American Power Conversion SYMSTRF3I user manual Unpacking the SymmetraTM Frame

Page 23

Unpacking the SymmetraTM Frame

1.Remove packaging materials and the grill covers. Use care to prevent scratching the surface of the frame.

2.Locate the pallet ramp that is shipped beneath the top corrogated shipping cover.

3.Follow the steps below to remove the frame from the pallet. After unpacking, carefully roll the SymmetraTM to the installation site. It is now ready to be wired.

Caution!

νTwo people are required to remove the frame from the pallet.

νAll four leveling feet at the base of the SymmetraTM frame must be fully retracted before rolling the frame from the pallet.

νIf rolling the frame on the casters over objects such as door thresholds or floor irregularities, be careful to prevent the frame from tipping.

990-7165-001

Receiving and Unpacking - Page 3

 

Image 23
Contents 380V/400V/415V 31 Frame Model SYMSTRF3I Life Support Policy Limited WarrantyTable of Contents Page Safety Symbols Safety InformationRadio Frequency Interference Operation SymbolsFrame Model Description Illustration WelcomeModels System Components SymmetraTM Component Description Model Specific Details SYMSTRF3I SYMSTRF3I SymmetraTM Components Description Specific To ModelBasic Operation Glossary of SymmetraTM Terms 8 Introduction Front Clearance Site RequirementsOperating Space Requirements Rear ClearanceModels Structural RequirementsHeat Output Short-Term Battery Module Storage RequirementsEnvironmental Requirements VAC Electrical Requirements Input/OutputEPO Specifications Electrical Requirements EPO SwitchElectrical Wiring Overview Inspect Packaging SymmetraTM Component Shipping Weight Shipping DimensionsReceiving and Unpacking Receiving the SymmetraTMMoving The SymmetraTM Frame and Modules Unpacking the SymmetraTM Frame 4 Receiving and Unpacking Model SYMSTRF3I Electrical InstallationElectrical Requirements EPO Switch Wiring RequiredElectrical Wiring Overview Input/Output Wiring Minimum Input/Output Wiring ProcedureWire Size Emergency Power Off Switch Wiring Required Emergency Power Off Switch Wiring Procedure Bypass Balancing Transformer Wiring Optional Wiring Symbol Description Minimum Wire Gauge Bypass Balance Transformer Wiring Procedure OptionalWiring Verification Procedure Reported Output Voltage OutVHz APC Worldwide Technical Support Telephone Numbers Securing The Frame Setting The Leveling Feet Startup ProcedurePower Module Installation Battery Module Installation System Startup Procedure System Settings Setup Configuration and Advanced OperationConfiguration Display SettingsAdvanced Operation PowerView Interface PowerView Component Description PowerView ComponentsLanguage Chip Replacement Procedure Language ConfigurationTop-Level Menu Screen Startup ScreenStatus ControlSetup PowerView CommandsLogging AccessoriesFunction Options DisplayHelp DiagnosticsWall Mounting the PowerView PowerView Meaning Corrective Action Message Start-Up TroubleshootingPowerView Meaning Corrective Action Message General Threshold PowerView Meaning Corrective Action Message ModuleAlarm FailureFault PowerView Meaning Corrective Action Message BypassGeneral PowerView Meaning Corrective Action Message6 Troubleshooting Appendix B Module Failure Alarm Indicators Module ReplacementReturning Modules to APC Technical Support & Obtaining Replacement ModuleReplacement Battery Module Verification Battery Module ReplacementReplacement Module Verification Power Module ReplacementReplacement RIM Verification Main Intelligence Module ReplacementReplacement MIM Verification Redundant Intelligence Module Replacement6 Module Replacement Appendix C Operation SpecificationsInput Specifications Compliance Specifications Output SpecificationsPhysical Specifications Page Tel0800 180