GE 300, 225 manual Power connection separate input utility, Separate Input Rectifier / Bypass

Page 25

g

GE

3.8.3Power connection separate input utility

01USGE

PE Load

 

PE

 

 

 

 

Input rectifier

 

 

 

 

 

 

separate_

 

D

 

L1

 

 

connection

 

A

 

 

 

 

 

O

L2

 

 

 

 

 

L

 

 

 

 

 

 

 

 

 

UPS

 

L3

 

 

 

 

 

N

 

 

 

 

225-300

 

 

 

 

 

 

 

 

 

 

 

SGS

 

 

 

 

 

 

 

 

 

 

 

 

L1-1

 

 

 

 

L2-1

R

 

 

 

 

 

 

IE

 

 

 

 

 

 

IF

 

 

 

 

 

T

 

 

 

L3-1

 

C

 

 

 

 

E

 

 

 

 

 

R

 

 

 

 

 

 

T

 

 

 

 

 

 

U

 

 

 

 

N

P

 

 

 

 

IN

 

 

 

 

 

 

-

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

L3-2

 

PE Load

 

 

 

 

L2-2

 

Position of the PE compression lugs in case

PE

 

 

 

L1-2

 

 

 

 

 

 

Input rectifier

 

 

 

 

the cable input is from the bottom of the UPS

 

 

 

2 - INPUT BYPASS

Fig. 3.8.3-1 Power connections Separate Input Utility

Separate Input Rectifier / Bypass

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

N

Neutral (Bypass)

PE

Ground

The interconnection links BR1, BR2 and BR3 must be removed (see Fig. 3.8.3-2).

Output Load

L1

Load Phase A

L2

Load Phase B

L3 Load Phase C

N

Neutral

PE

Ground

 

Bus bars BR1, BR2 and BR3 must be removed.

Cable terminations are to the Rectifier/Bypass Input Lugs and Load Output Lugs as shown above. Connect wire to the Lugs using appropriate tools and appropriate torque.

Torque specification for Input/Output and DC power connections on Bus Bars: Section 3.8.1.

OPM_SGS_ISG_M22_M30_0US_V011.doc

25/38

Installation Guide SG Series 225 & 300 kVA

Image 25
Contents SG Series Systems Copyright 2003 by GE Industrial SystemsStart UP and Commissioning Dear CustomerPreface Table of contents Battery InstallationGeneral StorageSafety instructions when working with battery Safety warnings Safety symbols and warningsRisk of electric shock PE Earth GND Ground Protective Grounding TerminalLayout SG Series 225 and 300 KVA LayoutWeight SG Series 225 and 300 kVA Dimensions and weightTransport Forklift Crane Transport UPS only in upright positionDelivery Storage of BatteryStorage of the UPS Positioning of the UPS SG Series Place of InstallationCheck -26A of the NEC code for specific requirements Fixing of the UPS cabinet on the floor Openings for input and output cable connections1-5 RPA system disposition Battery locationCFM Ventilation and CoolingUnpacking Take care not to damage the UPS when moving by forkliftPacking material recycling Separate input Rectifier & Bypass recommended Electrical WiringCommon input Rectifier & Bypass Neutral current could be greater than the phase currents Input/output over current protection and wire sizingPhase, 4 wire plus Ground Phase, 3 wire plus GroundWire positive and negative plus Ground See .7.1-1Copper Wire Size Range Wiring Connection1-1 Access to the input / output connections Common Input Rectifier / Bypass Power connection with common input utilityOutput Load Cable section for this connection shall be not less then AWG L1-1 Rectifier Phase a L1-2 Power connection separate input utilityL2-1 Rectifier Phase B L2-2 L3-1 Rectifier Phase C L3-2BR1 Battery Battery connectionPositive pole of the Battery Do not insert the Battery Fuses before the commissioningManual Bypass, serious damage to the Load could result Setup for SG Series when functioning as frequency converter1 RPA Parallel System Power Wiring of Parallel UnitsParallel Control BUS Connection UPSIntermediate units Terminal unitsControl BUS Cable Location Access to the control bus connectionControl bus cables connection Interface IM0048 going to P1311-3 Control Bus cable routing and connection Control bus cables routingCustomer Interface Customer Interface18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm 15, 16 Or J2 17, 18 NO, C, NC General AlarmOutput potential free contacts Or J2 / 1, 2 NO, C, NC Utility FailureGND JP3 EPO Emergency Power Off Input contact38/38