) and the hole in the ceiling tile and loosely attach the Z bracket.

3.Align the back plate knockout over the hole in the ceiling tile and tighten the bracket screw to secure.

4. Replace the ceiling tile.

5. Pull the communication/power RJ-45 Ethernet cable (and

other secondary use cables) through the receiver’s base

and connect the Ethernet cable to the Receiver OUT port (the RJ-45 connector on the left on the receiver base).

6.If desired, set the Tone and Mix DIP switches on the receiver base.

7.Place the dome onto the housing, align the arrows on the dome’s locking tab and on the housing rim. Turn the dome until it locks in place (approximately 1/8 turn).

8. Pull the cables from the receiver to the PVS 305SA

switcher’s location, through the pipe and down into the PMK 550.

9. Disconnect the power from the switcher, and plug the

included VoiceLift RJ-45 into the PVS 305SA’s VoiceLift

receiver port.

10. Replace power to the switcher. This also powers the

VoiceLift receiver.

2Attach the Z bracket to the ceiling tile and the back plate.

Tab

Arrow

 

Dot

 

Tab

 

Align Arrows

Twist to

Arrow

Lock

 

Receiver

Dome

7Align the arrows on the housing rim and the dome tab.

 

 

17TT

 

LINE OUT

AMPLIFIED AUDIO OUT

 

® US

 

 

DO NOT

 

 

 

AUDIO/VIDEO

 

 

GROUND

 

 

 

LISTED

APPARATUS

 

 

OR SHORT

 

2/4/8

 

 

 

 

 

SPEAKER

 

Ohms

 

OUTPUTS

VOICELIFT

L

R

OUTPUTS

 

 

 

RECEIVER

CLASS 2 WIRING

L

R

RGB

VIDEO

 

L

R

10V

50mA

CONTROL

 

 

 

 

 

 

 

 

 

 

Tx Rx IR 12V

 

 

 

AUX AUDIO

PAGING

 

RS-232 MLC/IR

 

 

 

 

INPUT 5

SENSOR VOL/MUTE

 

VoiceLift

input

9Plug VoiceLift cable into PVS 305SA

PoleVault Systems Installation • Optional Accessory Installation

3-1

Image 39
Contents PoleVault Systems Installation GuideSicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisPoleVault Systems Installation Introduction IntroductionFCC Class B Notice Introduction, contd PoleVault System installation and wiring overviewRoom Typical classroom installationPoleVault Systems Installation Introduction Planning Room layoutADA overhead and side clearance requirements Example classroom installationIntroduction Planning, cont’d Location of the screen and projectorCabling obstacles Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Location of source devicesIntroduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, cont’d Optional installation hardware Introduction Inventory Overview, cont’dItems not included Installation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation Slotted Pipe Supplied with PCM Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage PCM 340 Projector Drop Ceiling Mount1a Mark the screen location Installation Stage One, cont’dInstall projector to verify location Mark screen locationHorizontal offset 2f Slide and lock the projector onto the adjuster plateVerify the image location 2e Attach the bracket to the projector4b Take measurements with the PCM 340 on the T-frame Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation Cut the ceiling tile7c Hand tighten the turnbuckles Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7a Attach turnbuckles at the cornersInstall the electrical box if required Install the Screen8a Install Raco box and plaster ring Stage Two Install the Wall Plates and MLC 104 IP Plus This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller RS-232 or to an IR emitter Installation Stage Two, cont’dCables IR/RS-232 communications cable control cable1c Insert the mud ring Install the mud rings1d Features for mud ring installation MLC 104 IP Plus mud ringSignal Cable Label color Pull the cables at the input locations2c Pull the cables at each location MLC 104 IP Plus controller Install wall platesInstall MediaLink Controller Wire stripping lengths4a Connecting the MLC to the switcher Appropriate 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with An RS-232 cable or IR emitter cable, as4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusFF 120 Flat Field Ceiling Speakers Stage Three Install the FF 120 Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’dInstall the speaker on the drop ceiling 2h Attach safety cableTo terminate the cable, strip the end of the cable 0.2 inch Terminate the speaker cable for the PVS switcherPole captive screw connector Stereo or dual mono output using parallel speaker wiringPMK 550 Pole Mount Kit Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PVS 305SA PoleVault SwitcherPoleVault Systems Installation Installation Stage 4 Install the PMK 550 base plate2b Gather the cables, pass them down the pipe Installation Stage Four, cont’dPull the cables at the switcher location Switcher and projector cable overviewConnect the cables as follows to the PVS 305SA Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus 4a Connect the cables to the switcher4d Cable the projector 4b Reattach UPB bracket and 4c projectorStage Five Configure the Switcher and the System Configure the switcher MLS Switcher Configuration programGlobal configurator software Configure the system Global Configurator Installation Stage Five, cont’dLoosen all pivot screws and adjust the vertical angle 3c Check that an image is present, adjust as neededTest the system 3d Test the MLC configuration Final installationAdjust the configuration as necessary Where installed, if necessary, adjust the sensitivityPlug VoiceLift cable into PVS 305SA Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Attach the Z bracket to the ceiling tile and the back plateUL-compliant junction box and cover Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor Priority Page Sensor Kit included partsTesting and Adjustment Procedure Typical paging system with the PVS 305SA switcher4 Sensitivity knob adjustment Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateExtron PCM Reference Information, cont’dPoleVault Systems Installation Basic SIS Commands SIS CommandsPVS 305SA specific symbol definitions SIS Command/Response Table Ascii TelnetExtron USA West