American Power Conversion SYMINIF-PD, SYMSTRF-PD Setup of Power Array, Frame Leveling Procedure

Page 38

Chapter 5 - System Setup

Setup of Power Array

After the wiring connections have been installed and checked by the electrican, the Power Array is ready for the installation of the battery and power modules. After they are installed, the louvered cover grills are replaced onto the frame, and the PowerView user interface is mounted on the frame.

Frame Leveling Procedure

Position the Power Array so there will be adequate airflow clearance in the front and the rear of the frame. See figure 2-1 in chapter 2. The weight of the Power Array is supported by four 1.5” leveling feet pads. Four metal plates can be placed under each of the leveling feet pads to help displace the weight of the Power Array.

The procedure for leveling the frame is as follows:

1.Hand turn all four leveling feet until the pads make contact with the floor.

2.Use an open-end wrench to extend each of the leveling feet, by turning the hex nut three complete revolutions.

3.Using a torpedo level, adjust the leveling feet until the frame is level.

Removing Cover Grills

The louvered cover grills must be removed before the power and battery modules can be installed. The procedure for re- moving the cover grills is as follows:

Note: Handle covers with care to prevent scratching them.

1.Grasp one of the cover grills by the the side holds that are molded into it. See figure 5-1.

2.Pull the cover straight forward.

3.Cover will unsnap from frame.

4.Remove all cover grills in this manner, and place them to one side.

Fig 5-1Removing Cover Grills from Frame

5-1

Image 38
Contents Syminif SYMINIF-PD Symstrf SYMSTRF-PD Radio Frequency Interference 990-7770A Revised 10/97Limited Warranty Life Support PolicyTable of Contents Index Introduction Theory of Operation Fig I-2Functional Diagram of a SymmetraTMThank You SymmetraTM Overview Fig I-1MiniFrame and MasterFrameControl/User Interface Power Processing SystemBattery Source TransformerFig I-3Load-Disconnect Operating Mode Load-Disconnect ModeOn-Line Operating Mode Fig I-4On-Line Operating ModeFig I-5On-Battery Operating Mode On-Battery Operating ModeBypass Operating Mode Fig I-6Bypass Operating ModeDefinitions Important InformationSafety Information Symbols Used In This Manual Important Safety InstructionsTech Physical Representation 1A Fully Loaded MiniFrame grill covers removed Power Array Frame2An Empty MasterFrame grill covers removed Battery Module Powerview User InterfacePower Module Louvered Grill CoversRedundant Intelligence Module RIM Maintenance Bypass SwitchMain Intelligence Module MIM Input Circuit BreakerRear View of a Power Array Site Preparation Operating Conditions Space and Weight ConsiderationsTransporting Power Array to Installation Site BTU OutputSite Preparation Unpacking and Installing Frame Initial Inspection Tools Required for SetupStorage of Battery and Power Modules Check For DamageRemove Packing Materials Moving Battery & Power ModulesClean-UP Remove the Frame from the PalletWiring Requirements & Procedures Output Wiring SymmetraTM WiringInput Wiring Repo Switch WiringVoltage Jumper Procedure Input WiringInput Wiring Specifications 4Input Wiring Pathway Input Wiring Procedure3Removal of Input Hardwiring Panels 5Input Hardwiring ConfigurationOutput Overcurrent Protection Output WiringOutput Wiring Configurations 8Output Wiring Configuration for 120V/240V Output Voltages Power Distribution Units Optional Output Wiring InstallationOutput Wiring Procedure Grounding Electrode OptionalRepo Switch Installation Remote Emergency Power Off SwitchRepo Specifications Cable SpecificationsContact Closure Repo Switch Connection Electrical Wiring TestElectrical Wiring Test/Checklist Vdc Repo Switch Connection16Startup Screen 4Input/Output Measured Voltage MultipliersElectrical Requirements and Procedures Setting Up The Power Array Removing Cover Grills Setup of Power ArrayFrame Leveling Procedure 1Removing Cover Grills from Frame2Location of Battery Module Bays Installing the Battery ModulesProcedure for Battery Module Installation 3Battery Alignment Grooves and RunnersInstalling the Power Modules Procedure for Power Module InstallationProcedure for Main Intelligence Module MIM Installation Installing the Main Intelligence Module MIMInstalling the Redundant Intelligence Module RIM 9Location of the MIM and RIMWall Mounting the PowerView Installing the PowerView InterfaceRemote Placement of the PowerView SmartSlotTM Interface Accessories 13PowerView Wall Mounting TemplateInstallation Test Installation Test/Checklist21Power The Load Sequence 19Power Status Screen1SymmetraTM Power Module/Frame Capacities 20Miscellaneous Status Screen24Return to On-Line Sequence 25Power Down the Load Sequence23Initiate a Self-Test Sequence System Setup PowerView Display PowerView Functions PowerView DisplayPhysical Features of the Powerview 1The PowerView InterfaceColor Description PowerView LEDs1Power Array Display LEDs Navigation KeysControl Startup ScreenTop-Level Menu Screen StatusDiagnostics SetupAccessories LoggingConfiguring & Operating the SymmetraTM 1Startup Screen Powering the Power ArrayIntroduction Voltage Status Screen Powering the LoadsReview Status Conditions Load With Redundancy Status Screen Battery Status ScreenPower Status Screen Miscellaneous Status Screen Alarm Threshold Status ScreenPerform a Self Test Alarm Thresholds Selection Screen Configure Shutdown ParametersConfigure Alarms Switching Audible Alarm Beeper OffReview Logging Menu Review Diagnostic InformationDiagnostics Menu Screen Event Log ScreenModule Replacement Technical Support and Obtaining a Replacement Module Module ReplacementModule Failure Alarm Indicators Returning Modules to APCInstalling the Replacement Module Battery Module ReplacementRemoving a Battery Module Replacement Battery Module VerificationReplacement Module Verification Power Module ReplacementRemoving the Power Module Replacement Redundant Intelligene Module Verification Installing the Replacement Main Intelligence ModuleInstalling the Replacement Redundant Intelligence Module Replacement MIM VerificationPowerView Display Messages PowerView Message Meaning Corrective Action Start-Up PowerView Message Meaning Corrective Action General Status Min Runtime restoredFailure PowerView Meaning Corrective Action Message ModuleAlarm ThresholPowerView Meaning Corrective Action Message Bypass FaultPowerView Message Meaning Corrective Action General Fault PowerView Display Messages Index Index SmartSlot accessories Toll free technical support