Installing the Power Modules

The vertical column of bays at the left of the frame house the power modules. See Figure 5-5.

Procedure for Power Module Installation

1.Clear all power module bays of debris. Make sure the alignment grooves are clear, and free of obstruction.

Note: The PowerView cable must be held up and out of the way, while a power module is installed in bay “L1.”

Power

Module

Bays

Power

Module

Fig 5-5Location of the Power Module Bays

2.There are two alignment grooves molded into the bottom of the power module bay. These correspond with runners that are molded into the bottom of the power module.

See figure 5-6.

Alignment

Grooves

Runners

Fig 5-6Power Module Alignment Grooves and Runners

4.Make sure the alignment grooves and the runners are lined up. Slide the power module into bay. See figure 5-6.

5.To engage the internal connector, slide the power module firmly into the bay. The “drop lock” tabs will fall into place. See figure 5-7.

Drop Lock

Seating Tabs

Fig 5-7Seating Tabs When Module is Properly Installed.

6.Swing the flip latch up and fasten the captive screw into the module. Gently tighten screw until it is firmly in place. DO

NOT overtighten screw.

Note: The flip latch will not engage if the power module is not fully seated into the bay. The flip latch activates a micro switch inside the power module. If the latch is not properly installed, the power module will not function. If after installing the power module, the flip latch will not engage, pull the power module out of the bay, and firmly slide it into place.

Fig 5-8The Power Module Flip Latch

5-3

Image 40
Contents Syminif SYMINIF-PD Symstrf SYMSTRF-PD Radio Frequency Interference 990-7770A Revised 10/97Limited Warranty Life Support PolicyTable of Contents Index Introduction Fig I-2Functional Diagram of a SymmetraTM Thank You SymmetraTM OverviewTheory of Operation Fig I-1MiniFrame and MasterFramePower Processing System Battery SourceControl/User Interface TransformerLoad-Disconnect Mode On-Line Operating ModeFig I-3Load-Disconnect Operating Mode Fig I-4On-Line Operating ModeOn-Battery Operating Mode Bypass Operating ModeFig I-5On-Battery Operating Mode Fig I-6Bypass Operating ModeDefinitions Important InformationSafety Information Symbols Used In This Manual Important Safety InstructionsTech Physical Representation 2An Empty MasterFrame grill covers removed Power Array Frame1A Fully Loaded MiniFrame grill covers removed Powerview User Interface Power ModuleBattery Module Louvered Grill CoversMaintenance Bypass Switch Main Intelligence Module MIMRedundant Intelligence Module RIM Input Circuit BreakerRear View of a Power Array Site Preparation Space and Weight Considerations Transporting Power Array to Installation SiteOperating Conditions BTU OutputSite Preparation Unpacking and Installing Frame Tools Required for Setup Storage of Battery and Power ModulesInitial Inspection Check For DamageMoving Battery & Power Modules Clean-UPRemove Packing Materials Remove the Frame from the PalletWiring Requirements & Procedures SymmetraTM Wiring Input WiringOutput Wiring Repo Switch WiringInput Wiring Specifications Input WiringVoltage Jumper Procedure Input Wiring Procedure 3Removal of Input Hardwiring Panels4Input Wiring Pathway 5Input Hardwiring ConfigurationOutput Wiring Configurations Output WiringOutput Overcurrent Protection 8Output Wiring Configuration for 120V/240V Output Voltages Output Wiring Installation Output Wiring ProcedurePower Distribution Units Optional Grounding Electrode OptionalRemote Emergency Power Off Switch Repo SpecificationsRepo Switch Installation Cable SpecificationsElectrical Wiring Test Electrical Wiring Test/ChecklistContact Closure Repo Switch Connection Vdc Repo Switch Connection16Startup Screen 4Input/Output Measured Voltage MultipliersElectrical Requirements and Procedures Setting Up The Power Array Setup of Power Array Frame Leveling ProcedureRemoving Cover Grills 1Removing Cover Grills from FrameInstalling the Battery Modules Procedure for Battery Module Installation2Location of Battery Module Bays 3Battery Alignment Grooves and RunnersInstalling the Power Modules Procedure for Power Module InstallationInstalling the Main Intelligence Module MIM Installing the Redundant Intelligence Module RIMProcedure for Main Intelligence Module MIM Installation 9Location of the MIM and RIMRemote Placement of the PowerView Installing the PowerView InterfaceWall Mounting the PowerView SmartSlotTM Interface Accessories 13PowerView Wall Mounting TemplateInstallation Test Installation Test/Checklist19Power Status Screen 1SymmetraTM Power Module/Frame Capacities21Power The Load Sequence 20Miscellaneous Status Screen23Initiate a Self-Test Sequence 25Power Down the Load Sequence24Return to On-Line Sequence System Setup PowerView Display PowerView Display Physical Features of the PowerviewPowerView Functions 1The PowerView InterfacePowerView LEDs 1Power Array Display LEDsColor Description Navigation KeysStartup Screen Top-Level Menu ScreenControl StatusSetup AccessoriesDiagnostics LoggingConfiguring & Operating the SymmetraTM Introduction Powering the Power Array1Startup Screen Review Status Conditions Powering the LoadsVoltage Status Screen Power Status Screen Battery Status ScreenLoad With Redundancy Status Screen Perform a Self Test Alarm Threshold Status ScreenMiscellaneous Status Screen Configure Shutdown Parameters Configure AlarmsAlarm Thresholds Selection Screen Switching Audible Alarm Beeper OffReview Diagnostic Information Diagnostics Menu ScreenReview Logging Menu Event Log ScreenModule Replacement Module Replacement Module Failure Alarm IndicatorsTechnical Support and Obtaining a Replacement Module Returning Modules to APCBattery Module Replacement Removing a Battery ModuleInstalling the Replacement Module Replacement Battery Module VerificationRemoving the Power Module Power Module ReplacementReplacement Module Verification Installing the Replacement Main Intelligence Module Installing the Replacement Redundant Intelligence ModuleReplacement Redundant Intelligene Module Verification Replacement MIM VerificationPowerView Display Messages PowerView Message Meaning Corrective Action Start-Up PowerView Message Meaning Corrective Action General Status Min Runtime restoredPowerView Meaning Corrective Action Message Module AlarmFailure ThresholPowerView Meaning Corrective Action Message Bypass FaultPowerView Message Meaning Corrective Action General Fault PowerView Display Messages Index Index SmartSlot accessories Toll free technical support