American Power Conversion PD80KF6FK1-M manual Top-level status screens, Top-level menu screen

Page 22

PDU Display Interface

Top-level status screens

After system start-up, the display interface displays a brief start-up screen and then scrolls automatically and continuously through four screens of basic status information. Press the Up and Down arrow keys to interrupt the automatic scrolling if you wish to view a specific status screen.

 

 

 

Volts In

Volts Out

L1-2: 000

L1: 000

L2-3: 000

L2: 000

L3-1: 000

L3: 000

 

 

 

 

Total Output Loading

kW:

000

PF: 000

kVA:

000

%LD: 000

Freq:

00.0

 

 

 

 

 

 

 

Load Current

Neut:000

L1: 000

L2:

000

Gnd: 000

L3:

000

 

 

 

Active Alarm: 01of11

Input Transformer

Temperature Too High

Top-level menu screen

On any top-level status screen, press the ENTER key to open the top-level menu screen.

 

 

 

 

 

 

Load-Meter

Alarms

 

 

Volt-Meter

Panel

 

 

Contacts

Config

 

 

Breakers

Help

 

 

 

 

If the display interface is inactive for the time specified as the Time-outsetting, the interface reverts to the initial basic monitoring screens.

Note

For descriptions of the top-level menu choices, see the individual sections starting on page 16.

Navigating through screens

To open any screen, press the Up and Down arrow keys until the selector arrow ( rests next to your desired selection. Press the ENTER key to view the selected screen.

 

 

 

 

 

 

Load-Meter

Alarms

 

 

-Meter

Panel

 

 

Breakers

Config

 

 

Help

 

 

 

 

Contacts In: 02of04

Name: User Switch #2

Normal: Open

Open

When configuring settings, press the Up and Down arrow keys until the selector arrow ( rests next to the setting you want to change, and press the ENTER key. If the setting is a list of choices, an input arrow ( will appear next to the setting. Press the Up and Down arrow keys until your desired change is listed. Press the ENTER key to select the setting.

Contacts In: 02of04

Name: User Switch #2

Normal:Open

Status: Open

14

80kW InfraStruXure PDU—Operation and Configuration

Image 22
Contents 80kW InfraStruXure PDU Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents System Operation Specifications Product Information Cross-reference symbols used in this manual SafetySafety symbols used in this manual OverviewInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsPDU front view exterior Front view interior  Wraparound Maintenance bypass Panel- Front view door openRear view interior PDU monitoring unit User connection plate  Page PDU Display Interface       Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Input Contacts Contacts ScreenOverview Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Bypass Input Breakers ScreenMain Input Cross TieEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Alarm SetupAlarm Beeper Voltage LimitsPDU Alarms Alarm Condition Explanation Message When Condition ClearedBranch Ckt Loading Panel ScreenBranch Ckt Limits Panel Configuration Distribution panelGlobal Panel Config System/Network Config ScreenSystem Password Date/TimeInput Config Electrical ConfigOutput Config Manufacturer Data Factory DefaultsFirmware Updates System IDHow to Transfer the UPS into Maintenance Bypass Operation System OperationSystem Operation System Operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Set the UPS System Enable switch to the OFF positionSystem Operation How to Apply Power to the System PowerView RM Rev 000 English Please wait Top-Level Status Screen System Operation InfraStruXure Manager Communication ConfigurationInfraStruXure PDU Management Options Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Snmp FTP and SCP 80kW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List Power CablesCircuit Breakers 30A, 3-wire power cables Add a power cable to the PDU or RDP How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU How to Test the EPO Switch Testing the EPO wiring and switchesSafety warnings Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit Downloading firmware upgrades from a local computer How to Download Firmware UpgradesUpgrading the PDU monitor processor Xmodem Specifications 80kW InfraStruXure PDUPD80F6FK1-M PD80G6FK1-M PD80L6FK1-M PD80F6FK1-M PD80G6FK1-M PD80L6FK1-M Page InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCGeneral Changes AppendixChanges in This Manual Changes by page numberPage Index 80kW InfraStruXure PDU-Operation and Configuration UPS Page Page Page Page APC Worldwide Customer Support