Input/Output Wiring Procedure

1.Mount the Input/Output Wiring Panel to the lower rear frame panel.

Note: The I/O wiring panel and the cover plate are shipped in the frame accessory package located in the upper right module bay of the frame. Remove the four mounting screws from the rear of the SymmetraTM frame, and use them to install the panel. Place the cover plate aside.

2.Attach flexible metal conduit to the wiring panel.

Note: If the pre-installed knock-outs do not fit your strain relief hardware, use existing knock-out as a pilot to create a new hole.

3.Pull the wire through the conduit. Leave enough wire extending from the conduit strain relief to reach terminal blocks.

4.Strip approximately 1/2” (13 mm) of insulation from the end of each wire.

5.Connect the ground wires to the green/yellow grounding terminal block connections.

Note: Both input and output grounds attach to the same terminal block. Make sure to wire them correctly.

6.Connect the neutral wires to terminal block connections marked “N” in blue.

Caution!

νTighten screws to ensure good electrical connection.

7.Connect remaining power wires to terminal block connections.

8.Inspect wiring for proper connections.

Note: Do not mount the wiring cover plate until the wiring verification procedure is complete.

 

Wiring

Symbol

Description

Minimum

 

Wire Size

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Output Ground

 

 

 

 

 

 

 

 

Safety Ground (Green/Yellow)

 

 

 

 

 

 

 

 

 

 

Install Second!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

Output Neutral

 

N

Output Return (Blue)

#3 AWG (25mm2)

Install Fourth!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

Output Phase

L1

Output Power

 

 

 

 

 

 

 

 

 

 

 

 

 

A

Input Ground

 

 

 

 

 

 

 

 

Primary Safety Ground (Green/Yellow)

 

Install First!

 

 

 

 

 

 

 

 

#8 AWG (10mm2) if a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

Input Neutral

 

N

Input Return (Blue)

bypass transformer is

Install Third!

 

installed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

Input Phase

L3

Input Power

#3 AWG (25mm2) if a

 

 

D

Input Phase

L2

Input Power

bypass transformer is

not installed.

 

 

 

 

 

 

 

 

 

 

 

 

E

Input Phase

L1

Input Power

 

 

 

 

 

 

 

 

 

 

 

 

 

990-7166-001

Electrical Installation - Page 5

 

Image 29
Contents 380V/400V/415V 31 Frame Model SYMSTRF3I Life Support Policy Limited WarrantyTable of Contents Page Safety Symbols Safety InformationRadio Frequency Interference Operation SymbolsFrame Model Description Illustration WelcomeModels System Components SymmetraTM Component Description Model Specific Details SYMSTRF3I SYMSTRF3I SymmetraTM Components Description Specific To ModelBasic Operation Glossary of SymmetraTM Terms 8 Introduction Operating Space Requirements Site RequirementsRear Clearance Front ClearanceModels Structural RequirementsHeat Output Short-Term Battery Module Storage RequirementsEnvironmental Requirements VAC Electrical Requirements Input/OutputEPO Specifications Electrical Requirements EPO SwitchElectrical Wiring Overview Receiving and Unpacking SymmetraTM Component Shipping Weight Shipping DimensionsReceiving the SymmetraTM Inspect PackagingMoving The SymmetraTM Frame and Modules Unpacking the SymmetraTM Frame 4 Receiving and Unpacking Model SYMSTRF3I Electrical InstallationElectrical Requirements EPO Switch Wiring RequiredElectrical Wiring Overview Input/Output Wiring Minimum Input/Output Wiring ProcedureWire Size Emergency Power Off Switch Wiring Required Emergency Power Off Switch Wiring Procedure Bypass Balancing Transformer Wiring Optional Wiring Symbol Description Minimum Wire Gauge Bypass Balance Transformer Wiring Procedure OptionalWiring Verification Procedure Reported Output Voltage OutVHz APC Worldwide Technical Support Telephone Numbers Securing The Frame Setting The Leveling Feet Startup ProcedurePower Module Installation Battery Module Installation System Startup Procedure Configuration Configuration and Advanced OperationDisplay Settings System Settings SetupAdvanced Operation PowerView Interface PowerView Component Description PowerView ComponentsLanguage Chip Replacement Procedure Language ConfigurationTop-Level Menu Screen Startup ScreenStatus ControlSetup PowerView CommandsLogging AccessoriesFunction Options DisplayHelp DiagnosticsWall Mounting the PowerView PowerView Meaning Corrective Action Message Start-Up TroubleshootingPowerView Meaning Corrective Action Message General Alarm PowerView Meaning Corrective Action Message ModuleFailure ThresholdFault PowerView Meaning Corrective Action Message BypassGeneral PowerView Meaning Corrective Action Message6 Troubleshooting Appendix B Module Failure Alarm Indicators Module ReplacementReturning Modules to APC Technical Support & Obtaining Replacement ModuleReplacement Battery Module Verification Battery Module ReplacementReplacement Module Verification Power Module ReplacementReplacement MIM Verification Main Intelligence Module ReplacementRedundant Intelligence Module Replacement Replacement RIM Verification6 Module Replacement Appendix C Operation SpecificationsInput Specifications Compliance Specifications Output SpecificationsPhysical Specifications Page Tel0800 180