g
Table of contents
GE
Page
1 | IMPORTANT SAFETY INSTRUCTIONS | 6 | |
2 | LAYOUT | 9 | |
2.1 |
| LAYOUT SG SERIES 225 AND 300 KVA | 9 |
3 | INSTALLATION | 10 | |
3.1 |
| TRANSPORT | 10 |
| 3.1.1 | Dimensions and weight | 10 |
3.2 |
| DELIVERY | 11 |
3.3 |
| STORAGE | 11 |
| 3.3.1 Storage of the UPS | 11 | |
| 3.3.2 | Storage of Battery | 11 |
3.4 |
| PLACE OF INSTALLATION | 12 |
| 3.4.1 | UPS location | 12 |
| 3.4.2 | Battery location | 14 |
3.5 |
| VENTILATION AND COOLING | 15 |
3.6 |
| UNPACKING | 16 |
3.7 |
| ELECTRICAL WIRING | 17 |
| 3.7.1 | Utility input connection | 17 |
| 3.7.2 Input/output over current protection and wire sizing | 18 | |
| 3.7.3 Battery over current protection and wire sizing | 19 | |
3.8 |
| WIRING CONNECTION | 21 |
| 3.8.1 | Power connections | 21 |
| 3.8.2 Power connection with common input utility | 23 | |
| 3.8.3 Power connection separate input utility | 25 | |
| 3.8.4 | Battery connection | 27 |
| 3.8.5 Setup for SG Series when functioning as frequency converter | 28 | |
3.9 |
| POWER WIRING OF PARALLEL UNITS | 29 |
3.10 |
| PARALLEL CONTROL BUS CONNECTION | 30 |
3.11 |
| CONTROL BUS CABLE LOCATION | 32 |
4 | CUSTOMER INTERFACE | 34 | |
4.1 |
| CUSTOMER INTERFACE | 34 |
| 4.1.1 | Serial Port J3 | 35 |
| 4.1.2 Output potential free contacts | 35 | |
| 4.1.3 Programmable input free contacts | 36 | |
| 4.1.4 Gen Set Signaling (GEN ON) | 36 | |
| 4.1.5 AUX external Maintenance Bypass | 36 | |
| 4.1.6 Auxiliary Power Supply (APS) 24 VDC / 1A | 36 | |
| 4.1.7 EPO (Emergency Power Off) Input contact | 37 | |
5 | NOTES | 38 | |
5.1 |
| NOTES FORM | 38 |
OPM_SGS_ISG_M22_M30_0US_V011.doc | 5/38 | Installation Guide SG Series 225 & 300 kVA |