GE 225, 300 manual BR1

Page 26

g

GE

This UPS is only designed to operate in a wye-configured electrical system with a solidly grounded neutral.

In case of 3-wire utility input the following solutions are possible:

1- Connection of a “3-wire kit” between Utility Input and Neutral of the output transformer.

Attention: With this configuration, load can only be connected phase- phase. Absolutely no load connection permitted to the Neutral of the output transformer.

In a RPA configuration with 3-wire kit, it’s most important to connect the Neutrals of the UPS outputs together (see Fig .3.8.3-2).

Cable section for this connection shall be not less then AWG 1.

Fig. 3.8.3-2 3-wire kit for RPA Parallel System

2- Bypass transformer.

In this case the Neutral of wye secondary winding must be connected to the Neutral of the output transformer.

Contact your Service Centre, which will help you to find valuable solutions.

Notices for installation

SGS_225-300_UPS BR1-2-3_01

Q2

Q1

Q2

 

 

BR1

BR2

BR3

Fig. 3.8.3-3 AC bus bars BR1, BR2 and BR3

For separate Bypass and Rectifier input configuration AC bus bars BR1, BR2 and BR3 must be removed.

OPM_SGS_ISG_M22_M30_0US_V011.doc

26/38

Installation Guide SG Series 225 & 300 kVA

Image 26
Contents SG Series Copyright 2003 by GE Industrial Systems SystemsDear Customer Start UP and CommissioningPreface Table of contents General InstallationBattery StorageSafety instructions when working with battery Risk of electric shock PE Earth GND Ground Safety symbols and warningsSafety warnings Protective Grounding TerminalLayout Layout SG Series 225 and 300 KVATransport Forklift Crane Dimensions and weightWeight SG Series 225 and 300 kVA Transport UPS only in upright positionStorage of the UPS Storage of BatteryDelivery Check -26A of the NEC code for specific requirements Place of InstallationPositioning of the UPS SG Series Openings for input and output cable connections Fixing of the UPS cabinet on the floorBattery location 1-5 RPA system dispositionVentilation and Cooling CFMPacking material recycling Take care not to damage the UPS when moving by forkliftUnpacking Common input Rectifier & Bypass Electrical WiringSeparate input Rectifier & Bypass recommended Input/output over current protection and wire sizing Neutral current could be greater than the phase currentsWire positive and negative plus Ground Phase, 3 wire plus GroundPhase, 4 wire plus Ground See .7.1-1Copper Wiring Connection Wire Size Range1-1 Access to the input / output connections Output Load Power connection with common input utilityCommon Input Rectifier / Bypass Cable section for this connection shall be not less then AWG L2-1 Rectifier Phase B L2-2 Power connection separate input utilityL1-1 Rectifier Phase a L1-2 L3-1 Rectifier Phase C L3-2BR1 Positive pole of the Battery Battery connectionBattery Do not insert the Battery Fuses before the commissioningSetup for SG Series when functioning as frequency converter Manual Bypass, serious damage to the Load could resultPower Wiring of Parallel Units 1 RPA Parallel SystemUPS Parallel Control BUS ConnectionTerminal units Intermediate unitsControl bus cables connection Access to the control bus connectionControl BUS Cable Location Interface IM0048 going to P13Control bus cables routing 11-3 Control Bus cable routing and connectionCustomer Interface Customer InterfaceOutput potential free contacts 15, 16 Or J2 17, 18 NO, C, NC General Alarm18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm Or J2 / 1, 2 NO, C, NC Utility FailureGND EPO Emergency Power Off Input contact JP338/38