Extron electronic PVS 305SA manual Final installation, Adjust the configuration as necessary

Page 38

Installation — Stage Five, cont’d

d.Test the controller’s configuration with the following:

Check that the MLC is controlling the PVS 305SA switcher and projector, and output’s the correct image when switching inputs.

Check the projector’s power control (turn it off and on at the MLC controller).

Adjust the configuration as necessary.

e.Adjust the audio input sensitivity as follows:

Ensure there is an audio source at each transmitter.

Set the MLC controller’s volume to maximum.

On the PVS 305SA switcher, set the volume for each input by selecting an input and rotating the Volume encoder to a comfortable maximum level, i.e., where the input “normal” LED flashes, indicating the level is set properly. This ensures there is no clipping if the MLC volume is turned to maximum during operation.

Repeat step e for all inputs.

f.Where installed, to adjust the microphone sensitivity switch on the microphone, press and hold the volume down button until no beeps are heard from the speakers. Then press and hold the volume up button until six beeps are heard. To adjust the VoiceLift audio output level rotate the VoiceLift encoder on the PVS 305SA switcher to the “normal” setting and the LED lights. Test and adjust the microphone so that the amplified voice is heard just above the normal voice level at each speaker location. Refer to the VoiceLift Users Manual for details.

NThe MLC volume control does not control the VoiceLift volume.

By default the switcher has been configured properly where the input level adjustment and VoiceLift input adjustment may not be required.

g.Where installed, if necessary, adjust the sensitivity of the

Priority Paging system. During a test transmission of the Paging system rotate the Paging Sensor encoder until program audio is no longer heard from the PoleVault speakers. Refer to the Priority Page Sensor Installation Instructions for full details.

NThe Paging Sensor feature must be enabled using the MLS Configuration software or SIS commands prior to adjustment.

4.Final installation

a.Slide the covers of the PMK 550 onto the base plate, ensuring the power cable can exit the unit through the power cable access slot.

b.Using a 5/32 inch hex wrench, tighten down the four screws on the PMK 550 to secure the sides in place.

c.Check and tighten the adjuster plate locking screws on the projector bracket.

d.Hole plugs can be used to cover any exposed holes in the slotted pipe if necessary.

3d Test the MLC configuration

 

 

 

PVS 305SA

 

Level set too high,

 

 

POLEVAULT SWITCHER

PEAK

lower input gain

AUDIO LEVEL ADJUST

 

 

Level has been

INPUT PEAK

MIC

PEAK

PAGING

NORMAL

SENSOR

properly adjusted

NORMAL

 

NORMAL

 

 

 

 

 

SIGNAL

VOICELIFT

SIGNAL

SENSITIVITY

SIGNAL

Signal threshold

 

 

 

 

 

-20 dBV (-18 dBu)

3e Adjusting audio levels on the PVS 305SA

4a Slide the covers onto the PMK 550

2-27 PoleVault Systems Installation • Installation — Stage 5

Image 38
Contents Installation Guide PoleVault SystemsConsignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschFCC Class B Notice PoleVault Systems Installation IntroductionIntroduction PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsLocation of source devices Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Cabling obstaclesIncluded items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, cont’d Items not included Optional installation hardwareIntroduction Inventory Overview, cont’d Installation tools PoleVault Systems Installation Installation Installation OverviewOutline of installation steps PCM 340 Projector Drop Ceiling Mount Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage Slotted Pipe Supplied with PCMMark screen location Installation Stage One, cont’dInstall projector to verify location 1a Mark the screen location2e Attach the bracket to the projector 2f Slide and lock the projector onto the adjuster plateVerify the image location Horizontal offsetCut the ceiling tile Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation 4b Take measurements with the PCM 340 on the T-frame7a Attach turnbuckles at the corners Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7c Hand tighten the turnbuckles8a Install Raco box and plaster ring Install the electrical box if requiredInstall the Screen MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IP PlusThis stage involves installing the devices shown below IR/RS-232 communications cable control cable Installation Stage Two, cont’dCables RS-232 or to an IR emitterMLC 104 IP Plus mud ring Install the mud rings1d Features for mud ring installation 1c Insert the mud ring2c Pull the cables at each location Signal Cable Label colorPull the cables at the input locations Install wall plates MLC 104 IP Plus controller4a Connecting the MLC to the switcher Install MediaLink ControllerWire stripping lengths An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling Speakers2h Attach safety cable Installation Stage Three, cont’dInstall the speaker on the drop ceiling Cut ceiling tileStereo or dual mono output using parallel speaker wiring Terminate the speaker cable for the PVS switcherPole captive screw connector To terminate the cable, strip the end of the cable 0.2 inchPVS 305SA PoleVault Switcher Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Switcher and projector cable overview Installation Stage Four, cont’dPull the cables at the switcher location 2b Gather the cables, pass them down the pipe4a Connect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorGlobal configurator software Stage Five Configure the Switcher and the SystemConfigure the switcher MLS Switcher Configuration program Installation Stage Five, cont’d Configure the system Global ConfiguratorTest the system Loosen all pivot screws and adjust the vertical angle3c Check that an image is present, adjust as needed Where installed, if necessary, adjust the sensitivity Final installationAdjust the configuration as necessary 3d Test the MLC configurationAttach the Z bracket to the ceiling tile and the back plate Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Plug VoiceLift cable into PVS 305SAPriority Page Sensor Kit included parts Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor UL-compliant junction box and cover4 Sensitivity knob adjustment Testing and Adjustment ProcedureTypical paging system with the PVS 305SA switcher PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Command/Response Table Ascii Telnet SIS CommandsPVS 305SA specific symbol definitions PoleVault Systems Installation Basic SIS CommandsExtron USA West