Liebert XDP user manual Filling the Pumped Circuit-R-134a, System R-134a liquid level

Page 23

Checklist for Liebert XDP Startup

If there is no “Loss of Flow” alarm present—This suggests that there is flow. Test the pressure differential by closing the ball valve on either the suction line or discharge line to stop the flow.

This should prompt an alarm for “loss of flow on P1.” This alarm confirms that the switch has opened on low pressure (below 6 psi; 41kPa; 0.41 bars).

If there is a “Loss of Flow” alarm present—This suggests that there is no flow. Verify that this is correctly annunciated by looking at the sight glass in the receiver. If a true no-flow condition exists, the level will not move.

However, if there is flow, but the differential reading is faulty, the level will slowly drop, indicating flow, while the loss of flow alarm is annunciated.

Check the pressure differential physically by making sure that the electrical connections are properly connected. Then check the pressure differential electrically by making sure that the unit has 24VAC across it.

Figure 21 System R-134a liquid level

Operation above sight glass#3 can make the system operate erratically and reduce cooling capacity- Reduce charge to recommended level.

Recommended operating level

Acceptable operating level

Operation below sight glass#1 may cause loss of flow or cooling. Add charge to reach recommended level.

For lightly loaded systems, the recommended operating level is sight glass#2.

Sight Glasses 1, 2 & 3

3.1Filling the Pumped Circuit—R-134a

1.Connect a charging manifold to the service port of the receiver outlet valve.

2.Purge the hoses.

3.Calculate the amount of R-134a refrigerant needed to charge the system, using the values in Tables 6, 7, 8 and 9; for assistance, refer to 3.1.1 - Calculating Refrigerant Charge— Example. The section includes a worksheet to calculate system refrigerant charge requirements.

4.Weigh in the calculated charge.

5.After adding the calculated charge, allow the system to sit 15 to 30 minutes to reach equilibrium. Observe the refrigerant level through the sight glasses of the receiver. The level should be above the second sight glass at a minimum when the Liebert XDP is off.

6.If the refrigerant level is improper, the charge must be adjusted.

If the level is too high or too low, recalculate the required charge and reduce or increase the amount as needed to reach the proper level.

NOTE

All lengths in Tables 7, 8 and 9 are actual pipe lengths, not equivalent pipe lengths.

NOTE

System refrigerant volume calculations derived from Tables 6, 7, 8 and 9 are based on a fully loaded system. Additional charge may be required for lightly loaded systems.

17

Image 23
Contents Liebert XDP Pumping Place holder Revision Unit Redundancy Level Liebert General Safety GuidelinesExample XDP160A Fluorinated Greenhouse Gas Requirements-European UnionTable of Contents Specifications Alarm Descriptions and SolutionsFigures Page Product/System Description General Product InformationEquipment Inspection Product DescriptionRemoval from Skid Equipment HandlingHandling With Skid Liebert XDP strapped to piano jack Removing pallet boards for piano jack insertionSlide this runner away From the Liebert XDP Removing Piano JacksPositioning the Liebert XDP Liebert XDP dimensionsMechanical Considerations Model Pipe Connection Point 50/60 Hz Unit piping outlet connection sizes, inches, OD CuElectrical Information High Voltage Connections Connecting High-Voltage CablesElectrical enclosure knockout locations for field wiring High voltage connections-50Hz Extra Low Voltage ELV ConnectionsField Connections-Optional for All Units Field Connections-All UnitsRecommended Pipe Size European Union Fluorinated Greenhouse Gas RequirementsConnection Sizes PipingBypass flow controllers for a Liebert XDP-based system Piping Installation MethodLiebert XDP Interconnection with Liebert XD Cooling Modules Bypass Flow ControllerBypass flow controller arrangement Bypass flow controller details, dimensionsEvacuation and Leak Check Piping Installation MethodPiping Details-Shut-Off/Isolation Valves Piping MainsChecklist for Proper Installation Indicator Lights Description Green Red Checklist for Liebert XDP StartupLiebert XDP pump light indicator-208V and 400V units System R-134a liquid level Filling the Pumped Circuit-R-134aReturn Line Diameter System refrigerant charge for the supply and return mainsReturn Line Diameter 5/8 Total 293 Calculating Refrigerant Charge-ExampleCalculating refrigerant charge-example Worksheet to calculate refrigerant chargeUser interface keypad functions Feature OverviewMicroprocessor Control DisplayMain Menu Feature OverviewViewing or Changing Settings ControlsMIN Temp SP Active AlarmsAlarm History SetpointsPump Start TD Setup OperationRestart Time Delay DegreesLead Pump Liebert XDP DIP switches and factory settingsPump Wait TD Pump OFF TDValve Time Password Security-SETPT Password and Service PasswordChange Password-SETPT Password COM Alarm Enable Change Password-SERVICE PasswordAlarm Enable Alarm Time DelayCustom Text Custom AlarmsDiagnostics Alarm Descriptions and Solutions Alarm DescriptionsEnable or Disable Alarms Red and Green Lamp IndicatorsAlter Alarm Settings System Shutdown Causes Troubleshooting the XDP TroubleshootingFluorinated Greenhouse Gas Requirements MaintenanceLiebert XDP160 specifications SpecificationsThat Ne tIti Ti n