Alarm Map: 01 of 04 [Vo, By, C4]
Map: Input Voltage Apply Now

PDU Display Interface

Alarm Relay Map Configure the relay outputs, using the Alarm Relay Map.

Each Alarm Map corresponds to an output relay. For

example, Alarm Map 01of04 corresponds to the first of four relay outputs. The second line, in brackets [ ], lists the items that you have selected to map to the selected relay. The third line allows you to select the alarms to which you want to map the relay:

Any Load (L)—Maps to over- or under-current alarms for circuit breaker panels and branch circuits.

Overload (O)—Maps to over-current alarms for circuit breaker panels, branch circuits, and SYSGND.

Input Voltage (Vi)—Maps to any input voltage alarm.

Output Voltage (Vo)—Maps to any output voltage alarm.

PDU in Bypass (By)—Mapping this option will cause the output relay to actuate when the Q3 breaker is closed.

Any Breaker (Br)—Mapping this option will cause the output relay to actuate when the input, bypass input (Q10), or cross-tie output breaker is not in its normal state.

Contacts 1–4(C1, C2, C3, C4)—Maps to the input contact alarms.

Before exiting the screen, to save your changes, select the Apply

Now option on the bottom line of the screen.

.

80kW InfraStruXure PDU—Operation and Configuration

19

Image 27
Contents 80kW InfraStruXure PDU Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents System Operation Specifications Product Information Overview SafetySafety symbols used in this manual Cross-reference symbols used in this manualMaintenance performed while the PDU is receiving input power Installation/MaintenanceEmergency Power Off EPO Total Power OffEMI InfraStruXure PDU Components OverviewPDU front view exterior Front view interior Front view door open  Wraparound Maintenance bypass Panel-Rear view interior PDU monitoring unit   User connection platePage        PDU Display InterfaceTop-level status screens Top-level menu screenNavigating through screens Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Open or Closed Contacts ScreenOverview Input ContactsPDU Display Interface How to connect contacts to the PDU monitoring unit Cross Tie Breakers ScreenMain Input Bypass InputClear Log Alarms ScreenNew Logged Items Entire LogVoltage Limits Alarm SetupAlarm Beeper Loading LimitsAlarm Condition Explanation Message When Condition Cleared PDU AlarmsPanel Screen Branch Ckt LoadingBranch Ckt Limits Distribution panel Panel ConfigurationGlobal Panel Config Date/Time Config ScreenSystem Password System/NetworkElectrical Config Input ConfigOutput Config System ID Factory DefaultsFirmware Updates Manufacturer DataSystem Operation How to Transfer the UPS into Maintenance Bypass OperationSystem Operation System Operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort Set the UPS System Enable switch to the OFF position How to Ensure Total Power OffSystem Operation How to Apply Power to the System PowerView RM Rev 000 English Please wait Top-Level Status Screen System Operation Network management interfaces Communication ConfigurationInfraStruXure PDU Management Options InfraStruXure ManagerConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConfiguring the Network Management Interface Configuration OverviewConnect the InfraStruXure PDU to your network Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Use apc for the User Name and PasswordRemote access to the control console Use apc for both User Name and Password Control consoleChoose Network from the Control Console menu Web interface Snmp FTP and SCP 80kW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsPower Cables PDU Orderable Part ListCircuit Breakers 30A, 3-wire power cables How to Add Circuit Breakers and Power Cables Add a power cable to the PDU or RDPAdd a circuit breaker on the PDU Customizing and Updating the PDU Testing the EPO wiring and switches How to Test the EPO SwitchSafety warnings Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Download Firmware Upgrades Downloading firmware upgrades from a local computerUpgrading the PDU monitor processor Xmodem 80kW InfraStruXure PDU SpecificationsPD80F6FK1-M PD80G6FK1-M PD80L6FK1-M PD80F6FK1-M PD80G6FK1-M PD80L6FK1-M Page Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceChanges by page number AppendixChanges in This Manual General ChangesPage Index 80kW InfraStruXure PDU-Operation and Configuration UPS Page Page Page Page APC Worldwide Customer Support