American Power Conversion PD80KL6FK1-M, PD80KG6FK1-M Total Power Off, Emergency Power Off EPO

Page 11

Safety

Total Power Off

1.Set the Symmetra PX UPS System Enable switch to Off.

2.Set the DC Disconnect breaker of each Battery Enclosure to Off.

3.Set the PDU Main Input (A) switch to Off.

4.If applicable, set the PDU Bypass Input (B) switch to Off

5.If applicable, set the PDU Cross Tie Output (X) breaker to Off.

6.Set the upstream utility power circuit breaker(s) to Off.

7.Disconnect the batteries in the Battery Enclosure by pulling them out to the red disconnect line.

DANGER—Risk of Electric Shock!

Electrical Hazard

Hazardous, live parts may exist inside the PDU because of the Symmetra PX UPS inverter even when the AC power is disconnected. Test any electrical parts before touching them.

Emergency Power Off (EPO)

Hazardous voltage from the branch circuit must be isolated from the 24VAC, 24VDC, and contact closure. 24VAC and 24VDC are considered Class 2 circuits as defined in Article 725 of the National Electrical Code (NFPA 70) and Section 16 of the Canadian Electrical Code (C22.1).

A Class 2 circuit is a source having limited voltage and energy capacity as follows:

a.If an Inherently Limited Power Source, voltage and energy are limited to less than 30VAC, less than 30VDC, and 8A.

b.If not an Inherently Limited Power Source, voltage and energy are limited to less than 30VAC, less than 60VDC, 250VA, and the current is limited to 1000/Vmax. The fuse is limited to 5A if less than 20VAC or 20VDC, or 100/Vmaximum if less than 30VAC or 60VDC.

If you choose to use a 24VAC, 24VDC, or contact closure connection to the EPO, use one of the following UL-listed wire types:

CL2 Class 2 cable for general purpose use

CL2P Plenum cable for use in ducts, plenums, and other space used for environmental air

CL2R Riser cable for use in a vertical run shaft from floor to floor

CL2X Limited Use cable for use in dwellings and for use in a raceway

For installation in Canada, the cable should be CSA Certified, type ELC (extra-low-voltage control cable).

If you do not use a CL2 cable, route the EPO wiring in conduit that does not contain any branch circuit wiring.

80kW InfraStruXure PDU—Operation and Configuration

3

Image 11
Contents 80kW InfraStruXure PDU Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents System Operation Specifications Product Information Overview SafetySafety symbols used in this manual Cross-reference symbols used in this manualMaintenance performed while the PDU is receiving input power Installation/MaintenanceEmergency Power Off EPO Total Power OffEMI InfraStruXure PDU Components OverviewPDU front view exterior Front view interior Front view door open  Wraparound Maintenance bypass Panel-Rear view interior PDU monitoring unit   User connection platePage        PDU Display InterfaceNavigating through screens Top-level status screensTop-level menu screen Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Open or Closed Contacts ScreenOverview Input ContactsPDU Display Interface How to connect contacts to the PDU monitoring unit Cross Tie Breakers ScreenMain Input Bypass InputClear Log Alarms ScreenNew Logged Items Entire LogVoltage Limits Alarm SetupAlarm Beeper Loading LimitsAlarm Condition Explanation Message When Condition Cleared PDU AlarmsBranch Ckt Limits Panel ScreenBranch Ckt Loading Distribution panel Panel ConfigurationGlobal Panel Config Date/Time Config ScreenSystem Password System/NetworkOutput Config Electrical ConfigInput Config System ID Factory DefaultsFirmware Updates Manufacturer DataSystem Operation How to Transfer the UPS into Maintenance Bypass OperationSystem Operation System Operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort Set the UPS System Enable switch to the OFF position How to Ensure Total Power OffSystem Operation How to Apply Power to the System PowerView RM Rev 000 English Please wait Top-Level Status Screen System Operation Network management interfaces Communication ConfigurationInfraStruXure PDU Management Options InfraStruXure ManagerConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 80kW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsCircuit Breakers Power CablesPDU Orderable Part List 30A, 3-wire power cables Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU or RDP Customizing and Updating the PDU Testing the EPO wiring and switches How to Test the EPO SwitchSafety warnings Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit Upgrading the PDU monitor processor How to Download Firmware UpgradesDownloading firmware upgrades from a local computer Xmodem 80kW InfraStruXure PDU SpecificationsPD80F6FK1-M PD80G6FK1-M PD80L6FK1-M PD80F6FK1-M PD80G6FK1-M PD80L6FK1-M Page Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceChanges by page number AppendixChanges in This Manual General ChangesPage Index 80kW InfraStruXure PDU-Operation and Configuration UPS Page Page Page Page APC Worldwide Customer Support