American Power Conversion SYMSTRF-PD, SYMINIF-PD Configuring & Operating the SymmetraTM

Page 53

Chapter Seven

Configuring & Operating the SymmetraTM

This chapter includes the procedures to use the PowerView to configure the system, and to initiate delivery of conditioned power to the load equipment. You will use the PowerView interface to set the configuration variables and alarm thresholds, and to review the status of the components of the system. Also included is the procedure for reviewing the power and user events log.

Image 53
Contents Syminif SYMINIF-PD Symstrf SYMSTRF-PD 990-7770A Revised 10/97 Radio Frequency InterferenceLife Support Policy Limited WarrantyTable of Contents Index Introduction Thank You SymmetraTM Overview Fig I-2Functional Diagram of a SymmetraTMTheory of Operation Fig I-1MiniFrame and MasterFrameBattery Source Power Processing SystemControl/User Interface TransformerOn-Line Operating Mode Load-Disconnect ModeFig I-3Load-Disconnect Operating Mode Fig I-4On-Line Operating ModeBypass Operating Mode On-Battery Operating ModeFig I-5On-Battery Operating Mode Fig I-6Bypass Operating ModeImportant Information DefinitionsSafety Information Important Safety Instructions Symbols Used In This ManualTech Physical Representation 1A Fully Loaded MiniFrame grill covers removed Power Array Frame2An Empty MasterFrame grill covers removed Power Module Powerview User InterfaceBattery Module Louvered Grill CoversMain Intelligence Module MIM Maintenance Bypass SwitchRedundant Intelligence Module RIM Input Circuit BreakerRear View of a Power Array Site Preparation Transporting Power Array to Installation Site Space and Weight ConsiderationsOperating Conditions BTU OutputSite Preparation Unpacking and Installing Frame Storage of Battery and Power Modules Tools Required for SetupInitial Inspection Check For DamageClean-UP Moving Battery & Power ModulesRemove Packing Materials Remove the Frame from the PalletWiring Requirements & Procedures Input Wiring SymmetraTM WiringOutput Wiring Repo Switch WiringVoltage Jumper Procedure Input WiringInput Wiring Specifications 3Removal of Input Hardwiring Panels Input Wiring Procedure4Input Wiring Pathway 5Input Hardwiring ConfigurationOutput Overcurrent Protection Output WiringOutput Wiring Configurations 8Output Wiring Configuration for 120V/240V Output Voltages Output Wiring Procedure Output Wiring InstallationPower Distribution Units Optional Grounding Electrode OptionalRepo Specifications Remote Emergency Power Off SwitchRepo Switch Installation Cable SpecificationsElectrical Wiring Test/Checklist Electrical Wiring TestContact Closure Repo Switch Connection Vdc Repo Switch Connection4Input/Output Measured Voltage Multipliers 16Startup ScreenElectrical Requirements and Procedures Setting Up The Power Array Frame Leveling Procedure Setup of Power ArrayRemoving Cover Grills 1Removing Cover Grills from FrameProcedure for Battery Module Installation Installing the Battery Modules2Location of Battery Module Bays 3Battery Alignment Grooves and RunnersProcedure for Power Module Installation Installing the Power ModulesInstalling the Redundant Intelligence Module RIM Installing the Main Intelligence Module MIMProcedure for Main Intelligence Module MIM Installation 9Location of the MIM and RIMWall Mounting the PowerView Installing the PowerView InterfaceRemote Placement of the PowerView 13PowerView Wall Mounting Template SmartSlotTM Interface AccessoriesInstallation Test/Checklist Installation Test1SymmetraTM Power Module/Frame Capacities 19Power Status Screen21Power The Load Sequence 20Miscellaneous Status Screen24Return to On-Line Sequence 25Power Down the Load Sequence23Initiate a Self-Test Sequence System Setup PowerView Display Physical Features of the Powerview PowerView DisplayPowerView Functions 1The PowerView Interface1Power Array Display LEDs PowerView LEDsColor Description Navigation KeysTop-Level Menu Screen Startup ScreenControl StatusAccessories SetupDiagnostics LoggingConfiguring & Operating the SymmetraTM 1Startup Screen Powering the Power ArrayIntroduction Voltage Status Screen Powering the LoadsReview Status Conditions Load With Redundancy Status Screen Battery Status ScreenPower Status Screen Miscellaneous Status Screen Alarm Threshold Status ScreenPerform a Self Test Configure Alarms Configure Shutdown ParametersAlarm Thresholds Selection Screen Switching Audible Alarm Beeper OffDiagnostics Menu Screen Review Diagnostic InformationReview Logging Menu Event Log ScreenModule Replacement Module Failure Alarm Indicators Module ReplacementTechnical Support and Obtaining a Replacement Module Returning Modules to APCRemoving a Battery Module Battery Module ReplacementInstalling the Replacement Module Replacement Battery Module VerificationReplacement Module Verification Power Module ReplacementRemoving the Power Module Installing the Replacement Redundant Intelligence Module Installing the Replacement Main Intelligence ModuleReplacement Redundant Intelligene Module Verification Replacement MIM VerificationPowerView Display Messages PowerView Message Meaning Corrective Action Start-Up Min Runtime restored PowerView Message Meaning Corrective Action General StatusAlarm PowerView Meaning Corrective Action Message ModuleFailure ThresholFault PowerView Meaning Corrective Action Message BypassPowerView Message Meaning Corrective Action General Fault PowerView Display Messages Index Index SmartSlot accessories Toll free technical support