Liebert Removing pallet boards for piano jack insertion, Liebert XDP strapped to piano jack

Page 9

Product Description

4.Remove the two (2) end deck boards from one end of the pallet and the attached, notched section of the center runners (refer to Figure 3).

Figure 3 Removing pallet boards for piano jack insertion

Remove two deck boards ...

... and center runner sections from one end of pallet.

5.Place a piano jack with its forks snugly against the bottom of the unit and strap the Liebert XDP securely to the jack (refer to Figure 4).

NOTE

Place a mover’s blanket or other cushioning material between the piano jack and the unit’s side panels.

Figure 4 Liebert XDP strapped to piano jack

Piano jack

Strap secures the

Liebert XDP to the jack

Place cushioning material between the forks and the Liebert XDP to protect unit’s finish (cushion not shown for clarity)

Piano jack’s forks should be snug against the Liebert XDP

6.Repeat Steps 2, 4 and 5 for the opposite side of the unit. When these steps have been completed, the Liebert XDP will be supported by two piano jacks, one on either side.

7.Remove all of the remaining lag bolts from one (1) of the pallet’s outside runners (see Figure 5).

Figure 5 Remove remaining lag bolts from one runner

Remaining 6 lag bolts to remove

3

Image 9
Contents Liebert XDP Example XDP160A General Safety GuidelinesFluorinated Greenhouse Gas Requirements-European Union Pumping Place holder Revision Unit Redundancy Level LiebertTable of Contents Specifications Alarm Descriptions and SolutionsFigures Page Equipment Inspection General Product InformationProduct Description Product/System DescriptionEquipment Handling Handling With SkidRemoval from Skid Liebert XDP strapped to piano jack Removing pallet boards for piano jack insertionSlide this runner away From the Liebert XDP Removing Piano JacksLiebert XDP dimensions Mechanical ConsiderationsPositioning the Liebert XDP Model Pipe Connection Point 50/60 Hz Unit piping outlet connection sizes, inches, OD CuElectrical Information High Voltage Connections Connecting High-Voltage CablesElectrical enclosure knockout locations for field wiring High voltage connections-50Hz Extra Low Voltage ELV ConnectionsField Connections-Optional for All Units Field Connections-All UnitsConnection Sizes European Union Fluorinated Greenhouse Gas RequirementsPiping Recommended Pipe SizeLiebert XDP Interconnection with Liebert XD Cooling Modules Piping Installation MethodBypass Flow Controller Bypass flow controllers for a Liebert XDP-based systemBypass flow controller arrangement Bypass flow controller details, dimensionsPiping Details-Shut-Off/Isolation Valves Piping Installation MethodPiping Mains Evacuation and Leak CheckChecklist for Proper Installation Checklist for Liebert XDP Startup Liebert XDP pump light indicator-208V and 400V unitsIndicator Lights Description Green Red System R-134a liquid level Filling the Pumped Circuit-R-134aSystem refrigerant charge for the supply and return mains Return Line Diameter 5/8Return Line Diameter Calculating refrigerant charge-example Calculating Refrigerant Charge-ExampleWorksheet to calculate refrigerant charge Total 293Microprocessor Control Feature OverviewDisplay User interface keypad functionsViewing or Changing Settings Feature OverviewControls Main MenuAlarm History Active AlarmsSetpoints MIN Temp SPRestart Time Delay Setup OperationDegrees Pump Start TDPump Wait TD Liebert XDP DIP switches and factory settingsPump OFF TD Lead PumpPassword Security-SETPT Password and Service Password Change Password-SETPT PasswordValve Time Alarm Enable Change Password-SERVICE PasswordAlarm Time Delay COM Alarm EnableCustom Alarms DiagnosticsCustom Text Alarm Descriptions and Solutions Alarm DescriptionsRed and Green Lamp Indicators Alter Alarm SettingsEnable or Disable Alarms System Shutdown Causes Troubleshooting the XDP TroubleshootingFluorinated Greenhouse Gas Requirements MaintenanceLiebert XDP160 specifications SpecificationsIti Ne tTi n That