American Power Conversion PD80KF6FK1-M, PD80KG6FK1-M, PD80KL6FK1-M manual Front view door open

Page 16

Overview

Front view (door open)

Wraparound

maintenance bypass

 

 

panel—The

maintenance bypass

 

 

panel has three

 

 

circuit breakers that

 

 

allow the UPS to be

 

 

 

 

electrically isolated

 

 

from the main power

 

 

source, while

 

 

maintaining the

 

 

power panels. The

 

 

input circuit breaker

 

 

is labeled Q1, the

 

 

output circuit breaker

 

 

 

 

is labeled Q2, and the

 

 

maintenance bypass

 

 

circuit breaker is

 

 

labeled Q3. The label

 

 

on the maintenance

 

 

bypass panel of the

 

 

PDU illustrates the

 

 

power flow, and the

 

 

H2 and H3 LEDs

 

 

indicate when it is

 

 

safe to operate the Q2

 

 

and Q3 circuit

 

 

breakers.

 

 

Optional bottom-feed cable access—These knockouts are for bottom-feed power cables and RDP cables. If you ordered a PDU to accommodate under-floor wiring, your power cables for equipment racks and RDPs will exit the PDU from these cable access holes.

UPS input and output cables—The cables that connect the PDU to the UPS are shipped coiled on the floor of the PDU. The input cables consist of 5 wires: 3 phases, 1 neutral, and one ground. The output cable consist of 4 wires: 3 phases and 1 neutral. The bypass cables consist of 4-wires: 3 phases and one neutral. Each wire is labeled and corresponds to a lug on the Symmetra PX UPS bus bars. During installation, the Field Service Engineer will connect the PDU to the UPS.

User connection plate—The user connection plate is connected to the PDU monitoring unit, and provides easy access to the input contacts, relay outputs, network, and EPO connections. Make connections from inside the enclosure, and route wires through the knockout provided on the plate. See “User connection plate” on page 11 for a more detailed description.

8

80kW InfraStruXure PDU—Operation and Configuration

Image 16
Contents 80kW InfraStruXure PDU Page How to find updates to this manual About This ManualAudience Companion manualsPage Contents System Operation Specifications Product Information Safety Safety symbols used in this manualCross-reference symbols used in this manual OverviewInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsPDU front view exterior Front view interior  Wraparound Maintenance bypass Panel- Front view door openRear view interior PDU monitoring unit User connection plate  Page PDU Display Interface       Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Contacts Screen OverviewInput Contacts Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Breakers Screen Main InputBypass Input Cross TieAlarms Screen New Logged ItemsEntire Log Clear LogAlarm Setup Alarm BeeperLoading Limits Voltage LimitsPDU Alarms Alarm Condition Explanation Message When Condition ClearedBranch Ckt Loading Panel ScreenBranch Ckt Limits Panel Configuration Distribution panelGlobal Panel Config Config Screen System PasswordSystem/Network Date/TimeInput Config Electrical ConfigOutput Config Factory Defaults Firmware UpdatesManufacturer Data System IDHow to Transfer the UPS into Maintenance Bypass Operation System OperationSystem Operation System Operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Set the UPS System Enable switch to the OFF positionSystem Operation How to Apply Power to the System PowerView RM Rev 000 English Please wait Top-Level Status Screen System Operation Communication Configuration InfraStruXure PDU Management OptionsInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Snmp FTP and SCP 80kW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List Power CablesCircuit Breakers 30A, 3-wire power cables Add a power cable to the PDU or RDP How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU How to Test the EPO Switch Testing the EPO wiring and switchesSafety warnings Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit Downloading firmware upgrades from a local computer How to Download Firmware UpgradesUpgrading the PDU monitor processor Xmodem Specifications 80kW InfraStruXure PDUPD80F6FK1-M PD80G6FK1-M PD80L6FK1-M PD80F6FK1-M PD80G6FK1-M PD80L6FK1-M Page InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCAppendix Changes in This ManualGeneral Changes Changes by page numberPage Index 80kW InfraStruXure PDU-Operation and Configuration UPS Page Page Page Page APC Worldwide Customer Support