Overview

PDU monitoring unit

This connection provides the input power for the PDU monitoring unit. The power is supplied by the monitoring unit circuit breaker on the front of the PDU. If the panel is on, and the monitoring unit circuit breaker is closed, the monitoring unit is powered.

Connectspower. to sensors monitoring values such as voltage, current, and

Digital input sensing for monitoring such as circuit breaker status, transformer temperature, fans, etc.

The Display port (RJ-45) connects the PDU monitoring unit to the PDU display interface.

The Power LED indicates wether the monitoring unit is receiving power from the AC output of the UPS. If the UPS is powered off, the LED remains lit—the EPO function is still available, however the monitoring unit is not powered.

Use the Console port (DB-9) to connect a laptop computer to the monitoring unit using an appropriate communication cable (APC part number 940-0103). This port is used to configure items relating to servicing the PDU.

EPO DIP switches configure the EPO input for the type of EPO switch that is connected—Normally Open (NO) or Normally Closed (NC).

When the EPO Arm/Test rocker is in the Test position, engaging the EPO switch will not cause the load to be powered off. When the rocker is in the Armed position, engaging the EPO switch will cause the PDU’s Main Input switch and the Symmetra PX UPS to be switched OFF. See “Testing the EPO wiring and switches” on page 60 for more information on testing the EPO switch.

The EPO Armed LED is green when the rocker is in the Armed position. The LED is dark when the rocker is in the Test position.

The EPO Tripped LED is red when the EPO switch is engaged (the EPO button is pressed), regardless of the state of the EPO Arm/Test rocker.

8 8 5- 22 8 8

 

 

N TA C TS

 

 

 

 

C O

 

 

 

 

 

 

 

U S ER / E PO

 

 

 

 

 

 

 

 

 

 

S

1

 

 

 

P

 

1 4

 

 

U

2

1 5

 

 

 

TO

4 3

1 6

 

 

 

6

1 7

 

 

 

5

 

 

 

 

 

 

1 8

 

 

 

 

 

1

 

 

 

 

7

 

 

 

 

 

 

2 0

 

 

 

 

8

 

 

 

 

 

 

2 1

 

 

 

 

9

 

 

 

 

 

 

2 2

 

 

 

LIN K RX/TX

1 0

2 3

 

 

 

11

 

 

 

 

1 2

2 4

 

 

 

 

2 5

 

 

ETN O R K

=10G R N 001= O R N

 

 

1 3

 

 

 

T

STATU S

AY

 

R E

 

ISP L

 

 

 

TR

D

 

 

 

 

 

 

 

 

 

 

ER

 

 

 

PO

 

A RM ED

 

 

 

 

 

R T

 

 

EP

CN

232-SR LEOSNOPO

N8-0069-1

 

 

TE ST

 

 

 

N O

C

 

 

 

 

 

 

 

The Reset button resets the network processor; it does not reset the PDU or the PDU monitoring unit.

Connect to the InfraStruXure Manager through the network port.

The To UPS port connects the PDU monitoring unit to the Maintenance Bypass/PCB board and the EPO board inside the Symmetra PX UPS. This port is connected to wire harnesses secured inside the PDU that are connected to the Symmetra PX UPS during installation of the system.

The optional User/EPO Contacts port is connected to wire harnesses that connect to the User Connection Plate in the roof (or floor) of the PDU. The port allows for relay outputs (4), input contacts (4), and an EPO input (1). See “How to connect contacts to the PDU monitoring unit” on page 20 and “Testing the EPO wiring and switches” on page 60 for more information.

 

The branch current monitoring boards connect to the Branch Current Monitor ports (RJ-11). These

 

ports are on the top side of the PDU monitoring unit, and are labeled on the face of the unit. Each port

 

corresponds to a section of circuit breakers on the PDU distribution circuit breaker panel:

Note

upper left=[01..41]; upper right=[02..42]; lower left=[43..83]; lower right=[44..84].

10

80kW InfraStruXure PDU—Operation and Configuration

Image 18
Contents 80kW InfraStruXure PDU Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents System Operation Specifications Product Information Cross-reference symbols used in this manual SafetySafety symbols used in this manual OverviewInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsPDU front view exterior Front view interior  Wraparound Maintenance bypass Panel- Front view door openRear view interior PDU monitoring unit User connection plate  Page PDU Display Interface       Top-level status screens Top-level menu screenNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Input Contacts Contacts ScreenOverview Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Bypass Input Breakers ScreenMain Input Cross TieEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Alarm SetupAlarm Beeper Voltage LimitsPDU Alarms Alarm Condition Explanation Message When Condition ClearedPanel Screen Branch Ckt LoadingBranch Ckt Limits Panel Configuration Distribution panelGlobal Panel Config System/Network Config ScreenSystem Password Date/TimeElectrical Config Input ConfigOutput Config Manufacturer Data Factory DefaultsFirmware Updates System IDHow to Transfer the UPS into Maintenance Bypass Operation System OperationSystem Operation System Operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Set the UPS System Enable switch to the OFF positionSystem Operation How to Apply Power to the System PowerView RM Rev 000 English Please wait Top-Level Status Screen System Operation InfraStruXure Manager Communication ConfigurationInfraStruXure PDU Management Options Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguring the Network Management Interface Configuration OverviewConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Use apc for the User Name and PasswordRemote access to the control console Use apc for both User Name and Password Control consoleChoose Network from the Control Console menu Web interface Snmp FTP and SCP 80kW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPower Cables PDU Orderable Part ListCircuit Breakers 30A, 3-wire power cables How to Add Circuit Breakers and Power Cables Add a power cable to the PDU or RDPAdd a circuit breaker on the PDU Customizing and Updating the PDU How to Test the EPO Switch Testing the EPO wiring and switchesSafety warnings Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Download Firmware Upgrades Downloading firmware upgrades from a local computerUpgrading the PDU monitor processor Xmodem Specifications 80kW InfraStruXure PDUPD80F6FK1-M PD80G6FK1-M PD80L6FK1-M PD80F6FK1-M PD80G6FK1-M PD80L6FK1-M Page InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCGeneral Changes AppendixChanges in This Manual Changes by page numberPage Index 80kW InfraStruXure PDU-Operation and Configuration UPS Page Page Page Page APC Worldwide Customer Support