System Operation
5. Open (turn OFF) the XR Battery Enclosure DC Disconnect circuit breaker.
6. Open (turn OFF) the Q1 circuit breaker on the PDU.
7.If applicable, open (turn OFF) the PDU Q10 Bypass Input (B) switch.
The UPS is now in maintenance bypass operation.
80kW InfraStruXure | 33 |