Liebert XDP user manual Electrical enclosure knockout locations for field wiring

Page 14

Product Description

2.Determine which knockouts in the electrical enclosure will be used and remove them (see Figure 11).

Figure 11 Electrical enclosure knockout locations for field wiring

User Interface

(Wall Box) Wiring

Temperature/Humidity Sensor Wiring

Liebert XD Module Condensate Connections (optional; depends on features

supplied with Liebert XD Module)

Alternate Knockout

for Temperature/Humidity

Sensor Wiring

Enclosure Cover Not Shown for Clarity

3.Route the input hazardous voltage electrical power wiring through the top left knockout (see Figure 11) to the disconnect switch L1, L2 and L3 (see Figures 12 and 13). Observe proper phasing.

4.Connect the ground wire to the ground lug (see Figures 12 and 13), which is in the middle left of the enclosure.

Figure 12 High voltage connections—60Hz

Customer Power

 

Connection

 

Ground Lug

 

Disconnect Switch

Transformer 2

 

Pump Fuse

Power Block

Blocks

 

 

Control

 

Fuse Blocks

Pump Contactors

Transformer 1

 

 

8

Image 14
Contents Liebert XDP Fluorinated Greenhouse Gas Requirements-European Union General Safety GuidelinesExample XDP160A Pumping Place holder Revision Unit Redundancy Level LiebertTable of Contents Alarm Descriptions and Solutions SpecificationsFigures Page Product Description General Product InformationEquipment Inspection Product/System DescriptionRemoval from Skid Equipment HandlingHandling With Skid Removing pallet boards for piano jack insertion Liebert XDP strapped to piano jackRemoving Piano Jacks Slide this runner away From the Liebert XDPPositioning the Liebert XDP Liebert XDP dimensionsMechanical Considerations Unit piping outlet connection sizes, inches, OD Cu Model Pipe Connection Point 50/60 HzConnecting High-Voltage Cables Electrical Information High Voltage ConnectionsElectrical enclosure knockout locations for field wiring Extra Low Voltage ELV Connections High voltage connections-50HzField Connections-All Units Field Connections-Optional for All UnitsPiping European Union Fluorinated Greenhouse Gas RequirementsConnection Sizes Recommended Pipe SizeBypass Flow Controller Piping Installation MethodLiebert XDP Interconnection with Liebert XD Cooling Modules Bypass flow controllers for a Liebert XDP-based systemBypass flow controller details, dimensions Bypass flow controller arrangementPiping Mains Piping Installation MethodPiping Details-Shut-Off/Isolation Valves Evacuation and Leak CheckChecklist for Proper Installation Indicator Lights Description Green Red Checklist for Liebert XDP StartupLiebert XDP pump light indicator-208V and 400V units Filling the Pumped Circuit-R-134a System R-134a liquid levelReturn Line Diameter System refrigerant charge for the supply and return mainsReturn Line Diameter 5/8 Worksheet to calculate refrigerant charge Calculating Refrigerant Charge-ExampleCalculating refrigerant charge-example Total 293Display Feature OverviewMicroprocessor Control User interface keypad functionsControls Feature OverviewViewing or Changing Settings Main MenuSetpoints Active AlarmsAlarm History MIN Temp SPDegrees Setup OperationRestart Time Delay Pump Start TDPump OFF TD Liebert XDP DIP switches and factory settingsPump Wait TD Lead PumpValve Time Password Security-SETPT Password and Service PasswordChange Password-SETPT Password Alarm Time Delay Change Password-SERVICE PasswordAlarm Enable COM Alarm EnableCustom Text Custom AlarmsDiagnostics Alarm Descriptions Alarm Descriptions and SolutionsEnable or Disable Alarms Red and Green Lamp IndicatorsAlter Alarm Settings System Shutdown Causes Troubleshooting Troubleshooting the XDPMaintenance Fluorinated Greenhouse Gas RequirementsSpecifications Liebert XDP160 specificationsTi n Ne tIti That