GE 225, 300 manual Unpacking, Take care not to damage the UPS when moving by forklift

Page 16

g

GE

3.6UNPACKING

The UPS and Battery Cabinets may be shipped packaged in carton boxes or in wooden crates (if requested).

Move the cabinets as close as possible to the final location before removing from the pallet.

If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the heavy weight of the equipment.

Take care not to damage the UPS when moving by forklift.

For parallel systems, the delivery also includes the bus control cables for inter-connecting the UPS modules.

Packing material recycling

GE Industrial Systems, in compliance with environment protection, uses only environmentally friendly material.

UPS packing materials must be recycled in compliance with all applicable regulations.

OPM_SGS_ISG_M22_M30_0US_V011.doc

16/38

Installation Guide SG Series 225 & 300 kVA

Image 16
Contents SG Series Copyright 2003 by GE Industrial Systems SystemsDear Customer Start UP and CommissioningPreface Table of contents Installation BatteryGeneral StorageSafety instructions when working with battery Safety symbols and warnings Safety warningsRisk of electric shock PE Earth GND Ground Protective Grounding TerminalLayout Layout SG Series 225 and 300 KVADimensions and weight Weight SG Series 225 and 300 kVATransport Forklift Crane Transport UPS only in upright positionDelivery Storage of BatteryStorage of the UPS Positioning of the UPS SG Series Place of InstallationCheck -26A of the NEC code for specific requirements Openings for input and output cable connections Fixing of the UPS cabinet on the floorBattery location 1-5 RPA system dispositionVentilation and Cooling CFMUnpacking Take care not to damage the UPS when moving by forkliftPacking material recycling Separate input Rectifier & Bypass recommended Electrical WiringCommon input Rectifier & Bypass Input/output over current protection and wire sizing Neutral current could be greater than the phase currentsPhase, 3 wire plus Ground Phase, 4 wire plus GroundWire positive and negative plus Ground See .7.1-1Copper Wiring Connection Wire Size Range1-1 Access to the input / output connections Common Input Rectifier / Bypass Power connection with common input utilityOutput Load Cable section for this connection shall be not less then AWG Power connection separate input utility L1-1 Rectifier Phase a L1-2L2-1 Rectifier Phase B L2-2 L3-1 Rectifier Phase C L3-2BR1 Battery connection BatteryPositive pole of the Battery Do not insert the Battery Fuses before the commissioningSetup for SG Series when functioning as frequency converter Manual Bypass, serious damage to the Load could resultPower Wiring of Parallel Units 1 RPA Parallel SystemUPS Parallel Control BUS ConnectionTerminal units Intermediate unitsAccess to the control bus connection Control BUS Cable LocationControl bus cables connection Interface IM0048 going to P13Control bus cables routing 11-3 Control Bus cable routing and connectionCustomer Interface Customer Interface15, 16 Or J2 17, 18 NO, C, NC General Alarm 18, 19 Or J2 20, 21 NO, C, NC Acoustic AlarmOutput potential free contacts Or J2 / 1, 2 NO, C, NC Utility FailureGND EPO Emergency Power Off Input contact JP338/38