American Power Conversion SYMSTRF3I user manual Reported Output Voltage OutVHz

Page 35

θ4. Press the “Escape” key on the display until the top level menu screen appears. Select “Status.” Pressing the enter key opens the voltage status screen as illustrated below.

Note: The fault light on the display may remain on. Disregard this visual indicator at this time.

θ5. Record input voltages below, and compare with measured voltages from step 1. If the two measurements are significantly different, contact APC SymmetraTM technical support.

Vin1: ______________________

Vin2: ______________________

Vin3: ______________________

θ6. Switch the maintenance bypass switch on.

Note: Disregard any LED indicator or fault messages on the PowerView.

Record output voltage below, and compare with Vin1 from step 5. If the two measurements are significantly different, contact APC SymmetraTM technical support.

Reported Output Voltage: Out:____________V_________Hz

θ7. Test the EPO switch. The system enable switch should physically move to the “stand by” position, and the system should shut down completely. If this does not occur, check the connections and the EPO switch to ensure they are installed and functioning properly.

θ8. Successful completion of steps 1 through 7 indicate that the system wiring is properly installed. Turn off breakers and switches and shut down input power to the system. Reinstall all wiring access panels on the frame.

Electrical Installation Completed by: __________________________________________

__________________________________________

__________________________________________

990-7166-001

Electrical Installation - Page 11

 

Image 35
Contents 380V/400V/415V 31 Frame Model SYMSTRF3I Life Support Policy Limited WarrantyTable of Contents Page Safety Symbols Safety InformationRadio Frequency Interference Operation SymbolsFrame Model Description Illustration WelcomeModels System Components SymmetraTM Component Description Model Specific Details SYMSTRF3I SYMSTRF3I SymmetraTM Components Description Specific To ModelBasic Operation Glossary of SymmetraTM Terms 8 Introduction Front Clearance Site RequirementsOperating Space Requirements Rear ClearanceModels Structural RequirementsHeat Output Short-Term Battery Module Storage RequirementsEnvironmental Requirements VAC Electrical Requirements Input/OutputEPO Specifications Electrical Requirements EPO SwitchElectrical Wiring Overview Inspect Packaging SymmetraTM Component Shipping Weight Shipping DimensionsReceiving and Unpacking Receiving the SymmetraTMMoving The SymmetraTM Frame and Modules Unpacking the SymmetraTM Frame 4 Receiving and Unpacking Model SYMSTRF3I Electrical InstallationElectrical Requirements EPO Switch Wiring RequiredElectrical Wiring Overview Input/Output Wiring Minimum Input/Output Wiring ProcedureWire Size Emergency Power Off Switch Wiring Required Emergency Power Off Switch Wiring Procedure Bypass Balancing Transformer Wiring Optional Wiring Symbol Description Minimum Wire Gauge Bypass Balance Transformer Wiring Procedure OptionalWiring Verification Procedure Reported Output Voltage OutVHz APC Worldwide Technical Support Telephone Numbers Securing The Frame Setting The Leveling Feet Startup ProcedurePower Module Installation Battery Module Installation System Startup Procedure System Settings Setup Configuration and Advanced OperationConfiguration Display SettingsAdvanced Operation PowerView Interface PowerView Component Description PowerView ComponentsLanguage Chip Replacement Procedure Language ConfigurationTop-Level Menu Screen Startup ScreenStatus ControlSetup PowerView CommandsLogging AccessoriesFunction Options DisplayHelp DiagnosticsWall Mounting the PowerView PowerView Meaning Corrective Action Message Start-Up TroubleshootingPowerView Meaning Corrective Action Message General Threshold PowerView Meaning Corrective Action Message ModuleAlarm FailureFault PowerView Meaning Corrective Action Message BypassGeneral PowerView Meaning Corrective Action Message6 Troubleshooting Appendix B Module Failure Alarm Indicators Module ReplacementReturning Modules to APC Technical Support & Obtaining Replacement ModuleReplacement Battery Module Verification Battery Module ReplacementReplacement Module Verification Power Module ReplacementReplacement RIM Verification Main Intelligence Module ReplacementReplacement MIM Verification Redundant Intelligence Module Replacement6 Module Replacement Appendix C Operation SpecificationsInput Specifications Compliance Specifications Output SpecificationsPhysical Specifications Page Tel0800 180