3.2.2OK To Transfer
The OK to Transfer status message will be displayed when the bypass line and UPS system output power are both available, their voltage, frequency, and phase synchronization are matched within specifications, and the Static Switch Disconnects are closed (ON). An alarm message may be displayed to indicate Load On Bypass. If no alarm is displayed, the operating status is Load On UPS.
When the OK to Transfer message is displayed, you can perform a manual transfer of the load from the UPS sys- tem to bypass, or a manual retransfer of the load from bypass to the UPS system.
Use the Load Transfer Procedures screen at the SCC when performing a manual transfer. Refer to 3.3.2 - Load Transfer Procedures.
The UPS system control logic at the SCC will initiate an automatic transfer to bypass if an overload condition exceeds the system current versus time window, or if a UPS module is taken off line while the system is operat- ing in the
NOTE
When the critical load is being supplied power from the bypass line, it is exposed to utility power disturbances.
Figure 48 Load on Bypass (UPS Available)
|
|
| RIB |
|
|
|
| RIB |
|
| RIB |
|
|
|
| BFB |
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UPS #3 | UPS #2 | UPS | #1 |
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
CB1 |
|
| CB1 |
|
| CB1 |
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
| SBS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
| R |
|
| R |
| R |
|
|
|
|
| BIB | |||||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||||||
|
|
|
|
|
|
| SBB |
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
| I |
|
| I |
| I |
|
|
|
|
|
|
|
|
|
|
| MBB | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
CB2 |
|
| CB2 |
|
|
| CB2 |
| System |
|
|
|
| SKRU | ||||||||
|
|
|
|
|
|
|
|
|
| |||||||||||||
|
|
|
|
|
| Controls |
|
|
|
|
|
|
|
|
|
|
Output MIB
|
|
|
|
|
|
|
|
| SCCT | |
|
| MBD |
|
|
|
|
|
| To Critical Load | |
|
|
|
|
|
|
|
| |||
|
|
|
| MBD |
|
|
| MBD | ||
Battery |
|
|
|
|
|
| SCCT | |||
Battery | Battery | |||||||||
(can accommodate up to 6 UPS modules) | ||||||||||
|
|
|
|
|
|
|
|
|
Operation 79