American Power Conversion MX28B200 DC System Grounding, Battery Temperature Probe Installation

Page 16

Figure 3.4-1 Battery Cable Connection Locations

Battery Temperature Probe Installation

The optional temperature probe is used to monitor the battery string temperature. To get the most representative temperature measurement, the probe should be placed in contact with a battery cell that is centrally located. The probe should be placed directly in contact with the cell (not the frame surrounding the cell). Generally, the cell cover can be used; be careful not to allow the probe body to touch the terminals. Plug the connector end of the temperature probe into J5 of the control unit backplane card. Route the cable as required positioning the probe on the selected battery cell. Remove the adhesive protection strip from the probe body and press the adhesive side of the probe on the battery cell cover.

3.5. DC SYSTEM GROUNDING

The Positive Battery connection (return bus) for the power plant must be connected to the Master Station Ground. The left end of the return bus provides a pair of threaded 3/8-16 holes on 1 inch (25.4 m) centers for connection of a two-hole lugged cable to the Master Station Ground. Details for this connection should be provided in the site electrical grounding plans.

Page 10

MX28B200/400 –48 VDC User’s Manual (990-9133)

Image 16
Contents VDC Power Systems Page Table of Contents Remote Monitoring Revision History Revision Date DescriptionPage Safety First General PrecautionsPage Introduction General Information2 MX28B Block Diagram How to Use This Manual Page Installation Mechanical InstallationUnpacking Equipment Room / LocationAC Power Connections VentilationPlanning the Battery installation Battery ConnectionsConnecting the Cables Battery Temperature Probe Installation DC System GroundingDC Power Output Over-Current Protection DC Circuit Breakers#10 studs on 5/8 centers DC GMT Fuses Fuse Rating Part NumberInstallation of Circuit Breakers and Fuses Plug-in Circuit Breaker InstallationGMT Fuse Installation Load ConnectionsCable Size Considerations Circuit Breaker Connections 1 to 50 AmpsCircuit Breaker Connections 60-100 Amps 1 Standard lug for 1 to 50A breakersGMT Fuse Connections 2 Adaptor and lugs for 60-100 Amp breakersRJ45 Ethernet Connector Monitoring and Relay Output ConnectionsFront Panel DB9 Connection Smart Cable DB9 ConnectionExternal Alarm Input Connections NO-NC-CRectifier Module Installation Initial Power-Up and CheckoutSystem Parameters Verification/Adjustment Full System Power Up Technical Description OperationRectifier Management System Management System Output CapacitySystem Voltage Control System CurrentBattery Management System Status and Alarm ReportingBattery Charging and Protection DC DistributionControls and Indicators Battery Temperature CompensationBattery/Load Low Voltage Disconnect Front Panel User InterfaceMX28B Status Alarms System Modules Batt PIN OEM Parameter Locations, Descriptions, and Default Values Batt Disc Alm m+ MinorBatt Disc Thr m+ 10 aCir Bkr 48VCir Bkr 1 Alm m+ MajorFW Version 000189GMT 1 Alm GMT 8 AlmEnable LVD ResetIn-Rly 1 Alm IgnoreOEM S Offset Out-Rly 1 Alm m+Out-Rly 6 Alm m+ Out-RlyRectFailComm MinRect Cfg Alm Rect CL AlmDisable Rect 1 FFRect 1 RFA Rect RFA AlmSys LT Thr Sys LV AlmSys LV Thr 50.00SYS MS System Module SET-ALM Setup DA Control Unit Menu StructureV e l C o n d L e v e l I r d L e v e l U r t h L e v e l SYS Sysin AM Info Modgmt LM Alias GMT MOD Modlvd Front Panel LED Indicators Alarm Outputs Output Relays External Alarm Inputs Input RelaysPage Command and Monitoring Protocol Remote MonitoringDescription Physical ConnectionsPage Specifications AC Input1MRF28H54BV Rectifiers 1MRF28H54BV50 RectifiersRectifiers PscuPower Shelf Control Unit MechanicalMounting Environmental CompliancePage APC Worldwide Customer Support Page Warranty General Provisions