GE 225 Safety symbols and warnings, Safety warnings, Risk of electric shock PE Earth GND Ground

Page 8

g

GE

Safety symbols and warnings

Safety warnings

The text of this manual contains some warnings to avoid risk to the persons and to avoid damages to the UPS system and the supplied critical loads.

The non-observance of the warnings reminding hazardous situations could result in human injury and equipment damages.

Please pay attention to the meaning of the following warnings and symbols.

Throughout this manual the following symbols are defined:

WARNING, if instruction is not followed injury or serious equipment damage may occur!

CAUTION, internal parts have dangerous voltage present.

Risk of electric shock!

PE (Earth) – GND (Ground)

PROTECTIVE GROUNDING TERMINAL:

A terminal which must be connected to earth ground prior to making any other connection to the equipment.

A terminal to which or from which an alternating (sine wave) current or voltage may be applied or supplied.

A terminal to which or from which a direct current or voltage may be applied or supplied.

This symbol indicated the word “phase”.

This symbol indicates the principal on/off switch in the on position.

This symbol indicates the principal on/off switch in the off position.

OPM_SGS_ISG_M22_M30_0US_V011.doc

8/38

Installation Guide SG Series 225 & 300 kVA

Image 8
Contents SG Series Copyright 2003 by GE Industrial Systems SystemsDear Customer Start UP and CommissioningPreface Table of contents Installation BatteryGeneral StorageSafety instructions when working with battery Safety symbols and warnings Safety warningsRisk of electric shock PE Earth GND Ground Protective Grounding TerminalLayout Layout SG Series 225 and 300 KVADimensions and weight Weight SG Series 225 and 300 kVATransport Forklift Crane Transport UPS only in upright positionStorage of the UPS Storage of BatteryDelivery Check -26A of the NEC code for specific requirements Place of InstallationPositioning of the UPS SG Series Openings for input and output cable connections Fixing of the UPS cabinet on the floorBattery location 1-5 RPA system dispositionVentilation and Cooling CFMPacking material recycling Take care not to damage the UPS when moving by forkliftUnpacking Common input Rectifier & Bypass Electrical WiringSeparate input Rectifier & Bypass recommended Input/output over current protection and wire sizing Neutral current could be greater than the phase currentsPhase, 3 wire plus Ground Phase, 4 wire plus GroundWire positive and negative plus Ground See .7.1-1Copper Wiring Connection Wire Size Range1-1 Access to the input / output connections Output Load Power connection with common input utilityCommon Input Rectifier / Bypass Cable section for this connection shall be not less then AWG Power connection separate input utility L1-1 Rectifier Phase a L1-2L2-1 Rectifier Phase B L2-2 L3-1 Rectifier Phase C L3-2BR1 Battery connection BatteryPositive pole of the Battery Do not insert the Battery Fuses before the commissioningSetup for SG Series when functioning as frequency converter Manual Bypass, serious damage to the Load could resultPower Wiring of Parallel Units 1 RPA Parallel SystemUPS Parallel Control BUS ConnectionTerminal units Intermediate unitsAccess to the control bus connection Control BUS Cable LocationControl bus cables connection Interface IM0048 going to P13Control bus cables routing 11-3 Control Bus cable routing and connectionCustomer Interface Customer Interface15, 16 Or J2 17, 18 NO, C, NC General Alarm 18, 19 Or J2 20, 21 NO, C, NC Acoustic AlarmOutput potential free contacts Or J2 / 1, 2 NO, C, NC Utility FailureGND EPO Emergency Power Off Input contact JP338/38