American Power Conversion SYMSTRF3I user manual Power Module Installation

Page 38

Power Module Installation

1.Align the runners of a power module with the alignment grooves in the bottom module bay. Firmly slide the power module into the frame until the “drop-lock” engages.

2.Swing the flip latch up and fasten the screw to the power module. Do not overtighten.

3.Follow this procedure to install all power modules.

Notice!

νPower modules are installed on the left, battery modules are installed on the right.

νAlways install power modules into the lowest available bay.

νIf the power modules were installed at the factory, remove each of the shipping retainers that secured the modules during shipping. Secure the flip latches.

Page 2 - Start-Up Procedure

990-7167-001

 

Image 38
Contents 380V/400V/415V 31 Frame Model SYMSTRF3I Limited Warranty Life Support PolicyTable of Contents Page Safety Information Safety SymbolsOperation Symbols Radio Frequency InterferenceFrame Model Description Illustration WelcomeModels System Components SymmetraTM Component Description Model Specific Details SYMSTRF3I SymmetraTM Components Description Specific To Model SYMSTRF3IBasic Operation Glossary of SymmetraTM Terms 8 Introduction Rear Clearance Site RequirementsOperating Space Requirements Front ClearanceStructural Requirements ModelsHeat Output Short-Term Battery Module Storage RequirementsEnvironmental Requirements Electrical Requirements Input/Output VACElectrical Requirements EPO Switch EPO SpecificationsElectrical Wiring Overview Receiving the SymmetraTM SymmetraTM Component Shipping Weight Shipping DimensionsReceiving and Unpacking Inspect PackagingMoving The SymmetraTM Frame and Modules Unpacking the SymmetraTM Frame 4 Receiving and Unpacking Electrical Installation Model SYMSTRF3IEPO Switch Wiring Required Electrical RequirementsElectrical Wiring Overview Input/Output Wiring Minimum Input/Output Wiring ProcedureWire Size Emergency Power Off Switch Wiring Required Emergency Power Off Switch Wiring Procedure Bypass Balancing Transformer Wiring Optional Bypass Balance Transformer Wiring Procedure Optional Wiring Symbol Description Minimum Wire GaugeWiring Verification Procedure Reported Output Voltage OutVHz APC Worldwide Technical Support Telephone Numbers Startup Procedure Securing The Frame Setting The Leveling FeetPower Module Installation Battery Module Installation System Startup Procedure Display Settings Configuration and Advanced OperationConfiguration System Settings SetupAdvanced Operation PowerView Interface PowerView Components PowerView Component DescriptionLanguage Configuration Language Chip Replacement ProcedureStartup Screen Top-Level Menu ScreenControl StatusPowerView Commands SetupAccessories LoggingDisplay Function OptionsDiagnostics HelpWall Mounting the PowerView Troubleshooting PowerView Meaning Corrective Action Message Start-UpPowerView Meaning Corrective Action Message General Failure PowerView Meaning Corrective Action Message ModuleAlarm ThresholdPowerView Meaning Corrective Action Message Bypass FaultPowerView Meaning Corrective Action Message General6 Troubleshooting Appendix B Module Replacement Module Failure Alarm IndicatorsTechnical Support & Obtaining Replacement Module Returning Modules to APCBattery Module Replacement Replacement Battery Module VerificationPower Module Replacement Replacement Module VerificationRedundant Intelligence Module Replacement Main Intelligence Module ReplacementReplacement MIM Verification Replacement RIM Verification6 Module Replacement Appendix C Operation SpecificationsInput Specifications Compliance Specifications Output SpecificationsPhysical Specifications Page Tel0800 180