c.Location of MediaLink® Controller and Wall Plates

Forward and side reach (for full details refer to a copy of "ADA Standards for Accessible Design", "Section 4-2", "Space Allowance and Reach Ranges")

48"

(122 cm)

Max

54"

(137 cm)

Max

15" (38 cm)

Min

10"

(25.5 cm) Max

9"

(23 cm)

Min

30"

(76 cm)

 

24"

30"

 

(61 cm)

(76 cm)

46"

 

 

(117 cm)

34"

 

Max

 

(86.5 cm)

 

 

 

High Forward Reach Limits (ADA referenced figure 5a, redrawn)

High / Low Side Reach Limits

Max Side Reach over Obstruction Limits

(ADA referenced figure 6b, redrawn)

(ADA referenced figure 6c, redrawn)

ADA high/low forward, side and over obstruction reach limit requirements

Location of source devices

Desk, table, or rack mounted, and proximity to proposed transmitter location (wall, podium, or furniture)

Cabling obstacles

Studs, utility pipes, power supply location (raceway installation needed?)

Network drop for MediaLink Controller

Wall or floor cabled

d. Type and location of the speakers

Speaker type based on room ceiling and wall type

Total number and spacing of speakers

Based on ceiling height and room size

Audience seating and room acoustics

Desired spread and evenness of sound coverage and ambient noise level compensation

Windows

TV / VCR / DVD Inputs

Student Desks

Each speaker covers one-fourth of listening area.

Speaker

Location

Projector/Switcher

Location

MLC Controller

Location

Teacher’s

Desk

PVT A/V Wallplate

Screen/White board

Location

Location

Example classroom with four speaker installation

PoleVault Systems Installation • Introduction — Planning

1-5

Image 7
Contents PoleVault Systems Installation GuideSicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisIntroduction PoleVault Systems Installation IntroductionFCC Class B Notice Introduction, contd PoleVault System installation and wiring overviewRoom Typical classroom installationPoleVault Systems Installation Introduction Planning Room layoutADA overhead and side clearance requirements Example classroom installationIntroduction Planning, cont’d Location of the screen and projectorCabling obstacles Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Location of source devicesInventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d Introduction Inventory Overview, cont’d Optional installation hardwareItems not included Installation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation Slotted Pipe Supplied with PCM Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage PCM 340 Projector Drop Ceiling Mount1a Mark the screen location Installation Stage One, cont’dInstall projector to verify location Mark screen locationHorizontal offset 2f Slide and lock the projector onto the adjuster plateVerify the image location 2e Attach the bracket to the projector4b Take measurements with the PCM 340 on the T-frame Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation Cut the ceiling tile7c Hand tighten the turnbuckles Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7a Attach turnbuckles at the cornersInstall the Screen Install the electrical box if required8a Install Raco box and plaster ring This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IP PlusMLC 104 IP Plus MediaLink Controller RS-232 or to an IR emitter Installation Stage Two, cont’dCables IR/RS-232 communications cable control cable1c Insert the mud ring Install the mud rings1d Features for mud ring installation MLC 104 IP Plus mud ringPull the cables at the input locations Signal Cable Label color2c Pull the cables at each location MLC 104 IP Plus controller Install wall platesWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher Appropriate 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with An RS-232 cable or IR emitter cable, as4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusFF 120 Flat Field Ceiling Speakers Stage Three Install the FF 120 Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’dInstall the speaker on the drop ceiling 2h Attach safety cableTo terminate the cable, strip the end of the cable 0.2 inch Terminate the speaker cable for the PVS switcherPole captive screw connector Stereo or dual mono output using parallel speaker wiringPMK 550 Pole Mount Kit Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PVS 305SA PoleVault SwitcherPoleVault Systems Installation Installation Stage 4 Install the PMK 550 base plate2b Gather the cables, pass them down the pipe Installation Stage Four, cont’dPull the cables at the switcher location Switcher and projector cable overviewConnect the cables as follows to the PVS 305SA Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus 4a Connect the cables to the switcher4d Cable the projector 4b Reattach UPB bracket and 4c projectorConfigure the switcher MLS Switcher Configuration program Stage Five Configure the Switcher and the SystemGlobal configurator software Configure the system Global Configurator Installation Stage Five, cont’d3c Check that an image is present, adjust as needed Loosen all pivot screws and adjust the vertical angleTest the system 3d Test the MLC configuration Final installationAdjust the configuration as necessary Where installed, if necessary, adjust the sensitivityPlug VoiceLift cable into PVS 305SA Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Attach the Z bracket to the ceiling tile and the back plateUL-compliant junction box and cover Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor Priority Page Sensor Kit included partsTypical paging system with the PVS 305SA switcher Testing and Adjustment Procedure4 Sensitivity knob adjustment Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateExtron PCM Reference Information, cont’dPoleVault Systems Installation Basic SIS Commands SIS CommandsPVS 305SA specific symbol definitions SIS Command/Response Table Ascii TelnetExtron USA West