American Power Conversion MX28B200 user manual Circuit Breaker Connections 60-100 Amps

Page 22

Load Connections should be made as shown in Figure 3.8-1

Figure 3.8-1 Standard lug for 1 to 50A breakers.

NOTE: Load return lugs are connected to the front of the return bus to prevent interfering with the top cover of the unit.

Circuit Breaker Connections (60-100 Amps)

Connections for 60 to 100 amp DC loads are twice as wide as the smaller breakers and therefore require two positions and a circuit breaker adapter kit. The adaptor connects the two output lug positions to one lug. Adaptors are available with studs for #10-32 nuts on 5/8” centers, #10-32 nuts on ¾” centers, or ¼-20 nuts on 1” centers. The adaptor is installed directly above the two positions the circuit breaker is mounted on using #10 screws provided in the kit. The lugs (not included with the kit) fasten on to the adaptor’s studs using nuts and washers provided in the kit.

The load returns connect to the return bus located just above and rearward of the breaker connection points as seen in Figure 2.1-1. The return bus provides 24 sets of threaded #10-32 holes on 5/8” centers and four sets of threaded ¼-20 holes on ¾” centers for connection of two-hole lugs on load return wires.

Load Connections should be made as shown in Figure 3.8-2.

Page 16

MX28B200/400 –48 VDC User’s Manual (990-9133)

Image 22
Contents VDC Power Systems Page Table of Contents Remote Monitoring Revision History Revision Date DescriptionPage Safety First General PrecautionsPage Introduction General Information2 MX28B Block Diagram How to Use This Manual Page Unpacking Equipment InstallationMechanical Installation Room / LocationAC Power Connections VentilationPlanning the Battery installation Battery ConnectionsConnecting the Cables Battery Temperature Probe Installation DC System GroundingDC Power Output Over-Current Protection DC Circuit Breakers#10 studs on 5/8 centers DC GMT Fuses Fuse Rating Part NumberInstallation of Circuit Breakers and Fuses Plug-in Circuit Breaker InstallationCable Size Considerations GMT Fuse InstallationLoad Connections Circuit Breaker Connections 1 to 50 AmpsCircuit Breaker Connections 60-100 Amps 1 Standard lug for 1 to 50A breakersGMT Fuse Connections 2 Adaptor and lugs for 60-100 Amp breakersFront Panel DB9 Connection RJ45 Ethernet ConnectorMonitoring and Relay Output Connections Smart Cable DB9 ConnectionExternal Alarm Input Connections NO-NC-CRectifier Module Installation Initial Power-Up and CheckoutSystem Parameters Verification/Adjustment Full System Power Up Technical Description OperationRectifier Management System Voltage Control System ManagementSystem Output Capacity System CurrentBattery Charging and Protection Battery ManagementSystem Status and Alarm Reporting DC DistributionBattery/Load Low Voltage Disconnect Controls and IndicatorsBattery Temperature Compensation Front Panel User InterfaceMX28B Status Alarms System Modules Batt PIN OEM Parameter Locations, Descriptions, and Default Values Batt Disc Thr m+ Batt Disc Alm m+Minor 10 aCir Bkr 1 Alm m+ Cir Bkr48V MajorGMT 1 Alm FW Version000189 GMT 8 AlmIn-Rly 1 Alm EnableLVD Reset IgnoreOut-Rly 6 Alm m+ OEM S OffsetOut-Rly 1 Alm m+ Out-RlyRect Cfg Alm RectFailCommMin Rect CL AlmRect 1 RFA DisableRect 1 FF Rect RFA AlmSys LV Thr Sys LT ThrSys LV Alm 50.00SYS MS System Module SET-ALM Setup DA Control Unit Menu StructureV e l C o n d L e v e l I r d L e v e l U r t h L e v e l SYS Sysin AM Info Modgmt LM Alias GMT MOD Modlvd Front Panel LED Indicators Alarm Outputs Output Relays External Alarm Inputs Input RelaysPage Description Command and Monitoring ProtocolRemote Monitoring Physical ConnectionsPage 1MRF28H54BV Rectifiers SpecificationsAC Input 1MRF28H54BV50 RectifiersRectifiers PscuPower Shelf Control Unit MechanicalMounting Environmental CompliancePage APC Worldwide Customer Support Page Warranty General Provisions