GE 300 Power connection with common input utility, Common Input Rectifier / Bypass, Output Load

Page 23

g

GE

3.8.2Power connection with common input utility

SGS_225-300_UPS connection common_GE_01US

PE Load

PE

 

Input rectifier

D

 

L1

 

 

A

 

 

 

 

O

L2

 

 

 

L

 

 

 

 

 

 

 

L3

 

 

 

 

N

 

 

 

 

 

 

 

 

L1-1

 

 

L2-1

R

 

 

 

 

IE

 

 

 

 

IF

 

 

 

T

 

L3-1

 

C

 

 

E

 

 

 

R

 

 

 

 

T

 

 

 

 

U

 

 

N

P

 

 

IN

 

 

 

 

-

 

 

 

 

1

 

 

 

PE Load

Position of the PE compression lugs in case

PE

Input rectifier

the cable input is from the bottom of the UPS

Fig. 3.8.2-1 Power connections Common Input Utility

Common Input Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A

 

 

L2-1

Rectifier + Bypass Phase B

 

 

L3-1

Rectifier + Bypass Phase C

 

 

N

Neutral (Bypass)

PE

Ground

Output Load

L1

Load Phase A

L2

Load Phase B

L3 Load Phase C

N

Neutral

PE

Ground

 

Bus bars BR1, BR2 and BR3 must remain connected.

Cable terminations are to the Rectifier Input Lugs and Output Lugs as shown above. Connect wire to the Lugs using appropriate tools and appropriate torque.

Torque specification for input/output and DC power connections on Bus Bars: Section 3.8.1.

OPM_SGS_ISG_M22_M30_0US_V011.doc

23/38

Installation Guide SG Series 225 & 300 kVA

Image 23
Contents SG Series Systems Copyright 2003 by GE Industrial SystemsStart UP and Commissioning Dear CustomerPreface Table of contents Storage InstallationBattery GeneralSafety instructions when working with battery Protective Grounding Terminal Safety symbols and warningsSafety warnings Risk of electric shock PE Earth GND GroundLayout SG Series 225 and 300 KVA LayoutTransport UPS only in upright position Dimensions and weightWeight SG Series 225 and 300 kVA Transport Forklift CraneStorage of the UPS Storage of BatteryDelivery Check -26A of the NEC code for specific requirements Place of InstallationPositioning of the UPS SG Series Fixing of the UPS cabinet on the floor Openings for input and output cable connections1-5 RPA system disposition Battery locationCFM Ventilation and CoolingPacking material recycling Take care not to damage the UPS when moving by forkliftUnpacking Common input Rectifier & Bypass Electrical WiringSeparate input Rectifier & Bypass recommended Neutral current could be greater than the phase currents Input/output over current protection and wire sizingSee .7.1-1 Phase, 3 wire plus GroundPhase, 4 wire plus Ground Wire positive and negative plus GroundCopper Wire Size Range Wiring Connection1-1 Access to the input / output connections Output Load Power connection with common input utilityCommon Input Rectifier / Bypass Cable section for this connection shall be not less then AWG L3-1 Rectifier Phase C L3-2 Power connection separate input utilityL1-1 Rectifier Phase a L1-2 L2-1 Rectifier Phase B L2-2BR1 Do not insert the Battery Fuses before the commissioning Battery connectionBattery Positive pole of the BatteryManual Bypass, serious damage to the Load could result Setup for SG Series when functioning as frequency converter1 RPA Parallel System Power Wiring of Parallel UnitsParallel Control BUS Connection UPSIntermediate units Terminal unitsInterface IM0048 going to P13 Access to the control bus connectionControl BUS Cable Location Control bus cables connection11-3 Control Bus cable routing and connection Control bus cables routingCustomer Interface Customer InterfaceOr J2 / 1, 2 NO, C, NC Utility Failure 15, 16 Or J2 17, 18 NO, C, NC General Alarm18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm Output potential free contactsGND JP3 EPO Emergency Power Off Input contact38/38