Liebert XDP European Union Fluorinated Greenhouse Gas Requirements, Connection Sizes, Piping

Page 17

Piping

2.0PIPING

2.1European Union Fluorinated Greenhouse Gas Requirements

Stationary air conditioning, refrigeration, heat pump equipments and stationary fire protection sys- tems in the European Community market and operating with fluorinated greenhouse gases (f-gas), such as R407C, R134a, R410A, must comply with the F-Gas Regulation: (EC) No. 842/2006 (F-gas). The regulation prohibits, among other actions, venting fluorinated greenhouse gases to the atmo- sphere.

The F-Gas Regulation requires operators to use use all measures that are technically feasible and do not entail disproportionate cost to prevent leakage of these gases, to test for leakage regularly and to recover f-gas before disposing of equipment, as well as during service and maintenance.

Refer to the full regulation for additional details.

2.2Connection Sizes

The copper pipe connections on the Liebert XDP are:

Building Chilled Water Supply

2-5/8" OD

Building Chilled Water Return

2-5/8" OD

Refrigerant Supply

1-1/8" OD

Refrigerant Return

2-1/8" OD

2.2.1Recommended Pipe Size

Connect the main pipes between the Liebert XDP and the Liebert XD cooling modules according to site specific documentation and the configuration guide for the Liebert XD system.

Elbows and restrictions must be minimized to get good fluid flow.

Table 3 Supply, return pipe sizes for refrigerant loop

Pipe Function

Size / Equivalent Pipe Length

Liebert XDP supply line, from Liebert XDP supply

1-1/8" OD for lengths up to 60 feet

to farthest Liebert XD cooling module

1-3/8" OD for lengths over 60 but less than 175 feet

Liebert XDP return line, from farthest Liebert XD cooling

2-1/8" OD for lengths up to 60 feet

module to Liebert XDP return

2-5/8" OD for lengths over 60 but less than 175 feet

From any model Liebert XDO/Liebert XDH supply

1/2" OD for lengths up to 10 feet

to supply line of Liebert XDP

7/8" OD for lengths over 10 but less than 25 feet

From any model Liebert XDO/Liebert XDH return

7/8" OD for lengths up to 10 feet

to return line of Liebert XDP

1-1/8" OD for lengths over 10 but less than 25 feet

From any model Liebert XDV/Liebert XDCF supply

1/2" OD for lengths up to 10 feet

to supply line of Liebert XDP

5/8" OD for lengths over 10 but less than 35 feet

From any model Liebert XDV/Liebert XDCF return

5/8" OD for lengths up to 10 feet

to return line of Liebert XDP

7/8" OD for lengths over 10 but less than 35 feet

11

Image 17
Contents Liebert XDP Example XDP160A General Safety GuidelinesFluorinated Greenhouse Gas Requirements-European Union Pumping Place holder Revision Unit Redundancy Level LiebertTable of Contents Specifications Alarm Descriptions and SolutionsFigures Page Equipment Inspection General Product InformationProduct Description Product/System DescriptionRemoval from Skid Equipment HandlingHandling With Skid Liebert XDP strapped to piano jack Removing pallet boards for piano jack insertionSlide this runner away From the Liebert XDP Removing Piano JacksPositioning the Liebert XDP Liebert XDP dimensionsMechanical Considerations Model Pipe Connection Point 50/60 Hz Unit piping outlet connection sizes, inches, OD CuElectrical Information High Voltage Connections Connecting High-Voltage CablesElectrical enclosure knockout locations for field wiring High voltage connections-50Hz Extra Low Voltage ELV ConnectionsField Connections-Optional for All Units Field Connections-All UnitsConnection Sizes European Union Fluorinated Greenhouse Gas RequirementsPiping Recommended Pipe SizeLiebert XDP Interconnection with Liebert XD Cooling Modules Piping Installation MethodBypass Flow Controller Bypass flow controllers for a Liebert XDP-based systemBypass flow controller arrangement Bypass flow controller details, dimensionsPiping Details-Shut-Off/Isolation Valves Piping Installation MethodPiping Mains Evacuation and Leak CheckChecklist for Proper Installation Indicator Lights Description Green Red Checklist for Liebert XDP StartupLiebert XDP pump light indicator-208V and 400V units System R-134a liquid level Filling the Pumped Circuit-R-134aReturn Line Diameter System refrigerant charge for the supply and return mainsReturn Line Diameter 5/8 Calculating refrigerant charge-example Calculating Refrigerant Charge-ExampleWorksheet to calculate refrigerant charge Total 293Microprocessor Control Feature OverviewDisplay User interface keypad functionsViewing or Changing Settings Feature OverviewControls Main MenuAlarm History Active AlarmsSetpoints MIN Temp SPRestart Time Delay Setup OperationDegrees Pump Start TDPump Wait TD Liebert XDP DIP switches and factory settingsPump OFF TD Lead PumpValve Time Password Security-SETPT Password and Service PasswordChange Password-SETPT Password Alarm Enable Change Password-SERVICE PasswordAlarm Time Delay COM Alarm EnableCustom Text Custom AlarmsDiagnostics Alarm Descriptions and Solutions Alarm DescriptionsEnable or Disable Alarms Red and Green Lamp IndicatorsAlter Alarm Settings System Shutdown Causes Troubleshooting the XDP TroubleshootingFluorinated Greenhouse Gas Requirements MaintenanceLiebert XDP160 specifications SpecificationsIti Ne tTi n That