GE 300, 225 manual Dear Customer, Start UP and Commissioning

Page 3

g

GE

Dear Customer,

We thank you for selecting our products and are pleased to count you amongst our very valued customers at GE.

We trust that the use of the SG Series Uninterruptible Power Supply system, developed and produced to the highest standards of quality, will give you complete satisfaction.

Please carefully read the Installation Guide. It contains all the necessary information about the installation of the UPS.

Thank you for choosing GE !

START UP AND COMMISSIONING

A GE Global Services Field Engineer must perform start-up and commissioning of the UPS. Please Contact G.E. Global Services at least two weeks prior to schedule start-up and commissioning at 1-800-637-1738, or by E-mail at gedeservices@indsys.ge.com

Manufactured by:

Distributed in the USA by:

Your service contact:

g

GE Industrial Systems

General Electric Company

6595 Riazzino (Locarno)

Switzerland

OPM_SGS_ISG_M22_M30_0US_V011.doc

3/38

Installation Guide SG Series 225 & 300 kVA

Image 3
Contents SG Series Systems Copyright 2003 by GE Industrial SystemsStart UP and Commissioning Dear CustomerPreface Table of contents Storage InstallationBattery GeneralSafety instructions when working with battery Protective Grounding Terminal Safety symbols and warningsSafety warnings Risk of electric shock PE Earth GND GroundLayout SG Series 225 and 300 KVA LayoutTransport UPS only in upright position Dimensions and weightWeight SG Series 225 and 300 kVA Transport Forklift CraneStorage of Battery DeliveryStorage of the UPS Place of Installation Positioning of the UPS SG SeriesCheck -26A of the NEC code for specific requirements Fixing of the UPS cabinet on the floor Openings for input and output cable connections1-5 RPA system disposition Battery locationCFM Ventilation and CoolingTake care not to damage the UPS when moving by forklift UnpackingPacking material recycling Electrical Wiring Separate input Rectifier & Bypass recommendedCommon input Rectifier & Bypass Neutral current could be greater than the phase currents Input/output over current protection and wire sizingSee .7.1-1 Phase, 3 wire plus GroundPhase, 4 wire plus Ground Wire positive and negative plus GroundCopper Wire Size Range Wiring Connection1-1 Access to the input / output connections Power connection with common input utility Common Input Rectifier / BypassOutput Load Cable section for this connection shall be not less then AWG L3-1 Rectifier Phase C L3-2 Power connection separate input utilityL1-1 Rectifier Phase a L1-2 L2-1 Rectifier Phase B L2-2BR1 Do not insert the Battery Fuses before the commissioning Battery connectionBattery Positive pole of the BatteryManual Bypass, serious damage to the Load could result Setup for SG Series when functioning as frequency converter1 RPA Parallel System Power Wiring of Parallel UnitsParallel Control BUS Connection UPSIntermediate units Terminal unitsInterface IM0048 going to P13 Access to the control bus connectionControl BUS Cable Location Control bus cables connection11-3 Control Bus cable routing and connection Control bus cables routingCustomer Interface Customer InterfaceOr J2 / 1, 2 NO, C, NC Utility Failure 15, 16 Or J2 17, 18 NO, C, NC General Alarm18, 19 Or J2 20, 21 NO, C, NC Acoustic Alarm Output potential free contactsGND JP3 EPO Emergency Power Off Input contact38/38