3 INSTALLATION

3.1TRANSPORT Forklift

Crane

Fig. 3.1-1 UPS cabinets moving

3.1.1 Dimensions and weight

01US

 

GE

 

-300 UPS dimensions

 

225

 

SGS

H

 

Transport UPS only in upright position!

The UPS is packaged on a pallet suitable for handling with a forklift.

Pay attention to the center of gravity.

The UPS must be moved in upright position. Do not tilt cabinets more than +/- 10° during handling.

Move the UPS in it’s original package to the final destination site.

Do not stack other packages on top:

This could damage the UPS.

If the UPS must be lifted by crane, use suitable lifting straps and spreader bars.

Note of the center of gravity marked on the package.

Check for sufficient floor and elevator loading capacity.

Dimensions SG Series 225 and 300 kVA

(W x D x H)

64.96x 31.50 x 70.90 inches 1,650 x 800 x 1,800 mm

D

W

 

 

 

Fig. 3.1.1-1 UPS cabinet dimensions

 

 

 

 

 

 

 

 

Weight SG Series 225 and 300 kVA

 

 

UPS rating

Weight

 

Floor loading

 

lbs / kg

 

lbs/sq.ft - kg/m2

SG Series 225 kVA

2,756 / 1,250

 

194 / 947

SG Series 300 kVA

3,087 / 1,400

 

218 / 1,061

P.S.: Weights including the 5th harmonic filter.

OPM_SGS_ISG_M22_M30_0US_V011.doc

10/38

Installation Guide SG Series 225 & 300 kVA

Image 10
Contents SG Series Copyright 2003 by GE Industrial Systems SystemsDear Customer Start UP and CommissioningPreface Table of contents General InstallationBattery StorageSafety instructions when working with battery Risk of electric shock PE Earth GND Ground Safety symbols and warningsSafety warnings Protective Grounding TerminalLayout Layout SG Series 225 and 300 KVATransport Forklift Crane Dimensions and weightWeight SG Series 225 and 300 kVA Transport UPS only in upright positionDelivery Storage of BatteryStorage of the UPS Positioning of the UPS SG Series Place of InstallationCheck -26A of the NEC code for specific requirements Openings for input and output cable connections Fixing of the UPS cabinet on the floorBattery location 1-5 RPA system dispositionVentilation and Cooling CFMUnpacking Take care not to damage the UPS when moving by forkliftPacking material recycling Separate input Rectifier & Bypass recommended Electrical WiringCommon input Rectifier & Bypass Input/output over current protection and wire sizing Neutral current could be greater than the phase currentsWire positive and negative plus Ground Phase, 3 wire plus GroundPhase, 4 wire plus Ground See .7.1-1Copper Wiring Connection Wire Size Range1-1 Access to the input / output connections Common Input Rectifier / Bypass Power connection with common input utilityOutput Load Cable section for this connection shall be not less then AWG L2-1 Rectifier Phase B L2-2 Power connection separate input utilityL1-1 Rectifier Phase a L1-2 L3-1 Rectifier Phase C L3-2BR1 Positive pole of the Battery Battery connectionBattery Do not insert the Battery Fuses before the commissioningSetup for SG Series when functioning as frequency converter Manual Bypass, serious damage to the Load could resultPower Wiring of Parallel Units 1 RPA Parallel SystemUPS Parallel Control BUS ConnectionTerminal units Intermediate unitsControl bus cables connection Access to the control bus connectionControl BUS Cable Location Interface IM0048 going to P13Control bus cables routing 11-3 Control Bus cable routing and connectionCustomer Interface Customer InterfaceOutput potential free contacts 15, 16 Or J2 17, 18 NO, C, NC General Alarm18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm Or J2 / 1, 2 NO, C, NC Utility FailureGND EPO Emergency Power Off Input contact JP338/38