How to Apply Power to the System
This procedure instructs on how to apply power to a system that has already been installed. For initial
1. Set the upstream utility, and, if applicable, the bypass input and utility circuit breaker to ON.
A B
1.Set the Main Input (A) switch on the PDU to ON.
2. Set the Q1 circuit breaker on the PDU to ON to apply power to the UPS.
3. If applicable, set the Q10 Bypass Input (B) switch on the PDU to ON.
80kW InfraStruXure | 39 |