Extron electronic PVS 305SA manual Install wall plates, MLC 104 IP Plus controller

Page 23

3.Install wall plates

a.Connect the CAT 5 cables to the rear of the input devices

(for RGB devices, connect cable labeled A to port A and cable B to port B).

b.If desired, for PVT RGB D Plus plates, use a three conductor audio cable and connect the audio return to the connector marked G (ground wire), R (black wire), and L (red wire). The other end will be connected to the

“Line Out” connection on the PVS 305SA switcher.

c.If desired wire the IR connection using a two conductor cable. Wire the ground to G and signal lead to S. The other end will be connected to the “IR Out” port of the

MLC 104 IP Plus controller.

d.Mount each device into the mud ring, using the supplied screws.

e.Attach the supplied Decora faceplate.

f.Label the Decora plate with the supplied label, using the appropriate input number. This makes inputs easier to identify when configuring the switcher.

g.Repeat steps a-ffor other wall plates.

3a Connect the cables to the A/V source input devices at each location.

Wall

Wall Mounting

Bracket (mud ring)

Decora®

Faceplate

AUDIOOUT

IN

IN

 

COMPUTER

 

OUT

MONITOR

S

G

 

IR OUT

 

Extron

PVT RGB D Plus

3b Mount the PVT in the mud ring, then 3c attach the Decora faceplate.

PoleVault Systems Installation • Installation — Stage 2

2-12

Image 23
Contents PoleVault Systems Installation GuideSicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisFCC Class B Notice PoleVault Systems Installation IntroductionIntroduction Introduction, contd PoleVault System installation and wiring overviewRoom Typical classroom installationPoleVault Systems Installation Introduction Planning Room layoutADA overhead and side clearance requirements Example classroom installationIntroduction Planning, cont’d Location of the screen and projectorCabling obstacles Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Location of source devicesIncluded items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, cont’d Items not included Optional installation hardwareIntroduction Inventory Overview, cont’d Installation tools PoleVault Systems Installation Installation Installation OverviewOutline of installation steps Slotted Pipe Supplied with PCM Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage PCM 340 Projector Drop Ceiling Mount1a Mark the screen location Installation Stage One, cont’dInstall projector to verify location Mark screen locationHorizontal offset 2f Slide and lock the projector onto the adjuster plateVerify the image location 2e Attach the bracket to the projector4b Take measurements with the PCM 340 on the T-frame Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation Cut the ceiling tile7c Hand tighten the turnbuckles Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7a Attach turnbuckles at the corners8a Install Raco box and plaster ring Install the electrical box if requiredInstall the Screen MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IP PlusThis stage involves installing the devices shown below RS-232 or to an IR emitter Installation Stage Two, cont’d Cables IR/RS-232 communications cable control cable1c Insert the mud ring Install the mud rings1d Features for mud ring installation MLC 104 IP Plus mud ring2c Pull the cables at each location Signal Cable Label colorPull the cables at the input locations MLC 104 IP Plus controller Install wall plates4a Connecting the MLC to the switcher Install MediaLink ControllerWire stripping lengths Appropriate 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with An RS-232 cable or IR emitter cable, as4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusFF 120 Flat Field Ceiling Speakers Stage Three Install the FF 120 Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’dInstall the speaker on the drop ceiling 2h Attach safety cableTo terminate the cable, strip the end of the cable 0.2 inch Terminate the speaker cable for the PVS switcherPole captive screw connector Stereo or dual mono output using parallel speaker wiringPMK 550 Pole Mount Kit Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PVS 305SA PoleVault SwitcherPoleVault Systems Installation Installation Stage 4 Install the PMK 550 base plate2b Gather the cables, pass them down the pipe Installation Stage Four, cont’dPull the cables at the switcher location Switcher and projector cable overviewConnect the cables as follows to the PVS 305SA Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus 4a Connect the cables to the switcher4d Cable the projector 4b Reattach UPB bracket and 4c projectorGlobal configurator software Stage Five Configure the Switcher and the SystemConfigure the switcher MLS Switcher Configuration program Configure the system Global Configurator Installation Stage Five, cont’dTest the system Loosen all pivot screws and adjust the vertical angle3c Check that an image is present, adjust as needed 3d Test the MLC configuration Final installationAdjust the configuration as necessary Where installed, if necessary, adjust the sensitivityPlug VoiceLift cable into PVS 305SA Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Attach the Z bracket to the ceiling tile and the back plateUL-compliant junction box and cover Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor Priority Page Sensor Kit included parts4 Sensitivity knob adjustment Testing and Adjustment ProcedureTypical paging system with the PVS 305SA switcher Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateExtron PCM Reference Information, cont’dPoleVault Systems Installation Basic SIS Commands SIS CommandsPVS 305SA specific symbol definitions SIS Command/Response Table Ascii TelnetExtron USA West