American Power Conversion SYMSTRF3I user manual Wall Mounting the PowerView

Page 52

νThe PowerV ew cable must be d sconnected from the PowerV ew before proceed ng.

Wall Mounting the PowerView

Use the template below to install the PowerView on a wall:

1.Note the four mounting slots molded into the back of the PowerView.

2.Secure four large screws on a clean dry wall surface.

3.Leave each screw extending 5/16" (8mm) out from the surface of the wall.

4.Connect the 20’ PowerView remote cable (provided) to the PowerView and to the PowerView communication port at the rear of the SymmetraTM frame.

5.Position the PowerView onto the screws.

Cut Here

9cm (3 1/2")

Up

10.3cm (4")

8cm (3 1/8")

Page 10 - The PowerView Interface - Appendix A

990-7169-001

 

Image 52
Contents 380V/400V/415V 31 Frame Model SYMSTRF3I Limited Warranty Life Support PolicyTable of Contents Page Safety Information Safety SymbolsOperation Symbols Radio Frequency InterferenceModels WelcomeFrame Model Description Illustration System Components SymmetraTM Component Description Model Specific Details SYMSTRF3I SymmetraTM Components Description Specific To Model SYMSTRF3IBasic Operation Glossary of SymmetraTM Terms 8 Introduction Site Requirements Operating Space RequirementsRear Clearance Front ClearanceStructural Requirements ModelsEnvironmental Requirements Short-Term Battery Module Storage RequirementsHeat Output Electrical Requirements Input/Output VACElectrical Requirements EPO Switch EPO SpecificationsElectrical Wiring Overview SymmetraTM Component Shipping Weight Shipping Dimensions Receiving and UnpackingReceiving the SymmetraTM Inspect PackagingMoving The SymmetraTM Frame and Modules Unpacking the SymmetraTM Frame 4 Receiving and Unpacking Electrical Installation Model SYMSTRF3IEPO Switch Wiring Required Electrical RequirementsElectrical Wiring Overview Input/Output Wiring Wire Size Input/Output Wiring ProcedureMinimum Emergency Power Off Switch Wiring Required Emergency Power Off Switch Wiring Procedure Bypass Balancing Transformer Wiring Optional Bypass Balance Transformer Wiring Procedure Optional Wiring Symbol Description Minimum Wire GaugeWiring Verification Procedure Reported Output Voltage OutVHz APC Worldwide Technical Support Telephone Numbers Startup Procedure Securing The Frame Setting The Leveling FeetPower Module Installation Battery Module Installation System Startup Procedure Configuration and Advanced Operation ConfigurationDisplay Settings System Settings SetupAdvanced Operation PowerView Interface PowerView Components PowerView Component DescriptionLanguage Configuration Language Chip Replacement ProcedureStartup Screen Top-Level Menu ScreenControl StatusPowerView Commands SetupAccessories LoggingDisplay Function OptionsDiagnostics HelpWall Mounting the PowerView Troubleshooting PowerView Meaning Corrective Action Message Start-UpPowerView Meaning Corrective Action Message General PowerView Meaning Corrective Action Message Module AlarmFailure ThresholdPowerView Meaning Corrective Action Message Bypass FaultPowerView Meaning Corrective Action Message General6 Troubleshooting Appendix B Module Replacement Module Failure Alarm IndicatorsTechnical Support & Obtaining Replacement Module Returning Modules to APCBattery Module Replacement Replacement Battery Module VerificationPower Module Replacement Replacement Module VerificationMain Intelligence Module Replacement Replacement MIM VerificationRedundant Intelligence Module Replacement Replacement RIM Verification6 Module Replacement Appendix C Input Specifications SpecificationsOperation Physical Specifications Output SpecificationsCompliance Specifications Page Tel0800 180