GE 300, 225 manual Terminal units, Intermediate units

Page 31

g

GE

SGT5000_100-150_RPA-IM0048_02

JB1 JP1

IM 0048

JP2

JP1

JP4

JP2

JB

JP3

JA1 JP4 JA

JP3

Fig. 3.10-2 Bus connection on terminal units

Terminal units

On the parallel bus PCB P34 – Bus Interface IM0048, of the first and last units (terminal) of the parallel system the Jumpers JP1, JP2, JP3 and JP4 must be inserted.

SGT5000_100-150_RPA-IM0048_03

JB1

JP1

JB2

IM 0048

JP2

JP1

JP4

JP3

JP2

JB

JA1

JP4

JA

JA2

JP3

 

Fig. 3.10-3 Bus connection on intermediate units

Intermediate units

On the parallel bus PCB P34 – Bus Interface IM0048of the intermediate units of the parallel system the Jumpers JP1, JP2, JP3 and JP4 must be removed.

In a parallel system composed of 2 or more units, only the first and last units (having 1 input JA and JB free) have the Jumper JP1, JP2, JP3 and JP4 inserted on parallel bus PCB P34 – Bus Interface IM0048(see Fig. 3.10-2).

OPM_SGS_ISG_M22_M30_0US_V011.doc

31/38

Installation Guide SG Series 225 & 300 kVA

Image 31
Contents SG Series Systems Copyright 2003 by GE Industrial SystemsStart UP and Commissioning Dear CustomerPreface Table of contents Storage InstallationBattery GeneralSafety instructions when working with battery Protective Grounding Terminal Safety symbols and warningsSafety warnings Risk of electric shock PE Earth GND GroundLayout SG Series 225 and 300 KVA LayoutTransport UPS only in upright position Dimensions and weightWeight SG Series 225 and 300 kVA Transport Forklift CraneDelivery Storage of BatteryStorage of the UPS Positioning of the UPS SG Series Place of InstallationCheck -26A of the NEC code for specific requirements Fixing of the UPS cabinet on the floor Openings for input and output cable connections1-5 RPA system disposition Battery locationCFM Ventilation and CoolingUnpacking Take care not to damage the UPS when moving by forkliftPacking material recycling Separate input Rectifier & Bypass recommended Electrical WiringCommon input Rectifier & Bypass Neutral current could be greater than the phase currents Input/output over current protection and wire sizingSee .7.1-1 Phase, 3 wire plus GroundPhase, 4 wire plus Ground Wire positive and negative plus GroundCopper Wire Size Range Wiring Connection1-1 Access to the input / output connections Common Input Rectifier / Bypass Power connection with common input utilityOutput Load Cable section for this connection shall be not less then AWG L3-1 Rectifier Phase C L3-2 Power connection separate input utilityL1-1 Rectifier Phase a L1-2 L2-1 Rectifier Phase B L2-2BR1 Do not insert the Battery Fuses before the commissioning Battery connectionBattery Positive pole of the BatteryManual Bypass, serious damage to the Load could result Setup for SG Series when functioning as frequency converter1 RPA Parallel System Power Wiring of Parallel UnitsParallel Control BUS Connection UPSIntermediate units Terminal unitsInterface IM0048 going to P13 Access to the control bus connectionControl BUS Cable Location Control bus cables connection11-3 Control Bus cable routing and connection Control bus cables routingCustomer Interface Customer InterfaceOr J2 / 1, 2 NO, C, NC Utility Failure 15, 16 Or J2 17, 18 NO, C, NC General Alarm18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm Output potential free contactsGND JP3 EPO Emergency Power Off Input contact38/38