Moving The SymmetraTM Frame and Modules

The frame (bolted to the pallet), should be positioned with a pallet jack or a fork lift. Leave enough space to unpack the frame, install the ramp, and for two people to roll it onto the floor. The SymmetraTM frame can be moved over a flat, smooth floor surface by rolling it on the frame casters. The individually boxed power and battery modules should be stacked close to the installation site.

Caution!

νDo not install battery modules into the SymmetraTM frame until after electrical wiring connections have been made, and the system is ready to be powered.

νIf battery modules are to be stored for an extended time, store them in a dry, cool environment.

νBattery modules are heavy (70 lb). Two people are required to carry, move and install them.

Page 2 - Receiving and Unpacking

990-7165-001

 

Image 22
Contents 380V/400V/415V 31 Frame Model SYMSTRF3I Limited Warranty Life Support PolicyTable of Contents Page Safety Information Safety SymbolsOperation Symbols Radio Frequency InterferenceModels WelcomeFrame Model Description Illustration System Components SymmetraTM Component Description Model Specific Details SYMSTRF3I SymmetraTM Components Description Specific To Model SYMSTRF3IBasic Operation Glossary of SymmetraTM Terms 8 Introduction Rear Clearance Site RequirementsOperating Space Requirements Front ClearanceStructural Requirements ModelsEnvironmental Requirements Short-Term Battery Module Storage RequirementsHeat Output Electrical Requirements Input/Output VACElectrical Requirements EPO Switch EPO SpecificationsElectrical Wiring Overview Receiving the SymmetraTM SymmetraTM Component Shipping Weight Shipping DimensionsReceiving and Unpacking Inspect PackagingMoving The SymmetraTM Frame and Modules Unpacking the SymmetraTM Frame 4 Receiving and Unpacking Electrical Installation Model SYMSTRF3IEPO Switch Wiring Required Electrical RequirementsElectrical Wiring Overview Input/Output Wiring Wire Size Input/Output Wiring ProcedureMinimum Emergency Power Off Switch Wiring Required Emergency Power Off Switch Wiring Procedure Bypass Balancing Transformer Wiring Optional Bypass Balance Transformer Wiring Procedure Optional Wiring Symbol Description Minimum Wire GaugeWiring Verification Procedure Reported Output Voltage OutVHz APC Worldwide Technical Support Telephone Numbers Startup Procedure Securing The Frame Setting The Leveling FeetPower Module Installation Battery Module Installation System Startup Procedure Display Settings Configuration and Advanced OperationConfiguration System Settings SetupAdvanced Operation PowerView Interface PowerView Components PowerView Component DescriptionLanguage Configuration Language Chip Replacement ProcedureStartup Screen Top-Level Menu ScreenControl StatusPowerView Commands SetupAccessories LoggingDisplay Function OptionsDiagnostics HelpWall Mounting the PowerView Troubleshooting PowerView Meaning Corrective Action Message Start-UpPowerView Meaning Corrective Action Message General Failure PowerView Meaning Corrective Action Message ModuleAlarm ThresholdPowerView Meaning Corrective Action Message Bypass FaultPowerView Meaning Corrective Action Message General6 Troubleshooting Appendix B Module Replacement Module Failure Alarm IndicatorsTechnical Support & Obtaining Replacement Module Returning Modules to APCBattery Module Replacement Replacement Battery Module VerificationPower Module Replacement Replacement Module VerificationRedundant Intelligence Module Replacement Main Intelligence Module ReplacementReplacement MIM Verification Replacement RIM Verification6 Module Replacement Appendix C Input Specifications SpecificationsOperation Physical Specifications Output SpecificationsCompliance Specifications Page Tel0800 180