Briggs & Stratton 30A NEMA 1, 71017 manual System Operation, Load Management

Page 13

OPERATION

SYSTEM OPERATION

Load Management

The number of circuits that can be operated simultaneously during a utility failure will depend on the wattage capacity of your generator. Most optional standby system generators do not have the capacity to handle loads on all transfer switch circuits at the same time.

Review the load management plan developed with the installer. It may be necessary to selectively turn on and off certain loads while using generator power so that necessary appliances can be operated.

Figure 12 — Align Connectors at Generator

Typical Generator

Panel Shown

To transfer from utility power to generator power:

1.Align female socket of connecting cord set with inlet box receptacle’s mating male prongs, as shown in Figure 11. Push cord set connector in and twist clockwise to lock.

Figure 11 — Inlet Box Connection

2.Align male prongs on other end of cord set with mating female terminals of generator’s 240V receptacle, as shown in Figure 12. Push in connector and twist clockwise to lock.

3.Ensure generator is outdoors as described in generator operator’s manual.

4.Start generator following instructions given in the generator operator’s manual.

5.Turn OFF breaker labeled “UTILITY SUPPLY” in transfer switch.

6.Turn OFF all branch circuit breakers in transfer switch.

7.Slide mechanical interlock in transfer switch and turn “GENERATOR SUPPLY” breaker to ON position.

8.Turn ON branch circuit breakers one at a time following your load management plan developed with installer. DO NOT overload generator as described in generator operator’s manual.

To transfer from generator power back to utility power:

1.Turn OFF breaker labeled “GENERATOR SUPPLY” in transfer switch.

2.Turn OFF all branch circuit breakers in transfer switch.

3.Slide mechanical interlock in transfer switch and turn “UTILITY SUPPLY” breaker to ON position.

4.Turn ON branch circuit breakers one at a time.

5.Shut off generator following instructions given in generator operator’s manual.

6.Disconnect connecting cord set from generator and inlet box.

IMPORTANT: ALWAYS unplug cord when not in use and store INDOORS.

13

Image 13
Contents 30A Nema 1 / Nema 3R Table of Contents Contact with live parts can cause electric shock or burn Important Safety InstructionsIntroduction For the Installing Dealer/ContractorFor the Home Owner Owner Orientation Installer ResponsibilitiesEquipment Description Generator CompatibilityItems Not Shipped with Transfer Switch InstallationUnpacking Delivery InspectionMounting Guidelines Typical Switch MountingEssential Circuit Isolation Typical System Diagram with Essential CircuitsPower Wiring Interconnections Main Distribution Panel Inlet Box Inlet Box Connections Connecting Cord SetTo transfer from generator power back to utility power To transfer from utility power to generator powerSystem Operation Load ManagementWhen Calling the Factory SpecificationsUL 1008 Listed Transfer Switch Model Problem Cause Solution TroubleshootingModel 071014 Nema Model 071017 Nema 3R Transfer Switch Service PartsDescription Warranty Period Table DES Matières Avertissement Conservez CES DirectivesRemarque Introduction Au détaillant/à l’entrepreneur procédant à l’installationPour le propriétaire résidentiel Orientation du propriétaire Responsabilités de l’installateurDescription de l’équipement Génératrices compatiblesDéballage InstallationVérification de la livraison Articles non inclus avec le commutateur de transfertDirectives d’assemblage Installation typique de commutateur de transfertIsolation DES Circuits Essentiels Utility ServiceInterconnexions du câblage d’alimentation Principal Boîte d’entrée Cordon de raccordement Raccords de la boite d’entréeGestion des charges Utilisation DU SystèmeSi vous téléphonez au manufacturier SpécificationsCommutateur de transfert homologué UL Modèle Dépannage Problème Cause SolutionRemarques Période DE Garantie Introducción ÍndiceInstrucciones Importantes DE Seguridad Conserve Estas InstruccionesAdvertencia AvisoPara el usuario doméstico IntroducciónPara el distribuidor/técnico instalador Responsabilidades del instalador Orientación al propietarioDescripción del equipo Compatibilidad del generadorDesembalaje InstalaciónInspección en el momento de la entrega Elementos no incluidos con el conectadorFigura 26 Montaje habitual del conectador Directrices de montajeAislamiento DE Circuitos Esenciales Figura 27 Diagrama del sistema con circuitos esencialesInterconexión de los cables de alimentación Figura 28 Diagrama de instalación habitual del conectador Figura 30 Instalación del cuadro de entrada Cuadro de entradaConexión del juego de cables Figura 31 Conexiones del cuadro de entradaGestión de cargas Funcionamiento DEL SistemaPara llamar a la fábrica EspecificacionesInterruptor de transferencia UL Modelo Problema Causa Solución Resolución DE ProblemasPeríodo DE Garantía