SG Series
Systems
Copyright 2003 by GE Industrial Systems
Start UP and Commissioning
Dear Customer
Preface
Table of contents
Battery
Installation
General
Storage
Safety instructions when working with battery
Safety warnings
Safety symbols and warnings
Risk of electric shock PE Earth GND Ground
Protective Grounding Terminal
Layout SG Series 225 and 300 KVA
Layout
Weight SG Series 225 and 300 kVA
Dimensions and weight
Transport Forklift Crane
Transport UPS only in upright position
Delivery
Storage of Battery
Storage of the UPS
Positioning of the UPS SG Series
Place of Installation
Check -26A of the NEC code for specific requirements
Fixing of the UPS cabinet on the floor
Openings for input and output cable connections
1-5 RPA system disposition
Battery location
CFM
Ventilation and Cooling
Unpacking
Take care not to damage the UPS when moving by forklift
Packing material recycling
Separate input Rectifier & Bypass recommended
Electrical Wiring
Common input Rectifier & Bypass
Neutral current could be greater than the phase currents
Input/output over current protection and wire sizing
Phase, 4 wire plus Ground
Phase, 3 wire plus Ground
Wire positive and negative plus Ground
See .7.1-1
Copper
Wire Size Range
Wiring Connection
1-1 Access to the input / output connections
Common Input Rectifier / Bypass
Power connection with common input utility
Output Load
Cable section for this connection shall be not less then AWG
L1-1 Rectifier Phase a L1-2
Power connection separate input utility
L2-1 Rectifier Phase B L2-2
L3-1 Rectifier Phase C L3-2
BR1
Battery
Battery connection
Positive pole of the Battery
Do not insert the Battery Fuses before the commissioning
Manual Bypass, serious damage to the Load could result
Setup for SG Series when functioning as frequency converter
1 RPA Parallel System
Power Wiring of Parallel Units
Parallel Control BUS Connection
UPS
Intermediate units
Terminal units
Control BUS Cable Location
Access to the control bus connection
Control bus cables connection
Interface IM0048 going to P13
11-3 Control Bus cable routing and connection
Control bus cables routing
Customer Interface
Customer Interface
18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm
15, 16 Or J2 17, 18 NO, C, NC General Alarm
Output potential free contacts
Or J2 / 1, 2 NO, C, NC Utility Failure
GND
JP3
EPO Emergency Power Off Input contact
38/38