American Power Conversion MX28B200 user manual Table of Contents

Page 3

Table of Contents

1

SAFETY FIRST!

1

 

1.1.

WARNING SYMBOLS

1

 

1.2.

GENERAL PRECAUTIONS:

1

2

INTRODUCTION

3

 

2.1.

GENERAL INFORMATION

3

 

2.2.

HOW TO USE THIS MANUAL

5

3

INSTALLATION

7

 

3.1.

UNPACKING EQUIPMENT

7

 

3.2.

MECHANICAL INSTALLATION

7

 

Room / Location

7

 

Mounting

7

 

Ventilation

8

 

3.3.

AC POWER CONNECTIONS

8

 

3.4.

BATTERY CONNECTIONS

9

 

Planning the Battery installation

9

 

Connecting the Cables

9

 

Battery Temperature Probe Installation

10

 

3.5.

DC SYSTEM GROUNDING

10

 

3.6.

DC POWER OUTPUT OVER-CURRENTPROTECTION

11

 

DC Circuit Breakers

11

 

DC GMT Fuses

13

 

3.7.

INSTALLATION OF CIRCUIT BREAKERS AND FUSES

14

 

Plug-in Circuit Breaker Installation

14

 

GMT Fuse Installation

15

 

3.8.

LOAD CONNECTIONS

15

 

Cable Size Considerations

15

 

Circuit Breaker Connections (1 to 50 Amps)

15

 

Circuit Breaker Connections (60-100 Amps)

16

 

GMT Fuse Connections

17

 

3.9.

MONITORING AND RELAY OUTPUT CONNECTIONS

18

 

Front Panel DB9 Connection

18

 

“Smart” Cable DB9 Connection

18

 

RJ45 Ethernet Connector

18

 

Relay Output Connections

18

 

3.10.

EXTERNAL ALARM INPUT CONNECTIONS

19

 

3.11.

RECTIFIER MODULE INSTALLATION

20

 

3.12.

INITIAL POWER-UP AND CHECKOUT

20

 

3.13.

SYSTEM PARAMETERS VERIFICATION/ADJUSTMENT

21

 

3.14.

FULL SYSTEM POWER UP

22

MX28B200/400 –48 VDC User’s Manual (990-9133)

Page iii

Image 3
Contents VDC Power Systems Page Table of Contents Remote Monitoring Revision Date Description Revision HistoryPage General Precautions Safety FirstPage General Information Introduction2 MX28B Block Diagram How to Use This Manual Page Room / Location InstallationMechanical Installation Unpacking EquipmentVentilation AC Power ConnectionsBattery Connections Planning the Battery installationConnecting the Cables DC System Grounding Battery Temperature Probe InstallationDC Circuit Breakers DC Power Output Over-Current Protection#10 studs on 5/8 centers Fuse Rating Part Number DC GMT FusesPlug-in Circuit Breaker Installation Installation of Circuit Breakers and FusesCircuit Breaker Connections 1 to 50 Amps GMT Fuse InstallationLoad Connections Cable Size Considerations1 Standard lug for 1 to 50A breakers Circuit Breaker Connections 60-100 Amps2 Adaptor and lugs for 60-100 Amp breakers GMT Fuse ConnectionsSmart Cable DB9 Connection RJ45 Ethernet ConnectorMonitoring and Relay Output Connections Front Panel DB9 ConnectionNO-NC-C External Alarm Input ConnectionsInitial Power-Up and Checkout Rectifier Module InstallationSystem Parameters Verification/Adjustment Full System Power Up Operation Technical DescriptionRectifier Management System Current System ManagementSystem Output Capacity System Voltage ControlDC Distribution Battery ManagementSystem Status and Alarm Reporting Battery Charging and ProtectionFront Panel User Interface Controls and IndicatorsBattery Temperature Compensation Battery/Load Low Voltage DisconnectMX28B Status Alarms System Modules Batt PIN OEM Parameter Locations, Descriptions, and Default Values 10 a Batt Disc Alm m+Minor Batt Disc Thr m+Major Cir Bkr48V Cir Bkr 1 Alm m+GMT 8 Alm FW Version000189 GMT 1 AlmIgnore EnableLVD Reset In-Rly 1 AlmOut-Rly OEM S OffsetOut-Rly 1 Alm m+ Out-Rly 6 Alm m+Rect CL Alm RectFailCommMin Rect Cfg AlmRect RFA Alm DisableRect 1 FF Rect 1 RFA50.00 Sys LT ThrSys LV Alm Sys LV ThrControl Unit Menu Structure SYS MS System Module SET-ALM Setup DAV e l C o n d L e v e l I r d L e v e l U r t h L e v e l SYS Sysin AM Info Modgmt LM Alias GMT MOD Modlvd Front Panel LED Indicators External Alarm Inputs Input Relays Alarm Outputs Output RelaysPage Physical Connections Command and Monitoring ProtocolRemote Monitoring DescriptionPage 1MRF28H54BV50 Rectifiers SpecificationsAC Input 1MRF28H54BV RectifiersPscu RectifiersMechanical Power Shelf Control UnitMounting Compliance EnvironmentalPage APC Worldwide Customer Support Page General Provisions Warranty