3.2.3Momentary Overloads
An overload in the critical load will continue to be supplied by the UPS system if the overload condition does not exceed the current versus time curve of overload capacity for either the SCC rating or for the number of modules
For momentary overloads exceeding 155% of rated system (SCC) current, the static switch turns on for 40 milli- seconds to provide current from the bypass line in parallel with current from the UPS system output. Up to 1000% of rated current can be supplied for less than one cycle, while up to 500% of rated load can be sustained for the full 40 milliseconds of
If an overload situation exceeds 40 milliseconds, the UPS system continues to supply power to the critical load if it remains within the current versus time curve of overload capacity. If the system overload capacity is exceeded, the UPS control logic at the SCC initiates an automatic transfer to the bypass line by operating the static bypass switch and the motorized system circuit breakers (SBB and UPS Output).
Refer to 3.4 - Automatic Operations.
Figure 50 Momentary Overload (Pulsed Static Bypass Switch)
|
|
| RIB |
|
|
|
| RIB |
|
| RIB |
|
|
|
| BFB |
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UPS #3 | UPS #2 | UPS | #1 |
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
CB1 |
|
| CB1 |
|
| CB1 |
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
| SBS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
| R |
|
| R |
| R |
|
|
|
|
| BIB | |||||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||||||
|
|
|
|
|
|
| SBB |
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
| I |
|
| I |
| I |
|
|
|
|
|
|
|
|
|
|
| MBB | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CB2 |
|
| CB2 |
|
|
| CB2 |
| System |
|
|
|
| SKRU | ||||||||
|
|
|
|
|
|
|
|
|
| |||||||||||||
|
|
|
|
|
| Controls |
|
|
|
|
|
|
|
|
|
|
Output MIB
|
|
|
|
|
|
|
|
| SCCT | |
|
| MBD |
|
|
|
|
|
| To Critical Load | |
|
|
|
|
|
|
|
| |||
|
|
|
| MBD |
|
|
| MBD | ||
Battery |
|
|
|
|
|
| SCCT | |||
Battery | Battery | |||||||||
(can accommodate up to 6 UPS modules) | ||||||||||
|
|
|
|
|
|
|
|
|
Operation 81