American Power Conversion MX28B200 GMT Fuse Connections, Adaptor and lugs for 60-100 Amp breakers

Page 23

Figure 3.8-2 Adaptor and lugs for 60-100 Amp breakers

GMT Fuse Connections

GMT fuses are only connected to -48VDC if the system has been purchased with the GMT fuse option. This option supplies -48VDC to lugs on the interface card through #6 AWG power cables controlled by a 50 Amp circuit breaker located in circuit breaker Position 1. The 2-hole lugs on both ends of the power cables have #10 holes on 5/8” centers. Connections to the GMT fuses are made at terminal block connectors labeled “F1” through “F8” that are located on the interface card mounted in the top left side of the unit. The connector is sized to accept #12 – #28 AWG wire. Each connector has two positions, labeled “-48V” and “RTN”, for connection of the -48V DC load and load return wires. Refer to Figure 3.8-3for Interface board connections.

Figure 3.8-3 Interface Board

MX28B200/400 –48 VDC User’s Manual (990-9133)

Page 17

Image 23
Contents VDC Power Systems Page Table of Contents Remote Monitoring Revision Date Description Revision HistoryPage General Precautions Safety FirstPage General Information Introduction2 MX28B Block Diagram How to Use This Manual Page Room / Location InstallationMechanical Installation Unpacking EquipmentVentilation AC Power ConnectionsConnecting the Cables Battery ConnectionsPlanning the Battery installation DC System Grounding Battery Temperature Probe InstallationDC Circuit Breakers DC Power Output Over-Current Protection#10 studs on 5/8 centers Fuse Rating Part Number DC GMT FusesPlug-in Circuit Breaker Installation Installation of Circuit Breakers and FusesCircuit Breaker Connections 1 to 50 Amps GMT Fuse InstallationLoad Connections Cable Size Considerations1 Standard lug for 1 to 50A breakers Circuit Breaker Connections 60-100 Amps2 Adaptor and lugs for 60-100 Amp breakers GMT Fuse ConnectionsSmart Cable DB9 Connection RJ45 Ethernet ConnectorMonitoring and Relay Output Connections Front Panel DB9 ConnectionNO-NC-C External Alarm Input ConnectionsInitial Power-Up and Checkout Rectifier Module InstallationSystem Parameters Verification/Adjustment Full System Power Up Rectifier Management OperationTechnical Description System Current System ManagementSystem Output Capacity System Voltage ControlDC Distribution Battery ManagementSystem Status and Alarm Reporting Battery Charging and ProtectionFront Panel User Interface Controls and IndicatorsBattery Temperature Compensation Battery/Load Low Voltage DisconnectMX28B Status Alarms System Modules Batt PIN OEM Parameter Locations, Descriptions, and Default Values 10 a Batt Disc Alm m+Minor Batt Disc Thr m+Major Cir Bkr48V Cir Bkr 1 Alm m+GMT 8 Alm FW Version000189 GMT 1 AlmIgnore EnableLVD Reset In-Rly 1 AlmOut-Rly OEM S OffsetOut-Rly 1 Alm m+ Out-Rly 6 Alm m+Rect CL Alm RectFailCommMin Rect Cfg AlmRect RFA Alm DisableRect 1 FF Rect 1 RFA50.00 Sys LT ThrSys LV Alm Sys LV ThrControl Unit Menu Structure SYS MS System Module SET-ALM Setup DAV e l C o n d L e v e l I r d L e v e l U r t h L e v e l SYS Sysin AM Info Modgmt LM Alias GMT MOD Modlvd Front Panel LED Indicators External Alarm Inputs Input Relays Alarm Outputs Output RelaysPage Physical Connections Command and Monitoring ProtocolRemote Monitoring DescriptionPage 1MRF28H54BV50 Rectifiers SpecificationsAC Input 1MRF28H54BV RectifiersPscu RectifiersMechanical Power Shelf Control UnitMounting Compliance EnvironmentalPage APC Worldwide Customer Support Page General Provisions Warranty