g

GE

SGS_225-300_RPA control bus cable_02US

JB1 JB

JA1

JA

Q1

Q2

JB1

JB1

JB2 JB

JA1

JA2 JA

Q1

Q2

JA1 UPS 1

UPS 2

Fig. 3.11-3 Control Bus cable routing and connection

JA2

JB2

Ne

 

 

 

 

xt

 

 

 

 

p

 

unit

3,

ar

 

4,

6,

7,

8

 

allel 5,

Control bus cables routing

Place and fix the cables JA-1/2/3/4/5/6/7and JB-1/2/3/4/5/6/7inside the UPS cabinets in the position illustrated in the drawing.

Pay attention when cabling and routing the bus cables JA and JB inside the UPS cabinet.

In case one unit should be removed from the parallel system, the bus cables JA and JB must be removed from the cabinet without disconnecting them from the metal plate where the sockets JA and JB are located.

For reliability reasons the cables JA-1/2/3/4/5/6/7and JB-1/2/3/4/5/6/7connecting the units should be run in separated protected conduits (as indicated in fig. 3.11-3) separated from the power cables.

It is important that the cable JA must be the same length as cable JB.

The connection of the control bus cable in a UPS system already powered requires a special reset operation, which can be made by only a trained operator.

OPM_SGS_ISG_M22_M30_0US_V011.doc

33/38

Installation Guide SG Series 225 & 300 kVA

Image 33
Contents SG Series Systems Copyright 2003 by GE Industrial SystemsStart UP and Commissioning Dear CustomerPreface Table of contents Battery InstallationGeneral StorageSafety instructions when working with battery Safety warnings Safety symbols and warningsRisk of electric shock PE Earth GND Ground Protective Grounding TerminalLayout SG Series 225 and 300 KVA LayoutWeight SG Series 225 and 300 kVA Dimensions and weightTransport Forklift Crane Transport UPS only in upright positionStorage of Battery DeliveryStorage of the UPS Place of Installation Positioning of the UPS SG SeriesCheck -26A of the NEC code for specific requirements Fixing of the UPS cabinet on the floor Openings for input and output cable connections1-5 RPA system disposition Battery locationCFM Ventilation and CoolingTake care not to damage the UPS when moving by forklift UnpackingPacking material recycling Electrical Wiring Separate input Rectifier & Bypass recommendedCommon input Rectifier & Bypass Neutral current could be greater than the phase currents Input/output over current protection and wire sizingPhase, 4 wire plus Ground Phase, 3 wire plus GroundWire positive and negative plus Ground See .7.1-1Copper Wire Size Range Wiring Connection1-1 Access to the input / output connections Power connection with common input utility Common Input Rectifier / BypassOutput Load Cable section for this connection shall be not less then AWG L1-1 Rectifier Phase a L1-2 Power connection separate input utilityL2-1 Rectifier Phase B L2-2 L3-1 Rectifier Phase C L3-2BR1 Battery Battery connectionPositive pole of the Battery Do not insert the Battery Fuses before the commissioningManual Bypass, serious damage to the Load could result Setup for SG Series when functioning as frequency converter1 RPA Parallel System Power Wiring of Parallel UnitsParallel Control BUS Connection UPSIntermediate units Terminal unitsControl BUS Cable Location Access to the control bus connectionControl bus cables connection Interface IM0048 going to P1311-3 Control Bus cable routing and connection Control bus cables routingCustomer Interface Customer Interface18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm 15, 16 Or J2 17, 18 NO, C, NC General AlarmOutput potential free contacts Or J2 / 1, 2 NO, C, NC Utility FailureGND JP3 EPO Emergency Power Off Input contact38/38