American Power Conversion PD80KL6FK1-M manual 80kW InfraStruXure PDU-Operation and Configuration

Page 86

F

Factory defaults, resetting the, 30

Firmware updates, how to download, 65

Front view door open, 8 exterior, 6 interior, 7

FTP access to the PDU, 53 Fuses, 7

G

Global Panel Config, 27 Ground bar, location of, 59 Ground lugs, 7

Ground wire, location of, 59

I

InfraStruXure Manager

as a PDU management option, 43 configuration, 44

connect the InfraStruXure PDU to the, 44

Load test ports, 9

Local access to the control console, 49 Lock-out bracket, 6

M

Main input switch, 7 Maintenance bypass operation

returning from, 3436

UPS, transferring into, 3133 Maintenance bypass panel, 8

Maintenance performed while the PDU is receiving input power, 2

Maintenance warnings, 2 Management options, 4354

InfraStruXure Manager, 43

Network management interfaces, 43

Manufacturer data, 30

MCCB subfeed circuit breaker, 7 Monitoring unit

circuit breakers, 7 connecting contacts to, 20, 64 detailed description, 10 location, 9

system, applying power to, 3942 total power off, ensuring, 3738

Orderable part list, 56 Output cables, for UPS, 8

P

Panel Configuration, 26 Panel screen, 2527 Part List, 56 Password

configure, 28 protected-screens,15 recovering from a lost, 54

Performance specifications, 67 Ports

branch current monitor, 10 load test, 9

Power cables

adding to the PDU, 5859 bottom-feed access, 78 location, 6

sub-feed,6

UPS input and output, 8

InfraStruXure Standard Warranty, 71 Input cables, for UPS, 8

Input contacts connecting, 6364 connection location, 11 information about, 18

Input power, maintenance performed while the PDU is receiving, 2

Input transformer, 9 Installation warnings, 2

K

Keys, for navigation, 13

L

LCD, 13 LEDs

EPO specific, 60

on display interface, 13 on monitoring unit, 10

Leveling feet, 6 Life-support policy, 73 Load meter screen, 16 Load on LED, 13

N

Navigation keys, 13 through screens, 14

NetShelter VX enclosure, 5 Network address configuration, 28 Network management interface

accessing on a configured PDU, 51 configuration, 4554

recovering from a lost password, 54

Network port, on monitoring unit, 10 Neutral bar, location of, 59 Neutral wire, location of, 59

O

Operation, 3142

maintenance bypass, returning from, 3436

maintenance bypass, transferring the UPS into, 3133

R

Rack distribution panel, 5 Rear view, interior, 9 Relay outputs

connecting, 6364 connection location, 11 information about, 18 specifications, 68

Remote access to the control console, 49

Reset button, on monitoring unit, 10 Rocker switch, arm/test, 60

S

Safety, 14

symbols used in this manual, 1 warnings, 24

SCP access to the PDU, 53

Screens. See display interface or individual screen name.

Service, obtaining, 74 Shielding troughs, 6 SNMP access to the PDU, 52

78

80kW InfraStruXure PDU—Operation and Configuration

Image 86
Contents 80kW InfraStruXure PDU Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents System Operation Specifications Product Information Cross-reference symbols used in this manual SafetySafety symbols used in this manual OverviewInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsPDU front view exterior Front view interior  Wraparound Maintenance bypass Panel- Front view door openRear view interior PDU monitoring unit User connection plate  Page PDU Display Interface       Navigating through screens Top-level status screensTop-level menu screen Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Input Contacts Contacts ScreenOverview Open or ClosedPDU Display Interface How to connect contacts to the PDU monitoring unit Bypass Input Breakers ScreenMain Input Cross TieEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Alarm SetupAlarm Beeper Voltage LimitsPDU Alarms Alarm Condition Explanation Message When Condition ClearedBranch Ckt Limits Panel ScreenBranch Ckt Loading Panel Configuration Distribution panelGlobal Panel Config System/Network Config ScreenSystem Password Date/TimeOutput Config Electrical ConfigInput Config Manufacturer Data Factory DefaultsFirmware Updates System IDHow to Transfer the UPS into Maintenance Bypass Operation System OperationSystem Operation System Operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort How to Ensure Total Power Off Set the UPS System Enable switch to the OFF positionSystem Operation How to Apply Power to the System PowerView RM Rev 000 English Please wait Top-Level Status Screen System Operation InfraStruXure Manager Communication ConfigurationInfraStruXure PDU Management Options Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 80kW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUCircuit Breakers Power CablesPDU Orderable Part List 30A, 3-wire power cables Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU or RDP Customizing and Updating the PDU How to Test the EPO Switch Testing the EPO wiring and switchesSafety warnings Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit Upgrading the PDU monitor processor How to Download Firmware UpgradesDownloading firmware upgrades from a local computer Xmodem Specifications 80kW InfraStruXure PDUPD80F6FK1-M PD80G6FK1-M PD80L6FK1-M PD80F6FK1-M PD80G6FK1-M PD80L6FK1-M Page InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCGeneral Changes AppendixChanges in This Manual Changes by page numberPage Index 80kW InfraStruXure PDU-Operation and Configuration UPS Page Page Page Page APC Worldwide Customer Support