Extron electronic Stage Four Install the PMK 550 and the PVS 305SA, PMK 550 Pole Mount Kit

Page 30

Stage Four — Install the PMK 550 and the PVS 305SA

Stage 4

This stage covers installing the devices shown below.

PMK 550 Pole Mount Kit

Base Plate

To open, remove 4 cover screws (10-32, button head, hex) and slide the covers away.

PMK Covers (2)

Where it goes: Attaches to slotted pipe, above the projector and close to the drop ceiling.

What it does: Supports and hides the installed PVS 305SA switcher, power supply, and any installed optional

accessories.

PVS 305SA PoleVault Switcher

Power Supply and Cable

PVT RGB

D Plus Inputs

VoiceLift

Lineout

Speaker

 

(1-4,

A and B)

Receiver Port

Output

Output

 

 

 

 

 

 

 

 

 

 

 

RG

B

 

 

 

 

 

 

 

 

 

 

4A

 

 

 

 

 

 

 

 

 

 

RG

B

 

 

 

 

 

 

 

 

 

 

3A

 

 

 

 

 

 

 

 

 

 

RG

B

 

 

 

 

 

 

 

 

 

 

2A

 

 

 

 

 

 

 

 

 

 

RG

B

 

 

 

 

 

 

 

 

 

 

1A

 

 

 

 

 

 

 

 

 

 

N15779

 

 

 

 

 

 

 

 

 

 

RG

B

 

 

 

 

 

 

 

 

 

 

4B

 

 

I

 

 

 

 

 

 

 

B

/VIDEO

 

N

 

 

 

 

 

3B

RG

 

 

 

 

 

P

 

 

 

RGB

/VIDEO

 

 

 

POWER

U

 

 

B

 

 

 

 

 

 

S

 

 

 

 

 

 

 

 

 

 

 

T

 

 

2B

 

 

 

 

 

 

 

 

 

 

1B

RG

 

 

 

 

 

 

 

 

 

12VMAX

 

 

 

 

 

 

 

 

 

 

 

 

5A

 

 

 

 

 

 

 

 

 

 

 

 

 

17TTDIO/VIDEOS

 

AU

RATU

US

APPA

 

 

VOICELIFT

LISTED

RECEIVER

VIDEO

OUTPUTS

RGB

OUT LINE

R

LR

L

AUX

AUDIO

5

INPUT

 

 

 

 

OUT

 

 

 

AU

DIO

2/4/8

 

 

 

 

 

 

 

 

 

Ohms

DO

NOT

 

 

R

ROL12V

GROUND

 

 

 

OR SHORT

 

L

CONTIR

SPEAKER

 

50mA

Tx Rx

 

OUTPUTS2 WIRING

 

MLC/IR

CLASS10V

 

 

RS-232

 

 

 

 

 

PAGING

VO

L/MUTE

 

 

 

 

 

SENSOR

 

 

 

 

N15779

1A1ARGBRGB 2A2ARGB 3A RGB 4A4ARGBRGB

I

POWER N

P

U

T

S

12V

1B RGB

2B2BRGB

3B RGB

4BRGB

5A MAX

 

 

3/VIDEOVIDEO

4/VIDEO

Power Supply

Connector PVT CV D Inputs

(3 and 4)

Rear View

 

 

 

17TT

 

LINE OUT

AMPLIFIED AUDIO OUT

 

 

 

US

 

 

DO NOT

 

 

 

 

®

AUDIO/VIDEO

 

 

GROUND

 

 

 

 

LISTED

 

APPARATUS

 

 

OR SHORT

 

 

2/4/8

 

 

 

 

 

 

SPEAKER

 

 

Ohms

 

OUTPUTS

 

VOICELIFT

L

R

OUTPUTS

 

 

 

 

 

RECEIVER

CLASS 2 WIRING

L

R

 

RGB

VIDEO

 

 

 

 

L

R

10V

50mA

CONTROL

 

 

 

 

 

 

 

 

 

 

 

 

Tx Rx IR

12V

 

 

 

 

 

 

 

 

AUX AUDIO

PAGING

RS-232 MLC/IR

INPUT 5

SENSOR VOL/MUTE

 

 

 

RGB

Video

Aux Audio

MLC Control

Output

Output

Input

Port

Paging Sensor

Volume/Mute

Port

Control Port

Where it goes: PVS 305SA and power supply installs onto the base plate of the PMK 550.

What it does: Receives input video and audio signals from A/V source input wall plates. Outputs and switches the signals to projector and ceiling speakers.

Cables

VGA cable (connects to RGB output and projector)

MVGA M-M, 3 ft.

 

RCA cable (connects to video output and projector)

V RCA, 3 ft.

2-19 PoleVault Systems Installation • Installation — Stage 4

Image 30
Contents Installation Guide PoleVault SystemsConsignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschPoleVault Systems Installation Introduction IntroductionFCC Class B Notice PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsLocation of source devices Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Cabling obstaclesIntroduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, cont’d Optional installation hardware Introduction Inventory Overview, cont’dItems not included Installation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation PCM 340 Projector Drop Ceiling Mount Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage Slotted Pipe Supplied with PCMMark screen location Installation Stage One, cont’dInstall projector to verify location 1a Mark the screen location2e Attach the bracket to the projector 2f Slide and lock the projector onto the adjuster plateVerify the image location Horizontal offsetCut the ceiling tile Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation 4b Take measurements with the PCM 340 on the T-frame7a Attach turnbuckles at the corners Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7c Hand tighten the turnbucklesInstall the electrical box if required Install the Screen8a Install Raco box and plaster ring Stage Two Install the Wall Plates and MLC 104 IP Plus This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller IR/RS-232 communications cable control cable Installation Stage Two, cont’dCables RS-232 or to an IR emitterMLC 104 IP Plus mud ring Install the mud rings1d Features for mud ring installation 1c Insert the mud ringSignal Cable Label color Pull the cables at the input locations2c Pull the cables at each location Install wall plates MLC 104 IP Plus controllerInstall MediaLink Controller Wire stripping lengths4a Connecting the MLC to the switcher An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ring Stage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling Speakers2h Attach safety cable Installation Stage Three, cont’dInstall the speaker on the drop ceiling Cut ceiling tileStereo or dual mono output using parallel speaker wiring Terminate the speaker cable for the PVS switcherPole captive screw connector To terminate the cable, strip the end of the cable 0.2 inchPVS 305SA PoleVault Switcher Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Switcher and projector cable overview Installation Stage Four, cont’dPull the cables at the switcher location 2b Gather the cables, pass them down the pipe4a Connect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorStage Five Configure the Switcher and the System Configure the switcher MLS Switcher Configuration programGlobal configurator software Installation Stage Five, cont’d Configure the system Global ConfiguratorLoosen all pivot screws and adjust the vertical angle 3c Check that an image is present, adjust as neededTest the system Where installed, if necessary, adjust the sensitivity Final installationAdjust the configuration as necessary 3d Test the MLC configurationAttach the Z bracket to the ceiling tile and the back plate Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Plug VoiceLift cable into PVS 305SAPriority Page Sensor Kit included parts Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor UL-compliant junction box and coverTesting and Adjustment Procedure Typical paging system with the PVS 305SA switcher4 Sensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Command/Response Table Ascii Telnet SIS CommandsPVS 305SA specific symbol definitions PoleVault Systems Installation Basic SIS CommandsExtron USA West