How to Connect User Input Contacts and Relay Outputs to the PDU User Connection Plate

Overview

Make contact closure connections (NO or NC) at the user connection plate to monitor dry contacts. You can make eight connections—four input contacts and four relay outputs.

The figure at the right shows the location of the user connection plate on the roof of the PDU enclosure.

You can make connections from inside the enclosure, or you can remove the user connection plate and make your connections.

Remove the plate using a Phillips or standard screwdriver to loosen the two captive screws. Use the knockout in the plate to route cables to and from the user connection plate. If you remove the plate, make sure that you do not disturb the existing connections.

USER INTERFACE

© 2001 APC MADE IN USA

1

2

3

4

 

 

Contact Outputs

 

 

Contact Inputs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ATS 0 ATS 1 ATS 2

ATSEN

+ EPO 24V EPO AC/DC Contact

80kW InfraStruXure PDU—Operation and Configuration

63

Image 71
Contents 80kW InfraStruXure PDU Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents System Operation Specifications Product Information Overview SafetySafety symbols used in this manual Cross-reference symbols used in this manualMaintenance performed while the PDU is receiving input power Installation/MaintenanceEmergency Power Off EPO Total Power OffEMI InfraStruXure PDU Components OverviewPDU front view exterior Front view interior Front view door open  Wraparound Maintenance bypass Panel-Rear view interior PDU monitoring unit   User connection platePage        PDU Display InterfaceNavigating through screens Top-level status screensTop-level menu screen Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Open or Closed Contacts ScreenOverview Input ContactsPDU Display Interface How to connect contacts to the PDU monitoring unit Cross Tie Breakers ScreenMain Input Bypass InputClear Log Alarms ScreenNew Logged Items Entire LogVoltage Limits Alarm SetupAlarm Beeper Loading LimitsAlarm Condition Explanation Message When Condition Cleared PDU AlarmsBranch Ckt Limits Panel ScreenBranch Ckt Loading Distribution panel Panel ConfigurationGlobal Panel Config Date/Time Config ScreenSystem Password System/NetworkOutput Config Electrical ConfigInput Config System ID Factory DefaultsFirmware Updates Manufacturer DataSystem Operation How to Transfer the UPS into Maintenance Bypass OperationSystem Operation System Operation How to Return from Maintenance Bypass Operation Confirm Yes, UPS Load on No, Abort Confirm Yes, UPS into Bypass No, Abort Set the UPS System Enable switch to the OFF position How to Ensure Total Power OffSystem Operation How to Apply Power to the System PowerView RM Rev 000 English Please wait Top-Level Status Screen System Operation Network management interfaces Communication ConfigurationInfraStruXure PDU Management Options InfraStruXure ManagerConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the InfraStruXure PDU to your network Configuring the Network Management InterfaceConfiguration Overview Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleUse apc for the User Name and Password Choose Network from the Control Console menu Use apc for both User Name and PasswordControl console Web interface Snmp FTP and SCP 80kW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsCircuit Breakers Power CablesPDU Orderable Part List 30A, 3-wire power cables Add a circuit breaker on the PDU How to Add Circuit Breakers and Power CablesAdd a power cable to the PDU or RDP Customizing and Updating the PDU Testing the EPO wiring and switches How to Test the EPO SwitchSafety warnings Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit Upgrading the PDU monitor processor How to Download Firmware UpgradesDownloading firmware upgrades from a local computer Xmodem 80kW InfraStruXure PDU SpecificationsPD80F6FK1-M PD80G6FK1-M PD80L6FK1-M PD80F6FK1-M PD80G6FK1-M PD80L6FK1-M Page Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceChanges by page number AppendixChanges in This Manual General ChangesPage Index 80kW InfraStruXure PDU-Operation and Configuration UPS Page Page Page Page APC Worldwide Customer Support