Extron electronic PVS 305SA manual Finish Projector Drop Ceiling Mount installation

Page 17

6.Finish Projector Drop Ceiling Mount installation

a.Detach the projector bracket/projector from the adjuster plate. Do not remove the projector bracket from the projector.

b.Unscrew the UPB 25 adapter plate from the mounting pole.

c.Loosen the set screws on the PCM 340 and the pipe location screw and remove the mounting pole, then loosen the T-frame securing screws and remove the

PCM 340 from its marked location.

d.Replace the cut ceiling tile, checking its orientation to align the hole with the PCM 340.

e.Replace the PCM 340 over the ceiling tile, slide the slotted pipe up through the tile and into the adapter plate. Realign the location holes with the pipe holes, insert and tighten down the location screw. Tighten the set screws.

f.Tighten the four T-frame securing screws on the

PCM 340. The T-frame securing screws can be used on either side of the frame.

6e Slide the pipe through the ceiling tile and into the pipe adapter plate

7.Secure the Projector Drop Ceiling Mount to the ceiling

a.Attach the four turnbuckles to the mounting plate, one at each corner.

CDO NOT rest or lean on the mounting plate or suspended ceiling when attaching turnbuckles, tie wire, or when drilling into the ceiling

NFor safest installation, insert the turnbuckle from the outside so that it hooks inwards.

b.Cut four equal lengths of the supplied hanging wire, and loop the wire through the anchors or lag eye bolts, and the turnbuckles, then twist the wire around itself at least five times tightly at each end.

c.Hand tighten the turnbuckles and level the plate so it just rests on the T-frame.

CThe four hanging wires should be taut, taking the full weight of the completed installation.

Do not overtighten the turnbuckles or the T‑frame assembly could be lifted, making the suspended ceiling bowed and unsafe.

d.Pass the braided safety cable through the fifth and center anchor and attach it to the center holes on either side

of the plate. Ensure the cable is of equal length on both sides of the anchor and secure the cable using the cable clamps.

7a Attach turnbuckles at the corners

Secure PCM to frame (from either side)

PCM

T-frame

Adjust the turnbuckles to take up any slack in the hanging wire.

7c Hand tighten the turnbuckles

PoleVault Systems Installation • Installation — Stage 1

2-6

Image 17
Contents PoleVault Systems Installation GuideSafety Instructions English PrecautionsConsignes de Sécurité Français Sicherheitsanleitungen DeutschFCC Class B Notice PoleVault Systems Installation IntroductionIntroduction Introduction, contd PoleVault System installation and wiring overviewPoleVault Systems Installation Introduction Planning Typical classroom installationRoom layout RoomIntroduction Planning, cont’d Example classroom installationLocation of the screen and projector ADA overhead and side clearance requirementsLocation of MediaLink Controller and Wall Plates Example classroom with four speaker installationLocation of source devices Cabling obstaclesIncluded items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, cont’d Items not included Optional installation hardwareIntroduction Inventory Overview, cont’d Installation tools PoleVault Systems Installation Installation Installation OverviewOutline of installation steps PoleVault Systems Installation Installation Stage Stage One Install the Screen and ProjectorPCM 340 Projector Drop Ceiling Mount Slotted Pipe Supplied with PCMInstall projector to verify location Installation Stage One, cont’dMark screen location 1a Mark the screen locationVerify the image location 2f Slide and lock the projector onto the adjuster plate2e Attach the bracket to the projector Horizontal offset5a Mark structural ceiling for lag eye bolt installation Preliminary safety hardware installationCut the ceiling tile 4b Take measurements with the PCM 340 on the T-frameSecure the Projector Drop Ceiling Mount to the ceiling Finish Projector Drop Ceiling Mount installation7a Attach turnbuckles at the corners 7c Hand tighten the turnbuckles8a Install Raco box and plaster ring Install the electrical box if requiredInstall the Screen MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IP PlusThis stage involves installing the devices shown below Cables Installation Stage Two, cont’dIR/RS-232 communications cable control cable RS-232 or to an IR emitter1d Features for mud ring installation Install the mud ringsMLC 104 IP Plus mud ring 1c Insert the mud ring2c Pull the cables at each location Signal Cable Label colorPull the cables at the input locations MLC 104 IP Plus controller Install wall plates4a Connecting the MLC to the switcher Install MediaLink ControllerWire stripping lengths Connect the MLC to the projector with 4c Connect to the LAN using a CAT 5 cableAn RS-232 cable or IR emitter cable, as Appropriate4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusFF 120 Flat Field Ceiling Speakers Stage Three Install the FF 120 Ceiling SpeakersInstall the speaker on the drop ceiling Installation Stage Three, cont’d2h Attach safety cable Cut ceiling tilePole captive screw connector Terminate the speaker cable for the PVS switcherStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable 0.2 inchThis stage covers installing the devices shown below Stage Four Install the PMK 550 and the PVS 305SAPVS 305SA PoleVault Switcher PMK 550 Pole Mount KitPoleVault Systems Installation Installation Stage 4 Install the PMK 550 base platePull the cables at the switcher location Installation Stage Four, cont’dSwitcher and projector cable overview 2b Gather the cables, pass them down the pipeBControl/power cable from the MLC 104 IP Plus Finish installing the Pole Mount kit4a Connect the cables to the switcher Connect the cables as follows to the PVS 305SA4d Cable the projector 4b Reattach UPB bracket and 4c projectorGlobal configurator software Stage Five Configure the Switcher and the SystemConfigure the switcher MLS Switcher Configuration program Configure the system Global Configurator Installation Stage Five, cont’dTest the system Loosen all pivot screws and adjust the vertical angle3c Check that an image is present, adjust as needed Adjust the configuration as necessary Final installationWhere installed, if necessary, adjust the sensitivity 3d Test the MLC configurationAlign the arrows on the housing rim and the dome tab Optional Accessory Installation VoiceLift SystemAttach the Z bracket to the ceiling tile and the back plate Plug VoiceLift cable into PVS 305SAOpen the sensor and loop a wire around the sensor Optional Accessory Installation Priority Page Sensor KitPriority Page Sensor Kit included parts UL-compliant junction box and cover4 Sensitivity knob adjustment Testing and Adjustment ProcedureTypical paging system with the PVS 305SA switcher Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateExtron PCM Reference Information, cont’dPVS 305SA specific symbol definitions SIS CommandsSIS Command/Response Table Ascii Telnet PoleVault Systems Installation Basic SIS CommandsExtron USA West